35
10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST © Suncast Corporation www.HomePlaceStructures.com Package ships as shown

10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

Embed Size (px)

Citation preview

Page 1: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

10' and 12' Octagon Cedar Gazebo Assembly Instructions

Toll Free: 866.768.8465Hours: 9-5 Monday-Friday EST

© Suncast Corporation

www.HomePlaceStructures.com

Package ships as shown

Page 2: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

Cedar GazeboAssembly Instructions

© Suncast Corporation

revised 06/20/09

Please read through the entire manual before starting!

Note: It is very important that you have a firm, level site for the structure.

When using tools and ladders, always follow manufacturer’s recommended safety guidelines!

Tools Needed:

Sharp Utility Knife5/8” Socket

Socket Wrench5/8” Wrench

Hammer StaplerCordless Drill

LadderTape Measure

HammerFlathead Screwdriver

Level

Additional Items Needed:Approximately 4-5 bundles of shingles

When your kit arrives, it should look like this. Inspect the package for any damage that may have oc-curred during shipping - dented corners, punctured plastic, etc. If the package is damaged, alert

HomePlace Structures immediately at 866.768.8465.

Page 3: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending
Page 4: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending
plisaw
Text Box
plisaw
Typewritten Text
12' floor frame plan
Page 5: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 01© Suncast Corporation

Step 1: Gazebo kit should arrive as shown, depending on which unit was purchased. Place kit as closeto site as possible.

Step 3: Remove the lid of box including the pressure treatedsub-floor pieces.

Step 2: Very carefully cut thepackaging bands holding theboxes together.

Step 4: Remove the contents of the box and organize like partstogether; set parts close to assembly location.

Step 5: Use a tape measure tofind and mark the location of thecenter of gazebo floor.

Gazebo with floorGazebo without floor

If your unit does not include a floor, please proceed to page 11.

Floor Framing AssemblyIt is very important to build the floor on a firm, level surface.

Gazebo floor only

This assembly manual is to be used to assemble a HomePlace Structures 10’ or 12’ octagoncedar or vinyl gazebo. The 10’ vinyl model was used to create this floor. Depending on unit that

was purchased, some of the pictures shown will differ from your unit.

Page 6: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 02© Suncast Corporation

Step 7: Use the mark from step 5 and lay out double floor joists mak-ing sure to keep notched end up and towards center as shown.

Step 6: Locate the double floorjoists with notch cut at one end.

Step 8: Lay out the eight perimeter band boards as shown.

Step 9: Align the edge of the band board with center of the double joist and attach each end using two 3”screws in the pre-drilled holes. Note: It is important that the top edges of the band board and joist

are aligned flush.

Page 7: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 03© Suncast Corporation

Step 10: Align corner of adjacent band board and attach using 3” screws in pre-drilled holes.

Step 11: Repeat steps 9 & 10 until all band boards are installed.

Step 12: Insert center connecting plates as shown.

Note: If opening is tight, step on connecting plates to push them down.

Page 8: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 04© Suncast Corporation

Step 13: Center double joist along edge of connecting plate and attach using 3” screws.

Note: There may be some space between joist and connecting plate, but it should notexceed 1/4”.

Step 14: Repeat step 13 for each of the remaining double joists trying to keep an equal space betweenthe joist and connecting plate for each board.

Floor is now ready for installation of middle joists.

16: Place one middle joist in each floor section.

Note: Make sure to properly align cut angles of joist.

Step 15: Locate the 16 middlefloor joists.

Incorrect angle alignment

Page 9: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 05© Suncast Corporation

Step 17: Arrange middle floor joists to match pattern shown in picture.

Step 19: Attach band board to middle joist using 3” screws inpre-drilled holes.

Step 18: Align joist with pre-drilledholes in band board.

Step 20: Attach middle joists to double joist using two 3” screwsas shown.

Step 21: Repeat steps 18-20 forthe remaining middle joists.

Page 10: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 06© Suncast Corporation

Step 22: Open the box containing the floor boards. Step 23: Organize floor boardsnear floor framing as shown.

Step 24: Place each of the outside floor boards around the perimeter of the floor.

Step 26: Attach floor board tofloor framing using one 2-1/2”screw as shown.

Note: It is recommended to putremaining screws in pre-drilledholes after each of the perime-ter boards are in place.

Step 25: Align floor board at cen-ter of double joist.

Floor Board Installation

Page 11: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 07© Suncast Corporation

Step 30: Repeat steps 25-28 and install adjacent floor board; attach using one 2-1/2” screw ateach end.

Step 31: Install remaining perimeter floor boards repeating steps 25-29.

Step 27: Align opposite end ofboard with center of double joist.

Step 28: Make sure the overhangis consistent along the entire

edge of board.

Step 29: Attach floor board usingone 2-1/2” screw as shown.

Page 12: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 08© Suncast Corporation

Step 32: Lay out the next complete row of floor boards before attaching any.

Step 34: Attach boards to floor joists using 2-1/2” screws.Step 33: Align boards with edgesof floor joists.

Note: There should be a 1/8”-1/4”space between the rows.

Step 36: Attach floor boards to middle joist.Step 35: Pre-drill one 3/16” holeabove middle floor joist.

Step 37: Repeat steps 33-36 for remainder of floor boards in that row.

Page 13: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 09© Suncast Corporation

Step 38: Repeat steps 32-37 for each remaining row of floor boards.

Step 39: Install center floor pieces as shown.

Step 40: Attach middle floorboards to sub-floor using 2-1/2”screws through pre-drilled holes.

Note: The center board may re-quire additional force in order to

make it fit.

Floor board installation iscomplete.

Page 14: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 10© Suncast Corporation

Step 41: Slide the first band board trim piece in place and align atcenter of floor corners.

Band Board Trim Installation

Step 43: Attach trim board to sub-floor using 1-1/2” screws in pre-drilled holes.

Step 44: Align adjacent trim piece and attach repeating steps 41 & 42.

Step 42: Make sure trim piece isup tight against bottom of floor

board.

Step 45: Repeat steps 41-44 around perimeter of gazebo.

Page 15: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 11© Suncast Corporation

Step 2: Carefully cutpackaging bands.

Step 1: Place package as close toassembly site as possible.

Step 3: Carefully cut open shrinkwrap, making sure not to allowproduct to fall off of the skid.

Step 4: Remove the posts and trim strips from package and organize.

Post & Bottom Railing Assembly

Note: When installing posts, angle at top of posts should slope down toward outside of gazebo.

Noteangle ofposts

Page 16: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 12© Suncast Corporation

Step 5: Remove bottom railing box from the skid, place in close proximity to assembly site, andremove lid.

Step 7: Locate and open the box containing the railing spindles. Each railing section contains atop T-rail and bottom straight rail.

Step 6: Remove top brace sections from package and organize.

Step 9: Insert a railing spindle into each cutout in the bottom straightrail making sure each spindle is tight against bottom of cutout.

Step 8: Locate one T-rail pieceand one bottom straight rail and

align angles.

Page 17: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 12© Suncast Corporation

Step 11: Insert railing spindles into each cutout in T-rail making sureeach spindle is tight against bottom of cutout.

Step 10: Make sure angles alignon ends of railings.

Step 13: Lay railing section on theground and push together.

Step 12: Attach T-rail to spindles using three 1-1/2” screws in the pre-drilled holes along edge of T-rail.

Step 14: Attach the straight bottom rail to the spindles repeatingstep 13.

Step 15: Repeat steps 8-14 forthe six remaining railing sections.

Page 18: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

Step 18: Insert one spacer blockunder the bottom railing section.

Step 16: Lay out one complete post trim and railing section including two post trim strips, one bottom rail-ing section, and one top railing section as shown.

Step 17: Locate the two spacerblocks included in the package.

Step 19:Use the remaining spacerblock to space the bottom of rail-ing from the bottom of the post

trim.

Step 22: Attach post trim to T-rail using 2-1/2” screws in pre-drilled holes for each side.

Step 21: Repeat steps 18-20 on opposite side of railing.Step 20: Attach post trim to bot-tom straight rail using two 2-1/2”screws in the pre-drilled holes.

Page 19: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 14© Suncast Corporation

Step 25: Repeat steps 24-25 foropposite side.

Step 27: Assemble one door section without bottom railing as shown.

Step 28: Stand up one post atdoor way opening keeping the

angled cut sloping downward to-ward outside of the gazebo.

Step 23: Use the spacer blocks toalign the brace section.

Step 24: Attach the post trim to the top brace section using four 2-1/2” screws in the pre-drilled holes as shown.

Make sure short point at top ofpost trim is against the ground.

Section is complete Step 26: Repeat steps 16-25 forsix remaining sections.

Step 29: Position doorway sec-tion at appropriate location for

your site.

Page 20: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 15© Suncast Corporation

Step 30: Rest the post trim on top of the post and pull down tight as shown.

Step 32: Attach the post trim to the post using five 2-1/2” screws in the pre-drilled holes.

Step 33: Repeat steps 30-32 for adjacent doorway post.

Step 31: Center the post trim on the post as shown.

Incorrect Correct

Page 21: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 16© Suncast Corporation

Step 34: Install the remaining posts and railing sections repeating previous steps.

Page 22: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 17© Suncast Corporation

Step 35: Center posts on floor splice and space an equal distance from edge of floor.

Note: If you did not purchase the optional floor kit, space posts equally and attach to the founda-tion using appropriate fasteners. All posts should be positioned an equal distance from one cor-

ner of the gazebo to the opposite corner.

Step 37: Remove rafter box from skid and unpack components.

Rafter Installation

Step 36: Center foundation bracket and fasten to each post using 2-1/2” screws, then attach post bracketto floor or foundation using appropriate fasteners.

Note: Use 2-1/2” screws, if foundation is wood or composite material. If foundation is concrete orother hard surface, use hard surface fasteners purchased separately..

Page 23: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 18© Suncast Corporation

Step 40: Slide the rafter into the slot at the top of the post as shown.

Step 41: Align the hole in therafter with hole on the post andpush a bolt through.

Step 42: Put a washer and nut on the opposite end of the bolt andtighten by hand.

Step 43: Install rafter on opposite side repeating steps 28-30.

Step 39: Prepare roof bolts by putting a nut and washer on one endof each bolt as shown.

Step 38: Place a step ladder inthe center of the gazebo.

Page 24: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 19© Suncast Corporation

Step 44: Push compression block into place, pull bottom of rafters tight against lip, and attach using 2-1/2” screws through pre-drilled holes as shown.

Step 45: Repeat steps 40-44 for next set of rafters as shown.

Step 46. Install 4 remaining rafters repeating previous steps as shown.

Page 25: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 20© Suncast Corporation

Step 48: Align band board with top of rafter and at the center of therafter splice and attach to rafters.

Step 47: Insert four 2-1/2” screwsin the pre-drilled holes in each

band board.

Step 49: Align opposite end of band board and attach. Step 50: Align adjacent board.

Step 52: Pull band board into place, align with first rafter, and attach.Step 51: First attach adjacentband board at opposite corner.

Roof Band Board Installation

Step 53: Continue installing band boards around entire perimeter of gazebo.

Page 26: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 21© Suncast Corporation

Step 55: Locate box containing roof boards, open box, remove parts,and organize as shown.

Step 56: Center roof board at rafter splice, align flush with edge of band board, and attach using 2” nails.

Roof Board Installation

Step 57: Slide groove of next roof board into the tongue on the previously installed board and attach withtwo nails at each end as shown.

Step 58: Repeat step 57 until entire section is complete.

Step 54: Tighten acorn nuts withtools before installing roof boards.

Page 27: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

Step 60: Align top of face board flush with top of band board and at center of edge of corner splice.Attach face board using 2” trim nails.

Step 62: Align corners of face boards and attach to band board.Step 61: First align and attach ad-jacent face board at opposite

corner.

Face Board Installation

Step 63: Continue installing face board around perimeter of gazebo.

Step 59: Repeat steps 44-46 for each roof section.

Page 28: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

page 23© Suncast Corporation

Step 64: Attach felt paper to roof boards using a hammer stapler as shown.

Step 65: Center the bottom point of roof bracket and fasten to roof using 10d nails as shown.

Note: Make sure nails go into rafters and 2x4 face board and do not protrude through bottom ofceiling/roof boards.

Felt Paper Installation

Step 66: Install flower boxes where desired using 2”screws.

Roof Bracket Installation

Flower Box Installation

Page 29: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

Installation Instructionsscreen package for wood & vinyl octagon gazebos

Toll Free: 866.768.8465Hours: 9-5 Monday-Friday EST

www.HomePlaceStructures.comrevised 8/12/09

Page 30: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

TOOLS NEEDED:1. Hammer 2. Utility Knife 3. Measuring Tape 4. Screw Gun

1. 2. 3. 4.

Note: This manual was created to providescreen installation instructions for HomePlace

Structures wood and vinyl octagon gazebos. De-pending on the unit that was purchased, someof the pictures shown will differ from your unit.

Page 31: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

Step 1: Remove screen panelsfrom box and set to the side. Layout one panel section as shown.

Step 2: Mark bottom of screenpanel in 1-13/16” from each end.

Tip: Insert factory edge intoscreen panel for easiest

installation.

Step 4: Mark top of screen panel3/4” from each end.

Step 5: Tap in wide filler stripalong top of panel, and align with

marks.

Step 6: Install screen panel bysliding top in as shown.

Step 7: Slide bottom of screen panel inplace and push snug against post as

shown.

Step 8: Repeat previ-ous steps to install re-

maining six screenpanels.

© Suncast Corporation Page 01

Step 3: Tap in narrow filler stripalong bottom of panel, and align

with marks.

3/4”

1-13/16”

Note: Steps 2 & 3 are not applicable to wood units.

Screen Panel Installation

Page 32: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

Note: There are 2 L strips for bothsides of door, and 6 T strips for

remaining posts.

Step 9: Install trim strips onto center of post and fasten with 2-1/2”screws through pre-drilled holes.

Do not countersink screws too deep, install just beyond surface.

Step 10: Install filler strip above door and fasten with 2-1/2” screws as shown.

Step 11: Install plastic door jamb strip and fasten with 2-1/2” screws as shown (flush with outside of post).

© Suncast Corporation Page 02

L-Strip T-Strip

If you are installing screens for a wood gazebo, please see the instructions on page 5 forsteps 10 & 11.

Screen Door Installation

Page 33: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

Step 12: Install aluminum Z-strips on sides of door using 5 pan head screws per side as shown.

Note: It is important to install side Z-strips first.

Step 13: Install top Z-strip using pan head screws.

Note: Z-strip corners should alignas shown in picture.

© Suncast Corporation Page 03

Page 34: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

Step 14: Insert piano hinge into Z-strip and fasten with pan head screws into pre-drilled holes.

Step 15: Slide door into pianohinge starting at top and working

to bottom.

Step 16: Align top of door with topof piano hinge.

Step 17: Adjust door for correctreveal at top and fasten with 4 or

5 self-tapping screws.

Step 18: Install bottom sweep onto bottom of door and adjust to de-sired height. Note: No screws are needed for this piece.

© Suncast Corporation Page 04

Note: Make sure notched sectionof piano hinge is at bottom of

door.

1/8”Gap

Page 35: 10' and 12' Octagon Cedar Gazebo Assembly Instructions · PDF file12' floor frame plan © Suncast Corporation page01 Step1: ... Structures wood and vinyl octagon gazebos. De-pending

A: Locate the door header boards. B: Interlock boards together and align flush at end.

C: Insert boards above door header and attach with three 2-1/2” screws.

D: Locate the door filler strips. E: Insert the top filler strip as shown and attach using three 2-1/2”screws as shown.

© Suncast Corporation Page 05

Additional Instructions for a wood gazeboNote: The following instructions replace steps 10 & 11 on page 2.

F: Align the side filler strips flush with edge of post trim and attach to post using five trim nails per strip.