    Job No : 53-007-01

    Project Name : CABDE

    Location : Anyes, West Java, Indonesia

    12.5.2 Piping Fabrication & Erection Schedule for Process AreaLine Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov De

    No

    1 Internal Piping Study

    2Plot Plan

    3 Material Specification

    4 Piping Bill of Material Take-Off

    5

    6

    7 Isometric Drawings

    8 Model Review

    9

    10 Piping Material P/O

    11

    12 Piping Material Delivery on Site

    13 M/C I

    16 Pile

    17 FDN & PC for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4) FDN

    18 Foundation for RC Struc ture(S-101-2,201-4,301-306,401-2)

    19 PC Rack Erection (R1001-2,101-4,201-2,301-2,401-4)

    20 FDN & Structure for Shelter (H101,201-2,301-2) FDN

    21 STL/STR for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4)

    22 STL/STR for Equip. STR (S-101-2,201-4,301-306,401-2)

    23 STL/STR for Shelter (H101,201-2,301-2)

    24 Erection for Column

    25 Erection for Vessel

    26 Erection for Pumps

    27 Erection for Heat Exchanger(TEMA)

    28 Erection for Compressor

    29 Erection for Tank

    30

    31 Area Activity Area No. Work Volume Start-Finish Dur.32 FIELD

    SHOP

    33 FIELD

    SHOP

    34 FIELD

    SHOP

    35 FIELD

    SHOP

    36 FIELD

    SHOP

    - M

    37 - M

    38 FIELD

    SHOP

    39 FIELDSHOP

    40 FIELD

    SHOP

    41 FIELD

    SHOP

    42 FIELD

    SHOP

    - M

    43 - M

    44 FIELD

    SHOP

    45 FIELD

    SHOP

    46FIELD

    SHOP

    47 FIELD

    SHOP

    48 FIELD

    SHOP

    - M

    49 - M

    50 FIELD

    SHOP

    51 FIELD

    SHOP

    52 FIELD

    SHOP

    - M

    53 - M

    50 FIELD

    SHOP

    51 FIELD

    SHOP

    52 FIELD

    SHOP

    - M

    53 - M

    50 FIELD

    SHOP

    51 FIELD

    SHOP

    52 FIELD

    SHOP

    - M

    53 - M

    57 #REF! M

    #REF! M

    #REF!

    85 #REF! M

    86 #REF! M

    87 #REF! M 0

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov De

    * Schedule is based on 30.Apr. 2006

    * B/Q is based on 21.Apr.2011(Prepared by piping team)

    153

    Field Erection Total

    Shop FabricationTotal

    Area(160)

    ISO DWG ISSUE SCH.P/R Tank :

    3" & Above :3" & Under :

    161

    162

    163

    Field Erection Total

    Shop FabricationTotal

    Shop FabricationTotal

    Field Erection Total

    142

    143

    Area(150)

    ISO DWG ISSUE SCH.P/R Tank :

    3" & Above :3" & Under :

    151

    152

    Field Erection Total

    Shop FabricationTotal

    Field Erection Total

    Shop FabricationTotal

    125

    124

    111

    131

    132

    121

    122

    123

    YearMonth

    PJ Month

    Const. Month

    Field & Shop Total

    Field Erection Total

    2011YearMonth

    Total Manpower

    Shop Fabrication Total

    PipingErection

    112

    113

    114

    115

    Area(130)

    ISO DWG ISSUE SCH.Common P/R :P/R, Tower:3" & Above :3" & Under :

    133

    Engineering

    Procument

    Costruction

    MILESTONE

    Field Direct Manpower (Dia-Inch / 1.42 / 26)

    PJ Month

    134

    135

    Const. Month

    Area(110)

    ISO DWG ISSUE SCH.Common P/R :

    P/R,Tank,Tower:3" & Above :3" & Under

    Shop Direct Manpower (Dia-Inch / 3.85 / 26)

    Area(140)

    ISO DWG ISSUE SCH.P/R Tank :

    3" & Above :3" & Under :

    Area(120)

    ISO DWG ISSUE SCH.Common P/R :P/R,Reactor:3" & Above :3" & Under

    141

    Field Erection TotalShop FabricationTotal

    AFC(9/30)AFC(4/15)

    1st(3/31)80%

    2nd(07/31)90%

    30%(4/3-4/14) 60%(8/14-11/11) 90%(11/1/06-01/30/07)

    1st Delivery(9/31)60%

    1st(4/15)80%

    2nd(08/10)90%