1

Click here to load reader

103

Embed Size (px)

DESCRIPTION

103

Citation preview

Page 1: 103

0002PDI

V

D

OSW

NOTE 3

D

VV

3350

DIESEL

DS101-TRJR-480025

FROM 101-E-0009

3351

DIESEL

DS101-TRJR-480013

TO 101-E-0005-A-D

3689

3515

273516

27

362629

362729

3688

383825

383925

101-153101-155

101-154

101-158

101-154101-154101-151101-151

101-153

101-156

FOR GENERAL NOTES, SYMBOLS AND DETAILS SEE DRAWINGS SA-JER-DSAAA-TRJR-480001 THROUGH SA-JER-DSAAA-TRJR-480022.2-

VV

D

101-155

101-151

101-152

D

DELETED.2-FOR CLEANOUT.3-START-UP CIRCULATION4-FOR START-UP.5-

DELETED.2-

HSRDP / HPRARV / FCBIFD: ISSUED FOR DESIGNIFD23-DEC-200900

V

V

V

D

BLANKOFF WHEN NOT IN USE.1-

V

101-S-0002-A/B

NOTE 1

NOTE

4

NOTE 3

NOTE 1

NOTES

DRAIN VALVE ON EQUIPMENT AND/OR PIPING SHALL BE INSTALLED FLANGE TO FLANGE OR AT MINIMUM DISTANCE FROM THE EQUIPMENT/PIPING TO BE DRAINED.4-ALL LINES CONNECTED TO CLOSED DRAINS SYSTEMS SHALL BE GRAVITY FLOW DESIGNED.3-

EACH INSTRUMENT TAG NUMBER IS PREFIXED BY 101 (EX 101-TT-0001). THIS DRAWING IS VALID FOR TWIN LP HDS: UNITS 101 AND 102.1-GENERAL HOLDS

NOTE 6

NOTE 6

NOTE 6

NOTE 6

THE GATE VALVE SHALL BE INSTALLED WITH STEM IN OR BELOW THE HORIZONTAL POSITION.6-

101-153

101-151

101-152

HOLDS

HSRDP / HPRMMG / FCBAFC: APPROVED FOR CONSTRUCTIONAFC18-MAY-201001

DES. PRESS: 23.3 barg AT 186 ºC AND FULL VACUUM ( FV ) AT 80 ºC.7-MAKE CONNECTION ON TOP OF PIPE.8-

NOTE 7

NOTE 8 NOTE 8

101-S-0002-A

2"-O

SW-1

0100

6302

-101

CS1P

-N

1-1/2"-HCB-101006010-103CS1P-N

1-1/2"-CLD-101006302-101CS1P-N

101-S-0002-B

OP. TEMP. °C

FILTERSTYPE

DES. PRESS. bargDES. TEMP. °C

OP. PRESS. bargDES. CAPACITY m³/h

GAS FILTER

77.00

101-S-0002-A

186.0023.30

4.07392.0

/ B

101CS1P103CS1P101-SP-0005

TO 101-D-0001HYDROCARBONS

3/4"-OSW-101006301-101CS1P-N

FEED FILTERS101-S-0002-A/ B

10"-HCB-101005002-103CS1P-H

3/4"

3/4"

NC

10"-H

CB-1

0100

6003

-103

CS1P

-H

101CH2F103CS1P

3/4"

MIN.

11

SA-JER-DS101-TRJR-480002

DISTILLATION AND HYDROTREATING

2271-101-PID-0021-006

FEED FILTERS

SA-JER-DS101-TRJR-480002

LOW PRESSURE HYDRODESULPHURISATION TRAIN 1

02

101CS1P103CS1P

101C

S1P

101CS1P103CS1P

101CS1P

3/4"-HCB-101005002-103CS1P-P3/4"-HCB-101005002-103CS1P-P

3"x2"

3"x1"

3"x2"

103C

S1P

101C

S1P

3"x1"3/4"3/4"

LOFBLO

FB

CL300 CL3003/4"3/4"

10"-HCB-101006005-103CS1P-H

3/4"

FBLO

3/4"

3"-LPF-101006301-101CH2F-N

PZV0019

+

1"D2"23.30

+

103CS1P101CH2F

NC

3/4"

3/4"

10"-H

CB-1

0100

5002

-103

CS1P

-H

8"-HCB-101027003-103CS1P-N

8"-H

C B-1

0102

7003

-103

CS1P

-N

3/4"

NC

3/4"

3/4"- L

PN-1

010 0

6302

-10 1

CS1P

-N

101CS1P103CS1P

3/4"

3/4"- L

PN-1

010 0

6301

-10 1

CS1P

-N

LPT

MIN. MIN.

MIN.

250 m

m MI

N.

6"-H

C B-1

0100

6004

-103

CS1P

-H

2"-CLD-101006301-101CS1P-N

103CS1P

10"-HCB-101005002-103CS1P-H

H

3/4"

NC

3/4"

PZV0020

+

1"D2"23.30

+

3"-LPF-101006302-101CH2F-N

3/4"

LOFB

3"-H

CB-1

0100

6007

-103

CS1P

-H

10"-H

CB-1

0100

6003

-103

CS1P

-H

2"-CLD-101006301-101CS1P-N2"-CLD-101006301-101CS1P-N

2"

3"-H

CB-1

0100

6006

-103

CS1P

-H

TRIM: HCB-101006601-106CS1P

101-SP-0006

APPR/AUTH BYCHECKED BYPREPARED BYDATE REVISION MEMOREV

UTILITIES IDENTIFICATIONPOS. DESCRIPTION REF. DWG POS. DESCRIPTION REF. DWG

123456789101112131415161718

1920212223242526272829303132

FIRE WATERSERVICE WATERCOOLING WATERPOTABLE WATERDEMI WATERN.A.N.A.N.A.HP STEAMMP STEAMLP STEAMHP CONDENSATEMP CONDENSATELP CONDENSATEBFWPLANT AIRINSTRUMENT AIRN.A.

N.A.

N.A.N.A.N.A.

FUEL OILFUEL GAS

CLOSED DRAINN.A.L.P. NITROGENH.P. FLAREL.P. FLARESOUR/ACID FLAREPILOT GASAUX COOLING WATER

1

2

3

4

5

6

7

8

9

10

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

11

1

2

3

4

5

6

7

8

9

10

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

11

GENERAL NOTES

COMPANYSTATUS

Contractor/Vendor

COMPANYDocument N°

Document N°

Syst./ S-Syst.: Discipline:Electronic Filename

SCALE: NONEREV:

Format:

Item Tags :

JUBAIL EXPORT REFINERYPIPING AND INSTRUMENT DIAGRAM

Project:

A1

This document is the property of SATORP and shall not be disclosed to third parties or reproduced without permission of the owner.

.pid

Sheet: of

PRO

CL600 CL60010"N2 N1

10"

103C

S1P

CL600

2"

N4

N53"

1200

mm

DELETED.6-

20"M1 M1

20"

103C

S1P

101C

S1P

2"-HCB-101006009-103CS1P-N

10"-HCB-101005002-103CS1P-H

CL6002"-HCB-101006008-103CS1P-N

CL600

CL600

CL600

3"N5

N4

N1 N2

N3N310" 10"

2"

CL600

1200

mm

2"-OSW-101006303-101CS1P-N

INSULATION: H

FROM 101-S-0001HYDROCARBONS

2" V

HSAVS / HPRJGT / FCBAFC: APPROVED FOR CONSTRUCTIONAFC22-DEC-201002NO

TE 5

02

02

02

OPERATIVE TEMP= 50ºC DIESEL CASE AND 77ºC KERO CASE.9- 02

1,3,4,5 - DELETED.

NOTE 9 02

0002PDT

3/4"

3/4"

INST.PIPING

PIPINGINST.

02

02

0202

02 02

02

02

02

02

0202

02

02

02

02

0.2%0.2%

02

0202

02

02

MIN.MIN.

02

02 02

02

MIN.

0202

pena.i
Nuevo sello