FERNAS CONSTRUCTION COMPANY LTD. DAHEJ-VIJAIPUR PIPELINE UPGRADATION PROJECT (DVPL - II) INSPECTION TEST PLAN FOR LOWERING Sl. No. Activities Inspection by FCCL 1 Approval of Procedure W R / A 2 Mechanical Clearance For Lowering W HP Pipe Book 3 Prepadding of lowering section W W FCCL/DVPL-II/81181/ML/JP/11 4 Holiday checking of lowering section W W FCCL/DVPL-II/81181/ML/JP/11 5 Checking of proper lowering equipments W RM 6 Lowering into the Trench W W 8 Lowering of optical fiber cable/ HDPE Duct W RM LEGENDS: "A" : APPROVAL "HP": HOLD POINT "W": WITNESS INSPECTION "RM": RANDOM INSPECTION "R": REVIEW OF DOCUMENTS 1 05.11.09 N.KUMAR A.K.KABI 0 13.10.09 Review & Approval Rev. Date Description DOCUMENT NO. FCCL/DVPL- II/81181/ML/ITP/11 REV. No. 01, Appendix 1 CLIENT: M/S GAIL (India) Ltd CONSULTANT: M/S SUEZ TRACTEBEL ENGINEERING S.A. Verification by TE AND GAIL Documents to be submitted by FCCL Comments Incorporated for Construction Prepared by FCCL-QC Approved by FCCL-QC HEAD Reviewed byTE

12 ITP IR Lowering

  • Upload
    ntah84

  • View
    27

  • Download
    0

Embed Size (px)

DESCRIPTION

itp

Citation preview

Page 1: 12 ITP IR Lowering

FERNAS CONSTRUCTION COMPANY LTD.

DAHEJ-VIJAIPUR PIPELINE UPGRADATION PROJECT (DVPL - II)

INSPECTION TEST PLAN FOR LOWERING

Sl. No. Activities Inspection by FCCL Documents to be submitted by FCCL

1 Approval of Procedure W R / A

2 Mechanical Clearance For Lowering W HP Pipe Book

3 Prepadding of lowering section W W FCCL/DVPL-II/81181/ML/JP/11

4 Holiday checking of lowering section W W FCCL/DVPL-II/81181/ML/JP/11

5 Checking of proper lowering equipments W RM

6 Lowering into the Trench W W

8 Lowering of optical fiber cable/ HDPE Duct W RM

LEGENDS:

"A" : APPROVAL

"HP": HOLD POINT

"W": WITNESS INSPECTION

"RM": RANDOM INSPECTION

"R": REVIEW OF DOCUMENTS

1 05.11.09 N.KUMAR A.K.KABI

0 13.10.09 Review & Approval

Rev. Date Description

DOCUMENT NO. FCCL/DVPL-II/81181/ML/ITP/11

REV. No. 01, Appendix 1

CLIENT: M/S GAIL (India) Ltd CONSULTANT: M/S SUEZ TRACTEBEL ENGINEERING S.A.

Verification by TE AND GAIL

Comments Incorporated for Construction

Prepared byFCCL-QC

Approved byFCCL-QC HEAD

Reviewed byTE

Page 2: 12 ITP IR Lowering

Remarks

"W": WITNESS INSPECTION

"RM": RANDOM INSPECTION

"R": REVIEW OF DOCUMENTS

T.V.RAO

Approved by TE

Page 3: 12 ITP IR Lowering

UNIVERSAL ENERGIES LTD.

City Gas Distribution Project in NCT Delhi & NCR Region Appendix 2

INSPECTION REPORT FOR LOWERING

Spread : Report No : From : Date :To : Job No. :Weather :

Sl. NoChainage/Joint No. Section

Top Cover RemarksFrom To Length

ProgressToday Previous Cumulative

Checked & Verified By

UEL TPIA TEPL / IGL

Sign.: Sign.: Sign.:

Name: Name: Name:

Date: Date: Date:

DOC. NO. : UEL/CGDP/71127B/ML/QCP12/F01, Rev. 01

CLIENT : M/s. Indraprastha Gas Ltd.CONSULTANT : M/s. TRACTEBEL Engineering pvt. Ltd. TPIA :

Padding Required

Holiday Checking

SAMPLE

Page 4: 12 ITP IR Lowering

Appendix 2

INSPECTION REPORT FOR LOWERING

RemarksRemarks

Cumulative

Checked & Verified By

TEPL / IGL