    Location:

    Engineer:Study Case: SC

    4.0.0C

    Page: 1

    SN: KLGCONSULT

    Filename: 009005-009009

    Project: ETAP PowerStation

    Contract:

    Date: 05-14-2013

    Revision: Base

    Config.: Normal

    Short Circuit Analysis

    Electrical Transient Analyzer Program

    1.5-4 Cycle Network

    3-Phase, LG, LL, & LLG Fault Currents

    ETAP PowerStation

    ANSI Standard

    Total

    Number of Buses:

    Swing Generator Load Total

    Number of Branches:XFMR2 Reactor Line/Cable Impedance Tie PDXFMR3 Total

    Number of Machines:

    Generator Motor MachinesGrid

    Synchronous Synchronous Induction

    Load

    Lumped

    1 1 1

    2 0 00 0 0

    1 0 3 01

    3

    2

    5

    Power

    System Frequency: 60 Hz

    Unit System: English

    Project Filename: 009005-009009

    Output Filename: C:\Users\user\Desktop\PSLI\short.SA2

  • 7/28/2019 10-200

    2/10

    Location:

    Engineer:Study Case: SC

    4.0.0C

    Page: 2

    SN: KLGCONSULT

    Filename: 009005-009009

    Project: ETAP PowerStation

    Contract:

    Date: 05-14-2013

    Revision: Base

    Config.: Normal

    BUS Input Data

    ID Type Nom. kV %Mag. Ang. MW Mvar MW Mvar

    Bus Initial Voltage Generation Motor Load

    Base kV

    13.80013.800Gen. 3.925 1.901100.0Bus4 -30.0

    120.000120.000SWNG 100.0Bus5 0.0

    0.6000.600Load 1.849 0.763100.0Bus6 -60.0

    3 Buses Total 0.000 5.773 2.664

    All voltages reported by PowerStation are in % of bus Nominal kV. Base kV values of buses are calculated and used internally by PowerStation.

  • 7/28/2019 10-200

    3/10

    Location:

    Engineer:Study Case: SC

    4.0.0C

    Page: 3

    SN: KLGCONSULT

    Filename: 009005-009009

    Project: ETAP PowerStation

    Contract:

    Date: 05-14-2013

    Revision: Base

    Config.: Normal

    2-WINDING TRANSFORMER Input Data

    ID MVA Prim. kV Sec. kV % Z X/R Prim. Sec.

    Transformer % Tap Setting

    % Tol.

    Rating Z Variation

    + 5% - 5%

    Phase Shift

    Type Angle% Z

    Adjusted

    T4 30.000 120.000 13.800 8.500 25.0 0 00 0 Std Pos. Seq. -30.00 8.5000

    T5 20.000 13.800 0.600 6.000 8.0 0 00 0 Std Pos. Seq. -30.00 6.0000

    2-WINDING TRANSFORMER Grounding Input Data

    ID MVA Prim. kV Sec. kV

    Transformer

    Type Type Amp Type Amp

    Rating Prinary Secondary

    Grounding

    Conn.

    10.0ResistorD/Y13.800120.00030.000T4

    200.0ResistorD/Y0.60013.80020.000T5

  • 7/28/2019 10-200

    4/10

    Location:

    Engineer:Study Case: SC

    4.0.0C

    Page: 4

    SN: KLGCONSULT

    Filename: 009005-009009

    Project: ETAP PowerStation

    Contract:

    Date: 05-14-2013

    Revision: Base

    Config.: Normal

    BRANCH CONNECTIONS

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVAbConnected Bus ID

    Y

    T4 Bus5 1.13 28.31 28.33Bus42W XFMR

    T5 Bus4 3.72 29.77 30.00Bus62W XFMR

  • 7/28/2019 10-200

    5/10

    Location:

    Engineer:Study Case: SC

    4.0.0C

    Page: 5

    SN: KLGCONSULT

    Filename: 009005-009009

    Project: ETAP PowerStation

    Contract:

    Date: 05-14-2013

    Revision: Base

    Config.: Normal

    POWER GRID Input Data

    IDID kV X/R % R % X

    Power Grid Rating Positive Seq. ImpConnected Bus

    X/RType % R0 % X0

    Grounding Zero Seq. Imp.

    MVASC

    U5 120.000 Wye - SolidBus5 2000.000 0.33260 4.98893 0.332600 4.9889315.00 15.00

    Total Power Grids (= 1 ) 2000.000 MVA

    SYNCHRONOUS GENERATOR Input Data

    ID Type MVA kV RPM X"/R % R % X'% X"

    Synchronous Generator Rating Positive Seq. Imp.

    X/RConn. Type Amp % R0 % X0

    Grounding Zero Seq. Imp.

    0.200180013.80010.000Gen2 Turbo 10.00 15.00 50.00 0.200 10.00Wye Solid50.00

    Total Connected Synchronous Generators ( = 1 ): 10.000 MVA

  • 7/28/2019 10-200

    6/10

    Location:

    Engineer:Study Case: SC

    4.0.0C

    Page: 6

    SN: KLGCONSULT

    Filename: 009005-009009

    Project: ETAP PowerStation

    Contract:

    Date: 05-14-2013

    Revision: Base

    Config.: Normal

    INDUCTION MACHINES Input Data

    ID kVA kV RPM X"/R % R % X'% X"

    Rating (Base) Positive Seq. Imp.Induction Machine

    Type Qty Conn. Type Amp X/R % R0 % X0

    Grounding Zero Seq. Imp.

    1Mtr2 13.200 1800 3.845 153.80 230.80 15.38WyeMotor Open4360.8 3.8454.0040.00

    1Mtr3 0.575 1800 192.313 1538.50 2307.70 16.67WyeMotor Open1000.1 192.3130.098.00

    1Mtr4 0.575 1800 192.313 1538.50 2307.70 16.67WyeMotor Open1000.1 192.3130.098.00

    Total Connected Induction Machines ( = 3 ): 6361.0 kVA

  • 7/28/2019 10-200

    7/10

    Location:

    Engineer:Study Case: SC

    4.0.0C

    Page: 7

    SN: KLGCONSULT

    Filename: 009005-009009

    Project: ETAP PowerStation

    Contract:

    Date: 05-14-2013

    Revision: Base

    Config.: Normal

    SHORT- CIRCUIT REPORT

    Fault at bus: Bus4

    Nominal kV = 13.800 Prefault Voltage = 100.00 % of nominal bus kV

    Base kV = 13.800 = 100.00 % of base kV

    ID Symm. rmsFrom BusID Va

    From Bus To Bus % V kA % Voltage at From Bus

    Contribution 3-Phase Fault Looking into "From Bus"

    Vb Vc Ia 3I0 R1 X1 R0 X0

    kA Symm. rms % Impedance on 100 MVA base

    Line-To-Ground Fault

    Positive & Zero Sequence Impedances

    Bus4 Total 0.00 16.824 0.00 133.35 131.93 8.472 2.08E+000 1.00E+0028.472 9.42E-001 2.48E+001

    *Bus5 Bus4 85.00 12.552 96.43 99.84 96.23 4.079 1.26E+005 2.83E+0010.007 1.47E+000 3.33E+001

    Bus6 Bus4 0.03 0.004 76.13 77.05 98.91 0.008 0.000 8.83E+003 1.06E+005

    Gen2 Bus4 100.00 4.183 100.00 100.00 100.00 4.183 2.00E+000 1.00E+0028.472 2.00E+000 1.00E+002

    Mtr2 Bus4 104.55 0.086 104.55 104.55 104.55 0.212 0.000 8.07E+001 4.84E+003

    # Indicates fault current contribution is from three-winding transformers

    * Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer

  • 7/28/2019 10-200

    8/10

    Location:

    Engineer:Study Case: SC

    4.0.0C

    Page: 8

    SN: KLGCONSULT

    Filename: 009005-009009

    Project: ETAP PowerStation

    Contract:

    Date: 05-14-2013

    Revision: Base

    Config.: Normal

    Fault at bus: Bus6

    Nominal kV = 0.600 Prefault Voltage = 100.00 % of nominal bus kV

    Base kV = 0.600 = 100.00 % of base kV

    ID Symm. rmsFrom BusID Va

    From Bus To Bus % V kA % Voltage at From Bus

    Contribution 3-Phase Fault Looking into "From Bus"

    Vb Vc Ia 3I0 R1 X1 R0 X0

    kA Symm. rms % Impedance on 100 MVA base

    Line-To-Ground Fault

    Positive & Zero Sequence Impedances

    Bus6 Total0.00 175.611 0.00 173.14 173.25 0.200

    1.44E+005 2.98E+0010.200

    4.66E+000 5.46E+001

    *Bus4 Bus6 54.72 175.521 99.98 100.00 100.01 0.200 1.44E+005 2.98E+0010.200 4.66E+000 5.46E+001

    Mtr3 Bus6 104.35 0.045 104.35 104.35 104.35 0.000 0.000 1.77E+004 2.12E+005

    Mtr4 Bus6 104.35 0.045 104.35 104.35 104.35 0.000 0.000 1.77E+004 2.12E+005

    # Indicates fault current contribution is from three-winding transformers

    * Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer

  • 7/28/2019 10-200

    9/10

    Location:

    Engineer:Study Case: SC

    4.0.0C

    Page: 9

    SN: KLGCONSULT

    Filename: 009005-009009

    Project: ETAP PowerStation

    Contract:

    Date: 05-14-2013

    Revision: Base

    Config.: Normal

    Short-Circuit Summary Report

    Prefault Voltage = 100 % of the Bus Nominal Voltage

    ID kV

    Bus

    Real Imag. Mag. Real Real RealImag. Imag. Imag.Mag. Mag. Mag.

    3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground

    1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

    0.637 -16.812 16.824 0.246 -8.468 8.472 15.036 0.694 15.052 14.944 3.388 15.323Bus4 13.80

    14.936 -174.975 175.611 0.200 0.000 0.200 153.689 14.160 154.340 -153.739 -14.159 154.390Bus6 0.60

    All fault currents are symmetrical momentary (1.5-4 Cycle network) values in rms kA

    * LLG fault current is the larger of the two faulted line currents

  • 7/28/2019 10-200

    10/10

    Location:

    Engineer:Study Case: SC

    4.0.0C

    Page: 10

    SN: KLGCONSULT

    Filename: 009005-009009

    Project: ETAP PowerStation

    Contract:

    Date: 05-14-2013

    Revision: Base

    Config.: Normal

    Short-Circuit Summary Report

    ID kV

    Bus

    Resistance Reactance Impedance

    Positive Sequence Imp. (ohm)

    Resistance Reactance Impedance

    Zero Sequence Imp. (ohm)

    Resistance Reactance Impedance

    Negative Sequence Imp. (ohm)

    0.01793Bus4 13.800 0.47324 0.47358 0.03960 1.90434 1.904750.443300.442630.02435

    0.00017Bus6 0.600 0.00197 0.00197 5.19629 0.00107 5.196290.001920.001910.00019