Production Safety of Communications ProjectsCourse No. : EQA-SP-002Composer : Engineering Quality Dept.
HUAWEI TECHNOLOGIES CO., LTD. Page 2All rights reserved
The Meaning of Production Safety
Production safety is the most important matter in any construction projects. The importance of the production safety and service standardization has been repeatedly emphasized by national standards and relevant company documents .
Communications accidents bring great impacts to people’s production, life and national security.
To avoid artificial safety responsibility accidents, which brings serious effects to clients and our company, and to strengthen the management guidance, regulate construction activities and sharpen staff's consciousness of production safety, we have compiled this “Manual of Production Safety of Communications Projects ”.
HUAWEI TECHNOLOGIES CO., LTD. Page 3All rights reserved
Production Safety---Catalogue
Overview
Personal Safety
Equipment and Property Safety
General Operation Safety Requirements
Data Operation and Software Debugging
HUAWEI TECHNOLOGIES CO., LTD. Page 4All rights reserved
Overview
Production Safety
Person in charge of production Safety--- Project Manager/ Engineering Supervisor
People
Special Professions ( jobs at a height , electricians )---holding professional certificate for the post
Engineering personnel m
ust get production safety training before construction starts. .
Regulation
Safety Management Regulation at Client Site
Service Criterion and Serious Accident Management Flow of Huawei Technologies
Design documents, Product Installation Regulation and Data Setting Regulation
warning signs, em
ergence measures for the equipm
ent and personal safety rescue m
easures
Protective facilities and safety operation tools
are required for operations at dangerous areas.
Rules and R
egulations for production safety are to be hung at the construction site.
Managem
ent on Site
Education and Training
HUAWEI TECHNOLOGIES CO., LTD. Page 5All rights reserved
Personal Safety---Handling Goods
Sufficient manpower and reliable transportation tools are required for handling the equipment. Make sure that ropes must be tied tightly and soundly, in order to keep people from being injured.
Wear gloves and use tools properly when opening a case.
To avoid overturn, assistance is required to help keeping the cabinet balanced during the process of equipment fixation.
without gloves keep the cabinet balanced
HUAWEI TECHNOLOGIES CO., LTD. Page 6All rights reserved
Personal Safety---Use of Tools
Use proper tools which are in normal condition, use tools correctly during the process of installation.
Follow the operation instructions strictly when sharp and pointed tools, like electric drills, electric saws and cutting tools, are used in equipment installation process.
Tools in good conditions Crimp the copper lug with crimper
HUAWEI TECHNOLOGIES CO., LTD. Page 7All rights reserved
Personal Safety---Operations at a Height
Personnel working at a height should have corresponding certificates, should
be in good physical condition without suffering from acrophobia.
No drinking before working at a height.
HUAWEI TECHNOLOGIES CO., LTD. Page 8All rights reserved
Personal Safety---Indoor Operations at a Height
Make sure the ladder( or other load bearing facility ) is rigid and stable when working at a height.
Place operation tools and materials properly to avoid falling off.
HUAWEI TECHNOLOGIES CO., LTD. Page 9All rights reserved
Personal Safety---Outdoor Operations at a Height
Take safety measures ( e.g. tie the
safe rope) for outer-wall overhead
jobs.
Operations are strictly prohibited
under critical weather conditions ( e.g.
strong wind, thunderstorm).
Try to avoid operations at night and
in rain and snow.
Operators should wear safe ropes,
tight clothes and rubber shoes, with all
tools in kit-bags.
HUAWEI TECHNOLOGIES CO., LTD. Page 10All rights reserved
Personal Safety--- Outdoor Operations at a Height
Personnel working on ground should
take protection measures; wear safety
helmet ; unrelated personnel should
keep away from the operation site.
Tightly bind and fix the goods to be
moved upwards, so as to prevent
them falling off and injuring people
and damaging the goods.
HUAWEI TECHNOLOGIES CO., LTD. Page 11All rights reserved
Personal safety---Relevant Environment
If large amounts of harmful dust or gas are resulted from the engineering
process, they should be ventilated and removed immediately. Clear up
engineering waste and pollutants on site as soon as possible.
Dust absorption Dust Sweeping
HUAWEI TECHNOLOGIES CO., LTD. Page 12All rights reserved
Personal Safety---Goods Storing
Pile the goods in order to avoid collapse.
Remove packaging-box boards with sharp edges from the operation site as
soon as possible to avoid injuring people.
Stocked in order Packaging-case board with nails should not towards the passageway,
HUAWEI TECHNOLOGIES CO., LTD. Page 13All rights reserved
Personal Safety---Operations with Electricity
Carry out all the equipment and hardware installation operations with no power supply switched on.
If operations on the powered-on equipment are needed, except for the tools, there should be no exposed metal items on the operator’s clothes, and metal surface of the tools ( other than the working area ) should be insulated.
Turn off the power Insulate the tools
HUAWEI TECHNOLOGIES CO., LTD. Page 14All rights reserved
Personal Safety---Relevant Environment
Place warning signs in dangerous areas, like cable-through holes and vertical cabling wells on the floor. Take protective measures when approaching.
Cover the well Warning signs
Vertical Cabling well
Pay attention
to safety
HUAWEI TECHNOLOGIES CO., LTD. Page 15All rights reserved
Personal Safety--- Floor Treatment
Reinstall the anti-static floor on the walking passages firmly after equipment
and hardware installation, so as to avoid people from falling down.
Even and firm Uneven
HUAWEI TECHNOLOGIES CO., LTD. Page 16All rights reserved
Personal Safety ---Photoelectric radiation
Avoid the antenna from direct radiation to the human body in the front during operation on antenna feeder of the running base station equipment.
Don’t look straight at a running optical port, so as to avoid damage to the eyes.
HUAWEI TECHNOLOGIES CO., LTD. Page 17All rights reserved
Personal Safety---Warning Sign
Place corresponding warning signs for dangerous areas like vertical wells and high voltage power supply facilities.
no smoking in the equipment room high voltage power
HUAWEI TECHNOLOGIES CO., LTD. Page 18All rights reserved
Equipment and property Safety---Unpacking and Goods Check Flow(1)
Organize to unpack and check the goods as soon as possible after its
arrival. Sign to confirm together with the client if no problem is found. If
the ownership of the goods is transferred to the client after unpacking as
stipulated in the contract, the corresponding responsibility of storing the
goods is transferred to the client at the same time. If the contract doesn’t
prescribe that the ownership of the goods should be transferred to the
client and before the goods are handed over, the project manager
should take the responsibility of storage and take necessary storage
measures after negotiation with the client, and both parties can negotiate
about regulations of goods storage if necessary and abide by them.
HUAWEI TECHNOLOGIES CO., LTD. Page 19All rights reserved
Equipment and property Safety---Unpacking and Goods Check Flow(2)
The project manager should cooperate with the company’s related
departments in time to handle goods problems caused by consignment
and transportation of Huawei company. The project manager should also
actively cooperate with the client to treat goods problems that are not
caused by Huawei company.
HUAWEI TECHNOLOGIES CO., LTD. Page 20All rights reserved
Equipment and property Safety---Unpacking and Goods Check Flow(3)
Arrival of Goods
The contract doesn’t stipulate to transfer the ownership of goods or before the goods are handed over.
The client is responsible for
keeping the goods.
Unpacking and Checking
sign confirmation
The contract stipulates that the ownership of goods is
transferred to the client
The project management and client negotiate about the storage
measures of goods.
goods problems not caused by
Huawei company
Goods Problems caused by Huawei
company’s consignment and
transportation
HUAWEI TECHNOLOGIES CO., LTD. Page 21All rights reserved
Equipment and property safety--- goods piling(1)
Take corresponding protective measures during transportation and
storage based on the storage and transportation signs silk-printed on the
outside of packing cases, such as ‘upward', ‘fragile’ , ‘waterproof’ ,and
‘maximum piling-up number’. Pay attention to keep cases upwards,
handle them with care, prevent vibration, and cover them from rain.
Notice the maximum number of pile and weight of the upper pile.
HUAWEI TECHNOLOGIES CO., LTD. Page 22All rights reserved
Equipment and property safety--- goods piling(2)
Fragile No rolling
Maximum piling-up number
Upward
Center of gravity
No piling up
HUAWEI TECHNOLOGIES CO., LTD. Page 23All rights reserved
Equipment and property Safety--- Goods Piling(3)
Pile the goods in order and firmly, so as to prevent them from falling down by
accident. Transportation passages should be reserved. The weight of goods
should not exceed than the load bearing capacity of the site.
HUAWEI TECHNOLOGIES CO., LTD. Page 24All rights reserved
Equipment and Property Safety--- Environment for Goods Storage
The storage location should be safe.
Generally indoor storage should be guaranteed.
In case of outdoor storage, conditions below should be confirmed:
necessary waterproof measures to keep rain from the packing cases,
and the packing cases are in good condition and accumulated water will
not enter the cases.
HUAWEI TECHNOLOGIES CO., LTD. Page 25All rights reserved
Register for items brought out
Equipment and Property Safety---Daily Use(1)
Tools, instruments and materials borrowed from the client should be kept properly and returned on time. Do not use client’s property without permission.
During installation, circuit boards and devices to be acquired for installation at other working sites or to be returned to Huawei for replacement due to faults can only be taken away from the client’s storage with permission of the client, and they should be returned to the client at the specified time.
Tools, instruments and materials owned by Huawei should be checked and registered according to the client’s management rules when they are carried into or out of the working site.
HUAWEI TECHNOLOGIES CO., LTD. Page 26All rights reserved
Equipment and Property Safety---Daily use(2)
Do not lend the equipment room keys to anyone else if you keep the keys as the client believes in you. Return them in time after use.
Every day before leaving the equipment room after work, make sure to check and close the doors and windows according to the client’s equipment room management rules.
Note:
1.The equipment room is an important place. People are not allowed to go in and out freely.
2. Keys are not allowed to lend for the purpose of facilitating management.
3.Return the keys in time, facilitating the client to handle abrupt events.
4.Close doors and windows to keep away from thefts, wind, rain , dust, and little animals like mice, preventing damages thereof.
HUAWEI TECHNOLOGIES CO., LTD. Page 27All rights reserved
Equipment and Property Safety---Equipment Safety(1)
Avoid any interference to the normal operation of the client’s existing equipment during the constructing process. Avoid bumping into, stepping on or pressing on client’s equipment and cables.
Do not touch any client’s equipment unrelated to current engineering .
Note: Strictly prohibit to use the broken cables as the following figure.
Break the trunks Break the optical fiber
HUAWEI TECHNOLOGIES CO., LTD. Page 28All rights reserved
Equipment and Property Safety---Equipment Safety(2)
Hot-line operation is generally not permitted during the constructing process.
In case of hot-line operation, pay attention to keep the tools and materials at a safe place and avoid contacting them with powered areas of the equipment, so as to avoid short circuit accidents.
Note: The following Hot-line operation is strictly prohibited.
Short circuit caused by hot-line operation
Tools and materials placed on the top of the cabinet
HUAWEI TECHNOLOGIES CO., LTD. Page 29All rights reserved
General Operation Safety Requirements---Goods Handling(1)
Hold the designed lifting points
when moving the cabinet. Wear
clean gloves in case of touching
color zinc-plated metal parts.
Beam of the cabinet, designed lifting point
HUAWEI TECHNOLOGIES CO., LTD. Page 30All rights reserved
General Operation Safety Requirements---Goods Handling(2)Unpack and check the packing cases after the equipment and goods arrived at site, make sure that the outer packing cases of the goods are free of damage, deformation or water soaking.
Anti-shock and anti-tipping tags show that the shock degree and tipping degree is within the limit. If not, check and feedback according to ‘unpacking and check flow’.
HANDLEWITH CARE
WARNINGWARNING
RED INDICATES ROUTH HANDLINGIF RED, NOTE ON BILL OF LADINGINSPECTION MAY BE WARRANTED
MODEL L-47(50-G)
IF REDINSPECT CONTENTS,
TIPPING HAS OCCURRED.
MEDIA RECOVERY,DALLASTX.1-800-527-9497 U.S.PAT.NO.Re.32,570
Anti-crashing tag Anti –overturn tag
HUAWEI TECHNOLOGIES CO., LTD. Page 31All rights reserved
General Operation Safety Requirements ---Use of Tools Tools are provided correctly, in good condition, and used properly, so as to avoid any damages to parts or equipment.
Place tools properly when the operation position is higher than the equipment, so as to avoid falling down of the tools, causing short circuit, components damage and personal injury.
Short circuit caused by falling toolsUse proper tools
HUAWEI TECHNOLOGIES CO., LTD. Page 32All rights reserved
General Operation Safety Requirements---Engineering Boundaries Implement the engineering according to the boundary as stipulated in
the contract.
Engineering boundary in the contract is a division of responsibilities between both parties.
Handover at the engineering boundary should follow the client’s engineering regulations and respect the client’s actual situation.
During construction, pay attention to:
PDF.MDF.ODF.DDF
cabling at the cabinets
tags
equipment room and other
HUAWEI TECHNOLOGIES CO., LTD. Page 33All rights reserved
General Operation Safety Requirements ---Safety Utilization of Electric Power(1)
Apply to the client’s power management department for large power
operations. Power supply should not be connected for operations without
approval of the client.
Power-on operations should strictly follow the requirements of
engineering boundary division as stipulated in the contract. If it is
stipulated in the engineering boundary division that the power supply
(distribution ) equipment at the client’s side are operated by the client
itself , it is not allowed to carry out the power-on operations on such
power supply (distribution ) equipment instead of the client.
HUAWEI TECHNOLOGIES CO., LTD. Page 34All rights reserved
General Operation Safety Requirements---Safety Utilization of Electricity Power(2) Before operation, check the rated power supply capability used for the c
onstruction or equipment at the connecting points specified by the client
(cutting-off current for air-break switches or fuses), and make sure it is la
rger than the maximum starting current used for the construction or equi
pment .
The rated current of air-break switches or fuses should not be too large,
otherwise protection function will not work.
Power-on operations should strictly follow the requirements of engineeri
ng interface division.
It is not allowed to carry on power-on operations to power supply facilitie
s substituting for users.
HUAWEI TECHNOLOGIES CO., LTD. Page 35All rights reserved
General Operation Safety Requirements---Safety Utilization of Electricity Power(3)
Complete cables should be used for
power cables and grounding cables.
No joints are allowed in the middle of
these cables to ensure the excellent
insulation performance of non-contact
parts of cables.
Power cables will be heated during
operation. They must be laid
separately from other signal cables.
Power cables separated from other cables
HUAWEI TECHNOLOGIES CO., LTD. Page 36All rights reserved
General Operation Safety Requirements---Safety Utilization of Electricity Power(4)
Diameters of the power cables
should meet the requirement that the
maximum operating current for the
powered equipment can pass through
safely. Surplus of power cables should
not be wound into coils but cut off.
Outer jacket of power cables must not
be pressed upon by other objects,
especially sharp and pointed items
must not contact the outer jacket of
power cables.
Too much surplus of power cables
HUAWEI TECHNOLOGIES CO., LTD. Page 37All rights reserved
General Operation Safety Requirements ---Fire Protection and Burglary Prevention(1)
Equipment installation, cable laying and spare parts and material piling up in the equipment room should meet the fireproof requirements of the equipment room, not block the fire passage and not affect ventilation and heat dissipation of the equipment room.
Before starting high temperature operations ( e.g. electric welding, tin soldering, and material heating ), you must clean up the operation area, and take the isolation and emergency remedial measures.
Un-blocked fire passage Passage blocked by goods
HUAWEI TECHNOLOGIES CO., LTD. Page 38All rights reserved
General Operation Safety Requirements --Fire Protection and Burglary Prevention(2)
Equipment installation should not
affect the application efficacy of fire-
protection and burglary-prevention
facilities. In case it is really necessary
to change the function layout of such
facilities, explain to the client ,and the
client should apply to the relevant
authorities. Implementation is not
allowed without approval. fire-protection facilities
HUAWEI TECHNOLOGIES CO., LTD. Page 39All rights reserved
General Operation Safety Requirements --Low Temperature Operation
The outer jacket material of cables becomes hard and brittle and breaks
easily at low temperatures . Storage and operation should be carried out
at room temperature in winter. Avoid any strong force externally exerted
upon the outer jacket, such as throwing, twisting and knocking.
high temperature operation.
low temperature operation.
Handling of fire-protection and
burglary-prevention facilities.
HUAWEI TECHNOLOGIES CO., LTD. Page 40All rights reserved
General Operation Safety Requirements--- Operation Anti-static MeasuresWear antistatic wrist straps and use other antistatic devices when operating the equipment boards and hard disks containing electronic devices.
Protective tools, packing material and working environment should meet the requirements of “Regulations on Anti-static Protection Management in the Equipment Room’.
HUAWEI TECHNOLOGIES CO., LTD. Page 41All rights reserved
General Operation Safety Requirements ---Cleaning up(1)Check, sort and store materials and
tools properly after work every day.
Turn off the working power supply and
lighting power (also water and gas) ,
and clean the operation site.
Keep materials in orderKeep tools in order
HUAWEI TECHNOLOGIES CO., LTD. Page 42All rights reserved
General Operation Safety Requirements ---Cleaning up(2)
If a lot of dust deposit during
construction because of the
environment in the client’s equipment
room, clean the air filters in the
equipment and cabinet surface after
the construction is completed.
HUAWEI TECHNOLOGIES CO., LTD. Page 43All rights reserved
Data Operation and Software Debugging---Version Requirement(1)
All software versions should be applied for through normal channels. Only
software that has been officially filed and issued by Huawei Technologies can
be used.
Download right software and operate service cut-over and loading within set time
HUAWEI TECHNOLOGIES CO., LTD. Page 44All rights reserved
Data Operation and Software Debugging---Version Requirement(2)
Scripts written by clients as required for equipment management can
only be implemented after assessment of R&D Department of Huawei
Technologies via Huawei regional offices .
Service commission from the client beyond the delivery range stipulated
in the contract should not be accepted privately. Free service
authorized by Huawei company should be treated as normal work.
Any product secrets are not allowed to be publicized without authorized
permission of Huawei company, nor commercial secrets and
technological secrets of different carriers.
HUAWEI TECHNOLOGIES CO., LTD. Page 45All rights reserved
Data Operation and Software Debugging---Following Client Regulations(1)
Any operation on the running equipment should be subject to the
approval of the client’s management department, and carried out under
the accompany and supervision of the client’s appointed person.
Do not carry out such operations as service cut-over, data setting, hot-
plugging important boards, loading and power-down resetting beyond
the specified time defaulted in the industry (generally from 00:00 to 6:00,
with special products subject to their specifications).
HUAWEI TECHNOLOGIES CO., LTD. Page 46All rights reserved
Data Operation and Software Debugging---Following Client Regulations(2) In addition to follow relevant rules of the company, important operations
should also meet the management requirement of the client. Ask
corresponding department of the company for instruction if there are
any conflicts between the client’s management requirements and
company’s relevant rules, and then operate based on sufficient
negotiation agreement between both parties.
During engineering debugging, if it is necessary to connect the
debugging device ( e.g. portable computer, etc. ) to the network where
the main equipment is connected, submit the on-site service application
to the client for IP address of the debugging device in advance, and the
debugging device ( typically a portable computer) can be connected to
this network only after the client permits.
HUAWEI TECHNOLOGIES CO., LTD. Page 47All rights reserved
Data Operation and Software Debugging--- Operation Requirements(1)
Work out detailed operating technical schemes and prepare safe
switching-back measures before cut-over, important data modification
or upgrade. (Technical schemes for important upgrading and cut-over
can only be implemented after review of the authority appointed with the
relevant company document.) Test and check must be implemented
before operation strictly according to the scheme and data setting
regulations, with the emphasis placed on charging and safe switching-
back. Carry out the corresponding dial-up and joint debugging after
operation. Check the charging information and bills of all office
directions. Observe for a period of time after cut-over.
HUAWEI TECHNOLOGIES CO., LTD. Page 48All rights reserved
Data Operation and Software Debugging--- Operation Requirements(2) Fill out “Test Record” and “Maintenance Log” carefully. Backup the
original data before operating the data and backup the original version
before version upgrade.
Carry out anti-virus operations periodically on the floppy disks used in
the system. There should be no programs and data which are irrelevant
with system running on the hard disk. Initiatively check the equipment
running status and data, and clear hidden troubles.
For handling faults in out-sourced products, engineers for out-source
products should submit service applications and handling schemes to
the end user and relevant departments of Huawei Technologies for any
operation to the equipment, and carry out the operation subject to
approval.
HUAWEI TECHNOLOGIES CO., LTD. Page 49All rights reserved
Data Operation and Software Debugging---Summary of Main Points(1)
Apply for IP address for the equipment to be debugged.
Carry out anti-virus operations periodically.
Never reveal secrets to outsiders.
Never accept service commissions privately.
Operation on out-sourced products are subject to the consent of the
client and Huawei Technologies.
HUAWEI TECHNOLOGIES CO., LTD. Page 50All rights reserved
Data Operation and Software Debugging---Summary of Main Points(2)
Script written by the client can only be implemented after assessment of
R&D Department.
Detailed operation and safe switching-back schemes
Follow the requirements of the client and Huawei company when
carrying out important operations.
Backup the necessary data and fill out relevant records carefully.
Observe for a period of time after cut-over and make dialing test
seriously.
HUAWEI TECHNOLOGIES CO., LTD. Page 51All rights reserved
Detailed Management Rules(1)
The manual is used together with “Project Implementation Service
Flow”. It is a measure to ensure the production safety of construction
projects, and is suitable for all engineering projects undertaken by
Huawei Technologies.
Consequences resulted from violation of the manual should be treated
according to detailed regulations of “Management Regulations for
violation of Service Rules” of the Global Technical Service Department.
HUAWEI TECHNOLOGIES CO., LTD. Page 52All rights reserved
Detailed Management Rules(2)
This manual is to remind every engineering member for civilization
operation and safety production. Operations not listed in this manual
should be carried out strictly following own operation instructions or with
reference to the similar management regulations in this manual. If there
are official management documents from relevant management
department, the requirements in the issued documents will prevail.
HUAWEI TECHNOLOGIES CO., LTD. Page 53All rights reserved
No Trifles in Production Safety!Be Cautious!