Upload
jatlay
View
214
Download
0
Embed Size (px)
Citation preview
8/8/2019 10-Finding the Optimum to-BE
1/25
2010 Supply Chain Council. ALL RIGHTS RESERVED. | < filename > | Slide 1 | 16 November 2010
Finding the Optimum TO-BE
Steven LIM,THALES Aerospace Singapore
8/8/2019 10-Finding the Optimum to-BE
2/25
2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 2 | 16 November 2010
Three market driven core business
Aerospace AirSystems
Land &Joint
Systems
Naval SecuritySolutions &
Services
Space
SecurityDefenceAerospace
A coherent organisationBringing customers the benefit of technology expertise
and international presence
Introduction to THALES
8/8/2019 10-Finding the Optimum to-BE
3/25
2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 3 | 16 November 2010
Worldwide Presence
France : 35000
United States : 2200
Australia : 3600
Other countries
Canada : 1400
United Kingdom : 9000
Germany : 5000
Spain : 2260
Korea : 1370
Netherlands: 2000
Italy : 2600
Belgium : 1050
68000 employees in over 50 countries
Saudi Arabia, China, South Africa, Switzerland, India, Austria, Norway, Portugal,Poland, Argentina, Brazil
Singapore : 380
8/8/2019 10-Finding the Optimum to-BE
4/25
2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 4 | 16 November 2010
Learning and using SCOR
Our first project inSingapore
Challenges
Advantages
Quickwins and benefits
8/8/2019 10-Finding the Optimum to-BE
5/25
2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 5 | 16 November 2010
A New Challenge...
8/8/2019 10-Finding the Optimum to-BE
6/25
2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 6 | 16 November 2010
The Projects Objectives
8/8/2019 10-Finding the Optimum to-BE
7/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 7 | 16 November 2010
Project roadmap
8/8/2019 10-Finding the Optimum to-BE
8/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 8 | 16 November 2010
Mapping of the As-Is
As-Is done in France What did we find?
Disconnects?
Flow?
Tools?
Etc...
8/8/2019 10-Finding the Optimum to-BE
9/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 9 | 16 November 2010
Number of process (by phase, & by process)
8/8/2019 10-Finding the Optimum to-BE
10/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 10 | 16 November 2010
Designing the To-Be
SPC
8/8/2019 10-Finding the Optimum to-BE
11/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 11 | 16 November 2010
Organization of the Phases
8/8/2019 10-Finding the Optimum to-BE
12/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 12 | 16 November 2010
Plan process similarities during the transfer
8/8/2019 10-Finding the Optimum to-BE
13/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 13 | 16 November 2010
Execution process similiarities
during the transfer
8/8/2019 10-Finding the Optimum to-BE
14/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 14 | 16 November 2010
Enable Processes
SPC
8/8/2019 10-Finding the Optimum to-BE
15/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 15 | 16 November 2010
Enable processes relevant to the project
8/8/2019 10-Finding the Optimum to-BE
16/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 16 | 16 November 2010
The Big Picture
8/8/2019 10-Finding the Optimum to-BE
17/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 17 | 16 November 2010
Moving from Phase 1 to Phase 2
SPC
SPC
8/8/2019 10-Finding the Optimum to-BE
18/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 18 | 16 November 2010
Level 1 Mapping
SPC
SPC
8/8/2019 10-Finding the Optimum to-BE
19/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 19 | 16 November 2010
Level 2 Mapping
SPC
SPC
8/8/2019 10-Finding the Optimum to-BE
20/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 20 | 16 November 2010
Source & Source Return (Before STR)
Phase 1 before STR, TBU provides all materials.
Phase 1 after STR, all materials source directly.
8/8/2019 10-Finding the Optimum to-BE
21/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 21 | 16 November 2010
Localization to the region and Singapore
Localization of manufacturing Tier 1
Tier 2 & components
And more...
http://www.plexus.com/index.phphttp://www.venture.com.sg/index.htmlhttp://www.jinpao.co.th/default2.asp8/8/2019 10-Finding the Optimum to-BE
22/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 22 | 16 November 2010
Incorporation into the THALES SPC QMS
TAA-G-010 Overall View of Processes
8/8/2019 10-Finding the Optimum to-BE
23/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 23 | 16 November 2010
THALES SPCs 1st Product
8/8/2019 10-Finding the Optimum to-BE
24/25 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 24 | 16 November 2010
Successful
Airbus IPCA Audit & GSAC Accreditation
8/8/2019 10-Finding the Optimum to-BE
25/25
Thank you