7/23/2019 1000MW Wind Power Project
1/27
1000 MW Wind Power Project
Key Challenges
Z A
Tin Min Latt
Project Manager
1000 MW Wind Power ProjectZeya & Associates 1
7/23/2019 1000MW Wind Power Project
2/27
Content
Introduction
Wind Mapping
Site Survey & Weather Mast Installation
Challenges
Conclusion
2
7/23/2019 1000MW Wind Power Project
3/27
Introduction
3
7/23/2019 1000MW Wind Power Project
4/27
Kayin & Mon
4
7/23/2019 1000MW Wind Power Project
5/27
Tanintharyi
5
7/23/2019 1000MW Wind Power Project
6/27
Tanintharyi
6
7/23/2019 1000MW Wind Power Project
7/27
Developer
Gunkul Engineering Public, Thailand.
Impact Energy Asia, Hong Kong.
Zeya & Associates, Myanmar.
Consultant
GL Garrad Hassan, Australia
7
7/23/2019 1000MW Wind Power Project
8/27
Wind Mapping
8
7/23/2019 1000MW Wind Power Project
9/27
Wind Mapping Process
International wind expert hascompleted an extensive wind
mapping process for Myanmar.
Micro-scale wind modeling carried
out at a grid spacing of 1 km
resolution.
Wind Speed determined at hub height
80m.
Overall estimated wind speed mean to
be 5.5 m/s and up to 7 m/s in some
areas close to the border of Thailand.
Uncertainty is inherent in this modeling
process.
Modeling has allowed us to choose the
best positioning for approximately three wind
speed recording towers, 9
7/23/2019 1000MW Wind Power Project
10/27
CONSTRAINT SCORES
Distance Scoring
Transmission lines
Population Centres
Roads & Rails
Grip Points Scoring
Wind Resources
Topographic Complexity
10
7/23/2019 1000MW Wind Power Project
11/27
Potential Site Information
11
7/23/2019 1000MW Wind Power Project
12/27
Site Survey & Weather Mast
Installation
12
7/23/2019 1000MW Wind Power Project
13/27
Survey PointsM2-Tanintharyi Division
M5-Kayin State
M4-Mon StateM3-Mon State
M8-Mon State
13
7/23/2019 1000MW Wind Power Project
14/27
M2-Kadwe Site Tanintaryi Division
Latitude:
1414'25.01"N
Longitude:
9823'47.14"E
14
7/23/2019 1000MW Wind Power Project
15/27
M3-Zingyalk Site Mon State
Latitude:
1642'16.38"N
Longitude:
9727'25.07"E
15
7/23/2019 1000MW Wind Power Project
16/27
M5-Kawkareik Site Kayin State
Latitude:
1632'18.20"N
Longitude:
9815'27.35"E
16
7/23/2019 1000MW Wind Power Project
17/27
M-8 Chaungsauk Site Mon State
Latitude:
1716'21.35"N
Longitude:
97 2'46.92"E
17
7/23/2019 1000MW Wind Power Project
18/27
Weather Mast Installation
Soil Test
Tower Foundation
Tower Erection
18
7/23/2019 1000MW Wind Power Project
19/27
Key Challenges
19
7/23/2019 1000MW Wind Power Project
20/27
Key Challenges
Technology & Experience
Finance
Infrastructure
Land Leasing
Political & Public Relation
20
7/23/2019 1000MW Wind Power Project
21/27
Technology & Experience
First Project in Myanmar
Experience Personnel
Wind Turbine Selection
High Tower Construction
Meteorological Data Collection
21
7/23/2019 1000MW Wind Power Project
22/27
Finance
Significant Project
Financing and Insurance
Power Purchase Structure
Long Term PPA
22
7/23/2019 1000MW Wind Power Project
23/27
Infrastructure
23
RoadsAccess & Limitation
RailsAccess & Limitation
BridgesAccess & Limitation
Communication
Transmission Line Intelligent Control System for Generation
Mix
7/23/2019 1000MW Wind Power Project
24/27
Agriculture Area
Reserve Forest
Religious Building
Land Leasing
24
7/23/2019 1000MW Wind Power Project
25/27
Political & Public Relation
Local Authorities & Civilians
Investment Law
Rule & Regulation
Transparency
Environmental Impact Assessment
Social Impact Assessment
25
7/23/2019 1000MW Wind Power Project
26/27
Conclusion
There are many challenges but we are able to
overcome them with strong support from
ADB.
We would like to invite companies and
financial institutions to support technologies
and financial to involve wind power project in
Myanmar.
26
7/23/2019 1000MW Wind Power Project
27/27
Thank You
for
Your Attention
27