Upload
hadung
View
214
Download
0
Embed Size (px)
Citation preview
Divisio
n:
Filena
me:
002
_Estim
ated
Quantities.d
gn
Userna
me:
Date:1/19/2
017
ESTIMATED QUANTITIES
ITEM NO. QUANTITYDESCRIPTION UNIT
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
D
- -B.
Grenier
C.
Morin
1\
17
ST
AT
E
RO
UT
E
7
PL
YM
OU
TH
PE
NO
BS
CO
T
CO
UN
TY
IN
TE
RS
TA
TE
95
2OF 20
BRID
GE N
O.5
960
MIC
HA
EL
WIG
HT
_ _ _ _
_ _ _ _
__
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
- -
H.
Walton
P.
Bis
hop
WIN 1
8972.0
0
B
RID
GE P
LA
NS
- -
1\
17
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
ST
AT
E O
F M
AIN
E
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
ES
TI
MA
TE
D
QU
AN
TITIE
S
LS
LS
EA
HR
LS
SF
EA
EA
EA
LS
EA
HR
HR
HR
HR
HR
EA
EA
LF
SF
SF
LF
SY
SY
CY
UN
UN
CY
CY
LS
LF
EA
EA
UN
EA
LS
LS
LS
LS
EA
EA
EA
SF
SF
LS
EA
LS
LS
LS
LB
LB
EA
LS
LS
CY
Ton
Gal
Ton
Ton
Ton
CY
CY
SY
LF
CY
LS
1
1
2
200
1
1050
60
75
2
1
1
10
10
20
50
50
90
90
790
280
60
2550
19
85
5
1
1
5
25
1
375
3
1
2
4
1
1
1
1
10
10
2
20
20
1
1
1
1
1
6789
6789
8
1
1
15
15
100
191
32
235
10
51
1150
1100
19
1
Mobilization
Temporary Soil Erosion and Water Pollution Control
Portable-Changeable Message Sign
Flaggers
Maintenance of Traffic Control Devices (210 CD)
Construction Signs
Cone
Drum
Flashing Arrow
Temporary Traffic Signal - Route 7
Field Office, Type A
Truck-large (including operator)
All Purpose Excavator (including operator)
Air Tool (including operator)
Air Compressor (including operator)
Hand Labor, Straight Time
Temporary Bi-directional White Delineators
Temporary Bi-directional Yellow Delineators
Temporary Painted Pavement Marking Line, White or Yellow
Removing Existing Pavement Markings
White or Yellow Pavement & Curb Marking
4" White or Yellow Painted Pavement Marking Line
HDPE Geomembrane
Erosion Control Geotextile
Erosion Control Mix
Mulch
Seeding Method Number 3
Loam
Stone Ditch Protection
Chain Link Snow Fence 33" (270 LF)
Guardrail, Removed and Reset, Type 3c
Bridge Transition - Remove and Reset
Bridge Transition - Type I
Work Zone Crash Cushions
Permanent Concrete Transition Barrier
Temporary Concrete Barrier, Braced Type I (540 LF)
Temporary Concrete Barrier, Type I (160 LF)
Protective Shield - Steel Girders
Temporary Structural Support - Route 7
Steel Bearings, Expansion, Rocker
Bearing Installation
Expansion Device - Finger Joint
Repair of Vertical Surfaces < 8 inches
Repair of Upward Facing Surfaces - to Reinforcing Steel < 8 inches
Protective Coating for Concrete Surfaces (560 SY)
Curing Box for Concrete Cylinders
High Performance Waterproofing Membrane (1700 SY)
Steel Bridge Railing, 2 Bar (1110 LF)
Shear Connectors (8970 EA)
Stainless Steel Reinforcement, Placing
Stainless Steel Reinforcement, Fabricated and Delivered
Mechanical/Welded Splice
Structural Concrete Curbs and Sidewalks (64 CY)
Structural Concrete Roadway and Sidewalk Slab on Steel Bridges (420 CY)
Structural Concrete, Abutments and Retaining Walls
Temporary Pavement
Bituminous Tack Coat, Applied
Hot Mix Asphalt, 12.5 mm Nominal Maximum Size (Base and Intermediate Base Course)
Hot Mix Asphalt, 9.5 mm Nominal Maximum Size (Shimming)
Hot Mix Asphalt, 12.5 mm Nominal Maximum Size
Aggregate Subbase Course - Gravel
Common Excavation
Removing Pavement Surface
Removing Existing Railings Retained by Department
Removing Existing Structural Concrete
Removing Existing Superstructure Property of Contractor (340 CY)
659.10
656.75
652.41
652.38
652.361
652.35
652.34
652.33
652.30
643.72
639.18
631.172
631.12
631.11
631.10
629.05
627.812
627.811
627.78
627.77
627.75
627.733
620.6012
620.58
619.14
619.12
618.141
615.07
610.18
607.183
606.366
606.1726
606.1721
527.34
526.34
526.305
526.301
524.40
524.301
523.5304
523.52
521.23
518.60
518.50
515.21
514.06
508.14
507.0811
505.08
503.27
503.26
503.17
502.49
502.26
502.21
461.131
409.15
403.213
403.211
403.208
304.10
203.20
202.202
202.13
202.12
202.10
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
D
- -B.
Grenier
C.
Morin
1\
17
Divisio
n:
Filena
me:
013
_Bearin
g
Details.d
gn
Userna
me:
Date:1/13/2
017
ST
AT
E
RO
UT
E
7
PL
YM
OU
TH
PE
NO
BS
CO
T
CO
UN
TY
IN
TE
RS
TA
TE
95
13OF 20
BRID
GE N
O.5
960
BE
ARIN
G
DE
TAIL
S
MIC
HA
EL
WIG
HT
_ _ _ _
_ _ _ _
__
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
- -
H.
Walton
P.
Bis
hop
WIN 1
8972.0
0
BRID
GE P
LA
NS
- -
1\
17
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
WIN
1'-3
" E
mbed
ment
Swedge Bolts
3" = 1'-0"
ANCHOR BOLT DETAIL
Š
…
3" = 1'-0"
BEARING NOTES:
3" = 1'-0"
MASONRY PLATE
Radius = 8"
Typ.
Top and two sides
1.25" Radius-Rocker Ê
1.27" Radius-Sole Ê
See Detail
1" Ì Pintle
PROPOSED EXPANSION BEARINGS AT ABUTMENT 1 AND ABUTMENT 2
…
…
tests are not required for steel used in bearing pedestals.
Grade 50 and shall be galvanized after fabrication. Charpy v - notch
5. All steel for rocker bearing assemblies shall conform to ASTM A709,
Item 523.5304 "Steel Bearings, Expansion, Rocker."
and delivery of new bearings and anchor rods shall be made under
made under Item 523.52 "Bearing Installation." Payment for fabrication
installation of new anchor rods and cleaning the bridge seats, shall be
removal and installation of new bearings, including removal and
Existing anchor rods shall be cut flush with bridge seat. Payment for
be removed and replaced, and existing bridge seats shall be cleaned.
4. Existing rocker bearings at Abutment No. 1 and Abutment No. 2 shall
3. Upset the threads of the anchor rods after assembly.
and resin based adhesive bonding systems.
the Maine Department of Transportation Qualified Products List of epoxy
2. All anchor rods shall be grouted in place using a material listed on
and shall be swedged on the embedded portion of the rod.
1. Anchor rods shall meet the requirements of ASTM F1554, Grade 55
BEARING REPAIR PLAN
ˆ" = 1'-0" Replace Bearings-
Legend:
PINTLE DETAILFULL
1'-7‚
"
1•" Ì
1•"
10"
4" 4"
1'-0‚
"
2"
8"
•" •"
2"
ƒ"
‚"
5ƒ
"2"
2•
"
„"
•"
1"
„"
•"
1"
•"
3" 3"2"
1'-8"
2"2" 2"3"3"
2"
10"
2"
1'-8"
2" 2"
Sole Ê
4" 4"
8"
1"1"
2 Hex. Nuts
4" Thread
1‡"Ì Holes For 1•"Ì Anchor Bolts
1‡"Ì Holes For 1•"Ì Anchor Bolts
Keeper Ê …X 1ƒ X 0'-4" long
Standard Washer
4" 4"
É Abut. 1 É Abut. 2É Pier 5É Pier 1
É Route 7
1„"
„"
†"
‡"
1"Ì
R=3"
NOTES: SUGGESTED PROCEDURE FOR TEMPORARY SUPPORT, JACKING,
BEARING REMOVAL AND INSTALLATION AT ABUTMENTS:
TEMPORARY SUPPORT AND JACKING SYSTEM NOTES:
8. Remove temporary support system.
bottom flange of girder.
new bearings. Weld sole plate of bearing assembly to
7. Slowly release jacks and lower superstructure onto
superstructure lowering.
vertical supports (blocking or ram locks) in preparation for
6. Jack (hydraulically support) bridge and remove temporary
new anchor rods.
5. Furnish and install proposed bearings. drill and anchor
Trim existing anchor rods flush with top of concrete seat.
4. Remove and dispose existing rocker bearing assemblies.
temporary support system.
jack rams or by furnishing and installing an independent
3. Support superstructure in jacked position by locking the
upward to unload existing abutment bearings.
system. Jack bridge in accordance with special provision
2. Furnish and install temporary support and jacking
1. Field measure all proposed bearing locations.
jacking and temporary structural support loads.
3. See Special Provision for calculated unfactored
shall not be hydraulically supported.
Except for during jacking operations, the superstructure
furnishing and installing an independent support system.
position shall be provided by locking the jack rams or by
2. Rigid vertical support of superstructure in the jacked
Maine. See special provision for additional requirements.
shall be stamped by a professional engineer licensed in
replacement procedure. The calculations and drawings
temporary support, jacking system, and bearing
complete set of design calculations and drawings for the
designed by the Contractor. The Contractor shall submit a
1. The temporary support and jacking system shall be
existing girder shall be by mechanical methods only.
Removal of the existing sole plate at the interface of the
grinding, mechanical cutting or arc gouging methods.
3. Existing steel rocker bearings shall be removed by
dimensions prior to submission of shop drawings.
drawings. The contractor shall field verify all relevant
the plans are based on as-built and standard detail
2. All existing dimensions and information shown on
framing plan.
steel rocker bearings at abutments as shown in the
1. This work includes removal and replacement of select
2"
2"
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
D
- -B.
Grenier
C.
Morin
1\
17
Divisio
n:
Filena
me:
018
_Trough
Details.d
gn
Userna
me:
Date:1/13/2
017
ST
AT
E
RO
UT
E
7
PL
YM
OU
TH
PE
NO
BS
CO
T
CO
UN
TY
IN
TE
RS
TA
TE
95
18OF 20
BRID
GE N
O.5
960
TR
OU
GH
DE
TAIL
S
MIC
HA
EL
WIG
HT
_ _ _ _
_ _ _ _
__
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
- -
H.
Walton
P.
Bis
hop
WIN 1
8972.0
0
B
RID
GE P
LA
NS
- -
1\
17
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
N.T.S.
É Brg. Abutment
SECTION THROUGH CURTAIN TROUGH AT ABUTMENT
NEOPRENE SHEET TYPE "A"
NEOPRENE SHEET TYPE "B"
TYPE "A" TROUGH PLATE DETAIL
TYPE "B" TROUGH PLATE DETAIL
NOTES:
(2 Required Per Curtain)
(2 Required Per Curtain)
Curtain dimensions are based on As-Built plans, Contractor shall verify all curtain dimensions in the field.7.
incidental to the pay item 620.6012 HDPE Geomembrane.
surface maintaining existing cross slope to drain. Preparation of the existing surface shall be considered
Where HDPE liner is to be installed, roughen existing surface •" and apply •" thick grout to the prepared 6.
grout bedding, shall be considered paid for under pay item 620.6012, HDPE Geomembrane.
recommendations. Payment for all work and materials needed to install the HDPE membrane and where required, the
undamaged and installed in the cementitious substrate and in accordance with the manufacturer's
The Contractor shall take care in the installation of the HDPE membrane that the extruded anchors are completely 5.
Geomembrane.
with Section 620 Special Provision. Payment for the HDPE liners will be made under Item 620.6012 HDPE
HDPE liner shall be installed in the locations shown on the design drawings and securely fastened in accordance 4.
Finger Joint.
Payment for neoprene curtain troughs, including anchor bars and hardware, will be made under Item 521.23 - 3.
Payment for curtain plates shall be considered incidental to the respective expansion device - finger joint pay item.2.
with the provisions of Section 521 of the Standard Specification.
Fabrication and materials for the curtain trough, including galvanization of steel components, shall be in accordance 1.
ANCHOR BAR
corresponding trough plate)
(Match length and hole spacing to
6" = 1'-0"
Existing Grade
Abutment Seat
2'-5"
HDPE Liner
1"
Geomembrane
to 620.6012 HDPE
better drainage. Incidental
abutment seat slope for
Additional grout to increase
Top of Seat Between Girders
Neoprene Curtain Trough
Finger Joint
Trough Plate (Typ.)
(Typ.)
3'-4"
(Typ.)
3'-9"
(Typ.)
2•"
2"
2ƒ
"
Fold Line
2"
2ƒ
"
(Typ.)
1'-9"
(Typ.)
1•"
(Typ.)
2'-0"
Line
Fold
4'-0"
2'-3"
@ 8" Sp. = 3'-4"
6 - Œ" Holes
@ 7" Sp. = 1'-9"
4 - Œ" Holes
3"
3"
4"
4"
136°25'38"
2'-5‚
"
2'-5‚"
2'-5‚
"
2'-5‚"
136°25'38"
Bar 2…" x ‚"
„" Radius
•" Hole