Job No : 53-007-01
Project Name : CABDE
Location : Anyes, West Java, Indonesia
12.5.2 Piping Fabrication & Erection Schedule for Process AreaLine Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov De
No
1 Internal Piping Study
2Plot Plan
3 Material Specification
4 Piping Bill of Material Take-Off
5
6
7 Isometric Drawings
8 Model Review
9
10 Piping Material P/O
11
12 Piping Material Delivery on Site
13 M/C I
16 Pile
17 FDN & PC for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4) FDN
18 Foundation for RC Struc ture(S-101-2,201-4,301-306,401-2)
19 PC Rack Erection (R1001-2,101-4,201-2,301-2,401-4)
20 FDN & Structure for Shelter (H101,201-2,301-2) FDN
21 STL/STR for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4)
22 STL/STR for Equip. STR (S-101-2,201-4,301-306,401-2)
23 STL/STR for Shelter (H101,201-2,301-2)
24 Erection for Column
25 Erection for Vessel
26 Erection for Pumps
27 Erection for Heat Exchanger(TEMA)
28 Erection for Compressor
29 Erection for Tank
30
31 Area Activity Area No. Work Volume Start-Finish Dur.32 FIELD
SHOP
33 FIELD
SHOP
34 FIELD
SHOP
35 FIELD
SHOP
36 FIELD
SHOP
- M
37 - M
38 FIELD
SHOP
39 FIELDSHOP
40 FIELD
SHOP
41 FIELD
SHOP
42 FIELD
SHOP
- M
43 - M
44 FIELD
SHOP
45 FIELD
SHOP
46FIELD
SHOP
47 FIELD
SHOP
48 FIELD
SHOP
- M
49 - M
50 FIELD
SHOP
51 FIELD
SHOP
52 FIELD
SHOP
- M
53 - M
50 FIELD
SHOP
51 FIELD
SHOP
52 FIELD
SHOP
- M
53 - M
50 FIELD
SHOP
51 FIELD
SHOP
52 FIELD
SHOP
- M
53 - M
57 #REF! M
#REF! M
#REF!
85 #REF! M
86 #REF! M
87 #REF! M 0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov De
* Schedule is based on 30.Apr. 2006
* B/Q is based on 21.Apr.2011(Prepared by piping team)
153
Field Erection Total
Shop FabricationTotal
Area(160)
ISO DWG ISSUE SCH.P/R Tank :
3" & Above :3" & Under :
161
162
163
Field Erection Total
Shop FabricationTotal
Shop FabricationTotal
Field Erection Total
142
143
Area(150)
ISO DWG ISSUE SCH.P/R Tank :
3" & Above :3" & Under :
151
152
Field Erection Total
Shop FabricationTotal
Field Erection Total
Shop FabricationTotal
125
124
111
131
132
121
122
123
YearMonth
PJ Month
Const. Month
Field & Shop Total
Field Erection Total
2011YearMonth
Total Manpower
Shop Fabrication Total
PipingErection
112
113
114
115
Area(130)
ISO DWG ISSUE SCH.Common P/R :P/R, Tower:3" & Above :3" & Under :
133
Engineering
Procument
Costruction
MILESTONE
Field Direct Manpower (Dia-Inch / 1.42 / 26)
PJ Month
134
135
Const. Month
Area(110)
ISO DWG ISSUE SCH.Common P/R :
P/R,Tank,Tower:3" & Above :3" & Under
Shop Direct Manpower (Dia-Inch / 3.85 / 26)
Area(140)
ISO DWG ISSUE SCH.P/R Tank :
3" & Above :3" & Under :
Area(120)
ISO DWG ISSUE SCH.Common P/R :P/R,Reactor:3" & Above :3" & Under
141
Field Erection TotalShop FabricationTotal
AFC(9/30)AFC(4/15)
1st(3/31)80%
2nd(07/31)90%
30%(4/3-4/14) 60%(8/14-11/11) 90%(11/1/06-01/30/07)
1st Delivery(9/31)60%
1st(4/15)80%
2nd(08/10)90%