ASCE 2013 Tri-County Workshop State of South Florida’s Infrastructure Miami-Dade County WASD Infrastructure Update May 10, 2013

1.1 mdwasd update

Embed Size (px)

Citation preview

Page 1: 1.1 mdwasd update

ASCE2013 Tri-County Workshop

State of South Florida’s Infrastructure

Miami-Dade CountyWASD Infrastructure Update

May 10, 2013

Page 2: 1.1 mdwasd update

Existing Water Infrastructure• 3 large regional and 5 small water treatment plants• 100 water supply wells• 7,918 miles of pipes• 38,000 fire hydrants• 126,000 valves• 11 treated water storage tanks • 455,000 water meters

Page 3: 1.1 mdwasd update

Existing Wastewater Infrastructure

• 3 wastewater treatment plants

• 2 ocean outfalls• 21 deep injection wells• 6,277 miles of pipes• 1,042 sewer pumps

stations

Page 4: 1.1 mdwasd update

Infrastructure Deficiencies• In February 2012, the Board of County

Commissioners directed the Mayor to provide report addressing WASD’s aging and deteriorating infrastructure

• In July 2012, report transmitted to the Board • Report identified:

– Critical water and sewer projects– $1.1 Billion estimated cost to implement

$364.2 Million Water $736.1 Million Wastewater

– Funding needs

Page 5: 1.1 mdwasd update

Regulatory Requirements

• Federal Clean Water Act (EPA Consent Decree)

• State 2008 Ocean Outfall Legislation

• 20-Yr Water Use Permit

Page 6: 1.1 mdwasd update

EPA Consent Decree

• Implementation of capital projects in 15 years, at a cost of about $1.6 billion

• Development of Capacity, Management, Operation, and Maintenance (CMOM) Procedures to ensure compliance with Clean Water Act

• Implementation of a Supplemental Environmental Project for $2.047 million

Page 7: 1.1 mdwasd update

State Ocean Outfall Legislation

• Bill passed in the 2008 Session requires: July 1, 2013, submit implementation plan to FDEP Reduce nutrients out to the ocean December 31, 2025, stop using outfall and implement 60%

reuse

• On April 24, 2013, the Governor signed an amendment to the bill that saves WASD approximately $1 Billion by: Allowing wet weather flows to continue going out the outfall (up

to 5% of the flow) Giving credit for reuse at other facilities (WASD/FPL 90 MGD

reuse project)

Page 8: 1.1 mdwasd update

MYCIP FY 13-19 Combined (000)

Total Proposed FY13-19 Plan is $12.6Billion:– $4.08 Billion Water– $8.56 Billion Wastewater

$0

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

$7,000,000

$8,000,000

Prior FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 Future

$722,134$312,415

$551,681 $582,923$930,315 $1,102,733 $924,694

$7,508,328

Page 9: 1.1 mdwasd update

MYCIP FY13-19 Drivers

Aging Infrastructure

Projects, $4,321,631 , 34%

Regulatory Compliance

Projects, $4,668,179 , 37%

Plant Rehabilitation, $891,627 , 7%

Consent Decree, $1,603,677 , 13%

All Other, $1,150,109 ,

9%

Page 10: 1.1 mdwasd update

Funding Sources

Page 11: 1.1 mdwasd update

Funding Sources

FUNDING SOURCES Amount (000)'s

Future WASD Revenue Bonds $8,861,800

Renewal and Replacement Fund $2,675,727

2013 Revenue Bond Sold $300,000

WASD revenue Bond Sold $237,748

General Obligation Fund $204,809

Plant Expansion Fund $200,086

HLD - Construction Fund $74,146

Special Construction Funds $46,364

Fire Hydrant Fund $34,542

Total $12,635,222

Page 12: 1.1 mdwasd update

Significant Water ProjectsProject Description Multi-Year

Impact

% Multi-Year Impact

WATER TREATMENT PLANT ALEXANDER ORR JR. EXPANSION $428,442 11%

WATER DISTRIBUTION SYSTEM EXTENSION ENHANCEMENTS $1,756,804 43%

SAFE DRINKING WATER ACT MODIFICATIONS-SWT RULE & D-DBP $631,424 15%

SOUTH MIAMI HEIGHTS WATER TREATMENT PLANT & WELLFIELDS $189,085 5%

WATER SYSTEM MAINTENANCE AND UPGRADES $336,772 8%

ALL OTHER PROJECTS $732,655 18%

TOTAL $4,075,182

Page 13: 1.1 mdwasd update

Significant Wastewater ProjectsProject Description Multi-Year

Impact

% Multi-Year Impact

SOUTH DISTRICT WASTEWATER TREATMENT PLANT EXPANSION $237,010 2%

CONSENT DECREE WASTEWATER TREATMENT PLANTS $1,026,767 11%

PEAK FLOW MANAGEMENT $867,392 9%

SANITARY SEWER SYSTEM EXTENSION $434,625 5%

CONSENT DECREE WASTEWATER COLLECTION AND TRANSMISSION LINES

$470,142 5%

CONSENT DECREE SEWER PUMP STATION SYSTEMS $106,768 1%

OUTFALL LEGISLATION $2,987,930 42%

ALL OTHER PROJECTS $2,429,407 25%

TOTAL $8,560,041