Retail Market Update

Topics• Data Variance / Data Archive

• FasTrak D2D / DEV Update

• Pre-TX SET 1.5 Clean up Progress Report

• SCR 727 Training Announcement

• Recent Data Loading Improvements

• V1.6 Coordination Team Update

• Texas Market Link (PRP Phase 1) Update

• Move-In /Move-Out Market Solution to Stacking (V2.0)

• Customer Protection Period & 814.08 Issue

• Flight 0703 Completion

• Flight 1003 Status Report

Page 3: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

3

SCR 727 Extract Update

Page 4: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

4

Proposed Timeline for Extract, Variances, True-Ups

Extracts

10/1/03Clear all “old” extracts from Portal

9/26/03Post last “old” daily extract

10/6/03“New” extracts available

10/7/03“New” daily extracts

10/1/03Stop “old” variance process

2/7/04Begin True-Up runs for 2003

10/10/03Complete existing variances w/ answers; Close remaining

12/7/03 Deadline to file variances for 1/1/03 True-Up

Variances

Settlements

10/1/03Resettlement of 2003 dates beginning with selected June dates

10/13/03 Begin filing new variances;Change prioritization on variance work

Page 5: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

5

Proposed Timeline LSE Variances

LSE Variances

Submit Variance at least 60 days prior to scheduled resettlement

ERCOT initial validation and analysis completed

ERCOT:• Takes corrective action and/or• Performs Turnaround with MPs • Responds to submitter

TDSP/CR Initial Response

10 Business Days

60 Calendar Days

14 Business Days

Issues to Consider:

• It is possible that the initial response from the TDSP/CR requires a turnaround to the initiator of the issue.

Settlement takes place

Page 6: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

6

Proposed Timeline NIDR Usage Variances

NIDR Usage Variances

Submit Variance at least 60 days prior to scheduled resettlement

TDSP validation and analysis completed; Response provided to submitting party

TDSP to send transactions if necessary

45 Calendar Days

60 Calendar Days

15 Calendar DaysSettlement takes place

Issues to Consider:

• Depending on the resolution of the variance, the TDSP may have to submit transactions.• ERCOT will work with TDSP to resolve any transaction issues to fix variances

Page 7: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

7

Proposed Timeline IDR Usage Variances

Submit Variance at least 60 days prior to scheduled resettlement

TDSP validation and analysis completed; Response provided to submitting party

IDR Usage Variances

TDSP to send transactions if necessary

45 Calendar Days

60 Calendar Days

15 Calendar DaysSettlement takes place

Issues to Consider:

• Depending on the resolution of the variance, the TDSP may have to submit transactions.• ERCOT will work with TDSP to resolve any transaction issues to fix variances

Page 8: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

8

Proposed Timeline Service History ESI ID Characteristics Variances

Submit Variance at least 60 days prior to scheduled resettlement

TDSP validation and analysis completed; Response provided to submitting party

ESI ID Characteristics

TDSP to send transactions if necessary

45 Calendar Days

60 Calendar Days

15 Calendar DaysSettlement takes place

Issues to Consider:

• Depending on the resolution of the variance, the TDSP may have to submit transactions.• ERCOT will work with TDSP to resolve any transaction issues to fix variances

Submit Variance at least 60 days prior to scheduled resettlement

ERCOT validation and analysis completed

TDSP to send transactions if necessary

10 Calendar Days 15 Calendar DaysSettlement takes place

ESI ID Existence

Page 9: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

9

ERCOT Proposed Changes

• Require 60 Calendar Days for complete resolution to all issues

• Prioritization– Work Issues according to submission date

– Issues should be submitted in chronological order for True-Up Settlements

• Allow usage variances only if the variance involves an ADU change of at least ?? kWh

Page 10: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

10

FasTrak Issue Status• Day-to-Day• Data Extract Variances (DEV)

Page 11: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

11

FasTrak 2003 “Day to Day”Issue Stats (as of 09-23-2003)

• Of the 321 In Progress with ERCOT, 166 are resolved and awaiting other party resolution check off

• Total ESI IDs worked to date since January 1, 2003 = 227,818

STATUSIssueCount

Issues as a% of Total

New 28 0.28%

In Progress (ERCOT) 321 3.19%

In Progress (w/TDSP) 150 1.49%

In Progress (w/CR) 56 0.56%

Resolved 8,909 88.49%

Rejected 604 6.00%

Total 10,068

IssueCount

Issues as a% of Total

New 737 24.13%

In Progress 1,034 33.86%

Resolved 1,233 40.37%

Rejected 50 1.64%

Total 3,054

Non-ERCOT

ERCOT

• Of the 1,771 New and In Progress with Non- ERCOT, 24 are for the year 2002

• Number of ESI IDs not tracked

Page 12: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

12

FasTrak Data Extract VarianceIssue Stats (as of 09-23-2003)

STATUSService History Usage

TotalIssues

Issues% of Total

New 21 0 21 1.34%

In Progress (ERCOT) 546 0 546 34.82%

In Progress (w/TDSP) 130 0 130 8.29%

In Progress (w/CR) 72 0 72 4.59%

Resolved 149 1 150 9.57%

Rejected 622 27 649 41.39%

Total 1,540 28 1,568

Service History Usage

TotalIssues

Issues% of Total

New 16 18 34 1.41%

In Progress 612 916 1,528 63.40%

Resolved 253 284 537 22.28%

Rejected 102 209 311 12.90%

Total 983 1,427 2,410

Non-ERCOT (CR to TDSP)

ERCOT

Page 13: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

13

Pre TX Set 1.5 Data Clean Up

• Directive from RMS 07-17-03 Meeting• Pre TX SET 1.5 Status Report• Ongoing Transaction Clean-up Process

Page 14: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

14

Pre-TX Set 1.5 Data Cleanup

Background:ERCOT identified “In Review”, “Scheduled” and “Canceled with Exception with Meter Reads” that were not completed from early 2002 to April 11, 2003.

RMS Vote, July 17th, 2003:Recommend RMS direct ERCOT to completely clean-up by August 13th, 2003 the Pre-Tx Set 1.5 In Review, Scheduled and Cancel With Exception that have been identified and sent to the market participants which should include cancels with CR approvals. ERCOT will provide at August RMS full statistics involving market participants broken down per issue type. ERCOT is directed that if the TDSP provides file names, ERCOT will locate and re-process if it is a valid transaction. RMS directs the TDSPs and CRs to provide transactions or information necessary to achieve the completion of the data clean-up.

Page 15: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

15

Pre-TX Set 1.5 Data Cleanup

Mar-03 Jun-03 Jul-03 Aug-03 Sep-03

In Review AEP - - 0 0 0

CNP - - 0 0 0

Oncor - - 6 0 0

TNMP - - 6 0 0

Total 16,188 207 12 0 0

Scheduled AEP - - 2,953 1,883 57

no completing CNP - - 1,215 530 93

meter read Oncor - - 991 2,039 1,413

TNMP - - 994 2,186 418

Shrylnd - - - 8 -

Total 23,030 11,038 6,153 6,638 1,981

CWE AEP - - 31 31 0

w/ Meter Data CNP - - 694 697 620

Oncor - - 624 624 4,365

Identified as TNMP - - NR NR 260"Need to Complete" Total Na 1,618 1,349 1,352 5,245

Page 16: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

16

Ongoing Transaction Data Clean-up

Clean-up Process Steps:

a) ERCOT runs the query monthly and defines the Action Items needed (The first run will have a few months data).

– In-Review with Meter Read: Notify TDSP and request 814_04 then completing transaction.

– Scheduled with Meter read but not associated to BPI: Notify TDSP and request completing transaction.

– Scheduled No Meter Read: Notify TDSP and request 867 completing transaction.

– CWE with Meter Read: Notify TDSP and find out if they thought the transaction had completed. If so – take corrective action.

b) ERCOT distributes the lists to MP who owe the follow-up action.

c) MP Responds and ERCOT coordinates the clean-up activities.

d) ERCOT to report Monthly to RMS.

Page 17: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

17

SCR 727 Training Announcement

September 29-30, 2003

Page 18: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

18

SCR 727 Training 9/29-9/30

WHAT is the SCR 727 Training?Overview of the 727 Process:• Understanding ERCOT data flow• Loading the SCR 727 DDL• Understanding the data within the extract• Logging Data Extract Variance (DEV) issues using

the FasTrak tool• ERCOT’s policies and procedures for working DEV

issues

Page 19: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

19

SCR 727 Training 9/29-9/30

WHO is the Intended Audience?The SCR 727 Training was developed for:• CRs, TDSPs, and NOIEs utilizing or

planning to utilize the SCR 727 Extract• Both technical and business individuals

who are or will be working with the 727 data for your entity

• 100 RSVPs from 23 CRs, 6 TDSPs, 2 Service Providers and ERCOT

Page 20: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

20

SCR 727 Training 9/29-9/30

WHEN is the SCR 727 Training?

A two-day SCR 727 Training will be held:

Monday, September 29, 2003 10am – 5pm

Tuesday, September 30, 2003 8:30am- 5pm

Williamson County Convention Center

Wingate Hotel - Round Rock

(Note: Location Change)

Page 21: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

21

Data Loading ImprovementsPR-30125 Update

Page 22: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

22

PR-30125 Data Loading Improvements

• August 6, 2003 Implementation:– Positive response to MRE for both IDR & NIDR usage

– Error response for IDR data submitted that is not for whole days (must start at 00:00:00 and end at 23:59:59)

– Error response for IDR data submitted for any ERCOT-read meter– Error response for extreme usage (Average Daily Usage > 49,998 kWh)

– Error response for NIDR data that covers more than 6 months

Page 23: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

23

PR-30125 Data Loading Improvements

• September 3, 2003 Implementation:– Allow usage to span multiple service history rows

except in three cases:

• MRE change

• Profile change

• Rep change

– Error response provided when IDR data is submitted but not channel/recorder set up for the ESI ID.

Page 24: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

24

PR-30125 Data Loading Improvements

• September 17, 2003 Implementation:– Response files provided to CRs for usage loading into

Lodestar (provided to CR indicated in the forwarding DUNS field of the 867_03)

– Allow duplicate Transaction IDs for IDR data sent via 867_03s

Page 25: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

25

PR-30125 Data Loading Improvements

• Upcoming implementations (November):– 814_20 processing improvements to allow 814_20

changes to load regardless of whether it coincides with usage except for certain changes:

• MRE changes

• Profile code changes

• REP changes

– 814_20 retire will reject unless the account is de-energized in both Siebel & Lodestar

Page 26: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

26

Update to RMSPresented by Dave Odle

Texas Set V.1.6 Implementation Update

Page 27: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

27

Background InformationTX SET Version1.6

• Implementation of functionality to support automated portions of Competitive Meter Ownership

• Define and set expectations on identified manual processes for Competitive Meter Ownership

• Clarifications on payment and remittance processes as defined by the 810/820 workshop

Page 28: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

28

• CC 427 – Meter level segments NOT USED for unmetered services

• CC 458 – REF~1P NOT USED by the CR on the 814_13

• CC 462 - One to One suspension and cancellation of delivery services

• CC 469 - Reject Code “FRB” to be used by all MPs (Not just MCTDSPs)

• CC 511 - Removal of special characters from PER.04 & PER.06

• CC 512 – Meter Ownership credit on the invoice

• CC 513 – New segment to maintain ESI ID showing meter ownership

• CC 533 – Dependency DTM~MRR, “DC003” code, & BGN.08 on the 650_02

• CC 552 – Clarification of CC 513 on when it is used

• Manual – Competitive meter manual processes

• CC 427 – Meter level segments NOT USED for unmetered services

• CC 458 – REF~1P NOT USED by the CR on the 814_13

• CC 462 - One to One suspension and cancellation of delivery services

• CC 469 - Reject Code “FRB” to be used by all MPs (Not just MCTDSPs)

• CC 511 - Removal of special characters from PER.04 & PER.06

• CC 512 – Meter Ownership credit on the invoice

• CC 513 – New segment to maintain ESI ID showing meter ownership

• CC 533 – Dependency DTM~MRR, “DC003” code, & BGN.08 on the 650_02

• CC 552 – Clarification of CC 513 on when it is used

• Manual – Competitive meter manual processes

Texas Set V1.6 Functional Requirements

Background on Requirements

Page 29: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

29

Background - Categories for Version 1.6

CC 427CC 458CC 462CC 469CC 511CC 512CC 513CC 533CC 552

Group 1

Functional Changes

Group 2

Implementation Guide Changes

Have been delivered by COMET

Group 3

Manual Processes identified by the

COMET working group

Rules clarified in the 810/820Workshop. This is not new functionality, But may be included in Flight1003

Group 4

810/820 rules

CC 386CC 442CC 445CC 451CC 452CC 455CC 459CC 461CC 467CC 469CC 470CC 472CC 473CC 474

CC 496CC 500CC 501CC 506CC 510CC 511CC 514CC 515CC 476CC 481CC 482CC 486CC 487CC 488

Page 30: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

30

Implementation Plan

• Flight Testing to begin 10/13/03• V1.6 Must be implemented by all MPs by 12/20/03

Page 31: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

31

Project Timeline for Texas Set 1.6

6/10 7/14 8/15 9/12 10/10

PlanningDetail

DesignConstruction

System Test

MarketTest

12/20/03

**Contingency Migration date is 1/3/04

Page 32: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

32

Current Market Status

ESG ACN Energy, Ampro Energy, Andeler, ANP Power Direct, BP Energy, Cirro Group, Coral Power, Solutions, Coral Power LLC, Dynegy, Exelon Power Team, Exxon Mobile Power & Gas, mPower, Strategic, Sempra Energy Solutions, Tara Energy, Tractebel Energy Marketing, UBS Warburg, NUECES (MC TDSP), SAN Patricio (MC TDSP)

ADS Republic, Calpine, Entergy Solutions, GEXA, Entergy Gulf States

Systrends APS Energy Services, Occidental Power Marketing, Tenaska Power Services, Texas Commercial Energy

TDSPS: PEC IOU TDSP, PEC Muni Coop, Sharyland Utilities

EC Power AEP Energy Services, Just Energy, Utility Choice Electric, Creed Power Services, VarTec Energy, Energy America Multi-family, Mutual Energy, Hino, Proviron Energy Limited, Alliance Energy, Direct Energy

Logica AEP TDSP

0

10

20

30

40

50

60

70

80

90

100

Design

Build

Test

Page 33: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

33

ERCOT Portal Replacement Project

Update to RMSPresented by Dave Odle

Page 34: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

34

• Phase 1 will address stability and reliability issues associated with the performance of the current ERCOT portal along with some "look and feel" changes to the portal. 

• Phase 1 will also include a new "My Page" functionality that allows market participants to create a customized page on the Texas Market Link consisting of links to their most frequently used functions.   While delivering a new look to the ERCOT portal along with improved navigation and performance, existing portal users are expected to make a seamless migration to the Texas Market Link. 

• This phase of the Texas Market Link project is scheduled to be released to production on Sunday, October 5th, 2003.  

OverviewPhase 1 Scope

Page 35: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

35

OverviewExample of Current Portal Page

Content / Portlets

Header

Na

vig

ati

on

Page 36: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

36

OverviewExample of New Portal Page

Na

vig

ati

on

Header

Content / Portlets

Page 37: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

37

• A two week testing period with Market Participant volunteers for phase 1 has just concluded.  The purpose of this testing was to test the changes as well as ensure that current functionality is operational.  

• ERCOT Client Services (Wholesale and Retail combined) will be hosting two orientation sessions via web-cast conference calls.

– Tuesday, September 30th.

– Wednesday October 1st.

• Contact your Retail Account Manager if you need the call in information.

OverviewPhase 1 Scope

Page 38: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

38

Phase 2 Update

Phase 2 is on schedule with requirements gathering and initial design– The on-site requirements gathering sessions have concluded

– ERCOT is in the process of consolidating requirements, building cost estimates, and solidifying timelines.

– Next Steps:

• Market Meeting to be held on 10/2 for requirements solidification

• ERCOT business to have final requirements to I.T. by 11/1.

Page 39: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

39

Flight 0703 Completion

Page 40: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

40

Flight 0703 Completion

Congrats – the Market completed

AHEAD OF SCHEDULE.

Original deadline was 9/5, complete by 8/22.

Page 41: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

41

Flight 1003 Status Report

Page 42: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

42

Flight 1003 Status Report

Number of testing participants:• 61 Market Participant systems (total of 75 different DUNS

that the market conducts business under)

• 4 NEW Competitive Retailers

Progress:• Connectivity – started on time 9/17 – due to complete by

October 1• Frame 1 – due to start 10/13• A total of 3 frames for testing• Flight scheduled to conclude – 12/05

Page 43: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

43

Flight 1003 Status Report

To support Competitive Metering testing:

1) ERCOT is working to get answers from last of TDSP where meter credit will be (account loop or rate loop). ERCOT will add the information in the expected results of the scripts

2) COMET guide / forms / contacts – work with COMET team to get information posted to the web for flight

3) ERCOT will host a conference call with the testers to walk through what is expected for the two Competitive Metering Scripts prior to Frame 1 transactions.

Page 44: 1 Update from ERCOT Retail Market Services to RMS September 26, 2003

44

Questions ?