24
APD T APD TRAINING RAINING 11/29/2011 – Inspection Agency APD T APD TRAINING RAINING APD APD Timing of training of simulation laboratories New Functions Simulation Submissions Simulation Submissions IA Home Page It d ti t A hi i Introduction to Archiving – Comments/Questions

11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

APD TAPD TRAININGRAINING

11/29/2011 – Inspection Agency

APD TAPD TRAININGRAINING

APD• APD– Timing of training of simulation laboratories– New Functions– Simulation SubmissionsSimulation Submissions– IA Home Page

I t d ti t A hi i– Introduction to Archiving– Comments/Questions

Page 2: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

APD TAPD TRAININGRAINING OFOF SSIMULATORSIMULATORS

New Business

APD TAPD TRAININGRAINING OFOF SSIMULATORSIMULATORS

T b d t d d i t LAP• To be conducted during next LAP Workshop (late December/early Jan).

Page 3: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

NNEWEW FFUNCTIONSUNCTIONS

APD Training

NNEWEW FFUNCTIONSUNCTIONS

R tifi ti• Recertification

• RevisionRevision

Page 4: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

SSIMULATIONIMULATION SSUBMISSIONSUBMISSIONS

APD Training

SSIMULATIONIMULATION SSUBMISSIONSUBMISSIONS

U l d/S b itt l P O i• Upload/Submittal Page Overview

• Procedural OverviewProcedural Overview

Page 5: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

SSIMULATIONIMULATION SSUBMISSIONSUBMISSIONS

APD Training

SSIMULATIONIMULATION SSUBMISSIONSUBMISSIONS

R tifi ti• Recertification– Active and in-active product lines

Page 6: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

SSIMULATIONIMULATION SSUBMISSIONSUBMISSIONS

APD Training

SSIMULATIONIMULATION SSUBMISSIONSUBMISSIONS

R i i• Revision– Active product lines

Page 7: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

SSIMULATIONIMULATION SSUBMISSIONSUBMISSIONS

APD Training

SSIMULATIONIMULATION SSUBMISSIONSUBMISSIONS

Edit t P d t Li i APD• Edits to Product Line in APD

Page 8: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

IA HIA HOMEOME PPAGEAGE

APD Training

IA HIA HOMEOME PPAGEAGE

L b R t T b• Lab Reports Tab

• U-factor Submissions TabU factor Submissions Tab

• Recertification Tab

• Revision Tab

Page 9: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

LLABAB RREPORTSEPORTS TTABAB

APD Training

LLABAB RREPORTSEPORTS TTABAB

U d f N P d t Li l d• Used for New Product Line uploads

• Submission of an upload spreadsheet onlySubmission of an upload spreadsheet only– No Changes

Page 10: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

UU--FACTORFACTOR SSUBMISSIONSUBMISSIONS TTABAB

APD Training

UU FACTORFACTOR SSUBMISSIONSUBMISSIONS TTABAB

N l d d h t• No upload spreadsheets

• Existing Product Line data edited by theExisting Product Line data edited by the lab

Introduces a U factor rating to currently– Introduces a U-factor rating to currently certified interior applied film product lines. A t i li d fil i d th i– Any exterior applied film, expired, or other in-active status product lines are not available for U-factor additionfor U factor addition.

Page 11: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

UU--FACTORFACTOR SSUBMISSIONSUBMISSIONS ((CONTCONT ))APD Training

UU FACTORFACTOR SSUBMISSIONSUBMISSIONS ((CONTCONT.).)

A f t ith t U f t ti– A manufacturer without a U-factor rating on a current certified interior applied film product line is not authorized to label Simulationsline is not authorized to label. Simulations must be conducted and submitted for IA approval.pp

Page 12: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

RRECERTIFICATIONECERTIFICATION TTABAB

APD Training

RRECERTIFICATIONECERTIFICATION TTABAB

N l d d h t• No upload spreadsheets

• Existing Product Line data edited by theExisting Product Line data edited by the lab

Product Line Information– Product Line Information Series/Model Name, Tint, Rating Procedure

– Report Details Sim Report #, Simulation Date, and Report Date

Page 13: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

RRECERTIFICATIONECERTIFICATION ((CONTINUEDCONTINUED))APD Training

RRECERTIFICATIONECERTIFICATION ((CONTINUEDCONTINUED))

Th APD ill t ti ll l t th L b– The APD will automatically populate the Lab Code, and Report Type from the user’s login informationinformation.

– The APD will automatically populate the Submission Date after the lab selectsSubmission Date after the lab selects “Submit to IA”.

Page 14: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

RRECERTIFICATIONECERTIFICATION ((CONTINUEDCONTINUED))APD Training

RRECERTIFICATIONECERTIFICATION ((CONTINUEDCONTINUED))

Si l ti D t il– Simulation Details Pane ID 1, 2, or 4

Film-Pane Thickness 1, 2, or 4

Film-Tint 1, 2, or 4

SHGC-COG

VT-COG

U-factor rating (for interior films only)

Page 15: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

RRECERTIFICATIONECERTIFICATION ((CONTINUEDCONTINUED))APD Training

RRECERTIFICATIONECERTIFICATION ((CONTINUEDCONTINUED))

Page 16: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

RREVISIONEVISION TTABAB

APD Training

RREVISIONEVISION TTABAB

• No upload spreadsheets• No upload spreadsheets

• Existing Product Line data edited by the lab– Report Details Sim Report #, Simulation Date, and Report Date

L b C d t ti l t f th ’ l i Lab Code - automatic populate from the user’s login information.

Report Type automatic populate from the user’s login i f tiinformation.

Submission Date – automatic populate upon submission

Page 17: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

RREVISIONEVISION (C(CONTINUEDONTINUED))APD Training

RREVISIONEVISION (C(CONTINUEDONTINUED))

Product Line Information– Product Line Information Series/Model Name, Tint, Rating Procedure

Simulation Details– Simulation Details Pane ID 1, 2, or 4 Film-Pane Thickness 1 2 or 4 Film-Pane Thickness 1, 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG VT-COG U-factor rating (for interior films only)

Page 18: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

RREVISIONEVISION ((CONTINUEDCONTINUED))APD Training

RREVISIONEVISION ((CONTINUEDCONTINUED))

Page 19: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING

APD Training

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING

• What is it for?• What is it for?– Capture and store historical product line information

whenever a product line is revised or recertified. (Does not include ‘05’ Archive status)(Does not include 05 Archive status)

• New user requirements?( )– No separate login or administrative page(s)

• What will be available for viewing?– All product line data (including header and simulation

details) – Submission type and date of submission approvalSubmission type and date of submission approval

Page 20: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING ((CONTCONT))APD Training

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING ((CONTCONT))

St d i d di t d hi d t b• Stored in a dedicated archive database– Users will access the archive viewer from the

APD application via the product line details screen for those product lines with archive data availabledata available.

Page 21: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING ((CONTCONT))APD Training

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING ((CONTCONT))

NFRC Ad i IA d MFR l i– NFRC Admins, IAs, and MFRs user login information will be encrypted and securely passed to the archive viewer application topassed to the archive viewer application to ensure users are only able to view the data they are associated with.y

Page 22: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING ((CONTCONT))APD Training

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING ((CONTCONT))

A hi i li ti b– Archive viewer application by pop-up screen.– Screen color difference for easy recognition Advantages: Side by side comparison with the

active data for that same product line.

Page 23: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING ((CONTCONT))APD Training

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING ((CONTCONT))

Page 24: 11/29/2011 – Inspection Agency APD TRAINING...11/29/2011 – Inspection Agency APD T • APD – Timing of training of simulation laboratories ... 2, or 4 Film-Tint 1, 2, or 4 SHGC-COG

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING ((CONTCONT))APD Training

IINTRODUCTIONNTRODUCTION TOTO AARCHIVINGRCHIVING ((CONTCONT))

T b t t d APD d i t d d i t• To be tested on APD and introduced into CPD