    1/6

    LARSEN & TOUBRO LIMITEDPAGE NO.- 1 OF 6

    DATE:-05.01.2008

    MSQ UP GRADATION (EPCC 1)PROJECT REV.NO.- 01

    PROCEDURE FOR COATING ANDWRAPPING OF UNDERGROUND CARBON

    STEEL PIPELINES.

    PROCEDURE NO.-LT/MSQ/P/UG/CW/012

    CONTENTS

    1) PURPOESE

    2) REFERENCE DOCUMENTS

    3) MATERIALS

    4) PROCEDURE

    5) INSPECTION

    6) REPAIR7) MACHINE LIMITATION

    8) HANDLING OF COATED PIPES

    9) SAFETY PRECAUTIONS

    APPROVED BY L & T REVIEWED / APPROVED BY JACOBS

  • 7/30/2019 12 Procedure for Coating Wrapping Rev 01

    2/6

    LARSEN & TOUBRO LIMITEDPAGE NO.- 2 OF 6

    DATE:-05.01.2008

    MSQ UP GRADATION (EPCC 1)PROJECT REV.NO.- 01

    PROCEDURE FOR COATING ANDWRAPPING OF UNDERGROUND CARBON

    STEEL PIPELINES.

    PROCEDURE NO.-LT/MSQ/P/UG/CW/012

    1.0 PURPOSE

    1.1. This procedure describes guidelines to carry out tape coating of UG piping at IOCL PANIPAT

    REFINERY MSQ UPGRADATION PROJECT.

    1.2. In case of conflict between this procedure and contract specification, the latter shall govern.

    2.0 REFRENCE DOCUMENTS:

    2.1. As per Jacobs spec. No. 3177-LSS-109

    2.2. AWWA C-203 Coal tar protective coating lining to steel carbon pipeline

    2.3. SSPC-SP10 steel structure Painting council, surface preparation specification

    2.4. ASTM G8 test method for cathodic disbanding of pipeline coating

    3.0 MATERIALS:

    3.1. Protective tapes and other materials brought to site shall be as per specification.

    3.2. Manufacturers test certificates shall be submitted for review prior to use.

    3.3. The primer shall be type B as specified in AWWA C-203.

    3.4. Field and laboratory test shall be carried out for each batch of primer & tape.

    3.5. Primer and tape shall be supplied by the same manufacturer.

    4.0 PROCEDURE:

    4.1. SURFACE PREPARATION:

    4.1.1. Prior to blast cleaning, all oil, grease on the pipe surface shall be thoroughly removed

    by flushing with suitable solvent as per SSPC SP-1 and wiping with clean tags.

    Degreased pipe metal surface shall be shot/grit blast cleaned to SSPC-SP-10 or Sa 2 of

    SIS-05-5900. This cleaning operation shall be followed immediately with priming by spraying /

    brush.

    APPROVED BY L & T REVIEWED / APPROVED BY JACOBS

  • 7/30/2019 12 Procedure for Coating Wrapping Rev 01

    3/6

    LARSEN & TOUBRO LIMITEDPAGE NO.- 3 OF 6

    DATE:-05.01.2008

    MSQ UP GRADATION (EPCC 1)PROJECT REV.NO.- 01

    PROCEDURE FOR COATING ANDWRAPPING OF UNDERGROUND CARBON

    STEEL PIPELINES.

    PROCEDURE NO.-LT/MSQ/P/UG/CW/012

    4.1.2. Blast cleaned surface shall be adequately scrubbed manually with stiff wire brush

    where ever blasted surface get rusted, prior to application of primer.

    4.1.3. All weld joints shall be cleaned manually with stiff wire brush/buffing wheel after

    assembly and welding, prior to priming.

    4.2. PRIMING:

    4.2.1. Immediately after girt blasting the surface shall be applied with fast drying unmodifiedpure chlorinated rubber based coal tar synthetic primer.

    4.2.2. Second coat of primer to be applied before application of coal tar enamel. The entire

    surface of pipe should be primed. No specific time gap between two coats of primer needs to

    be maintained but after the second coat of primer, the enamel coating should before the

    primer is completely hardened.

    4.3. PREPARATION OF COATING MATERIAL:

    The metal drums that shall be cropped or cut on suitable platform to prevent the enamelcoming in contact with wooden cinders, grass and other forms of contamination. The enamel

    shall be confirmed to Type-I or Type-II coal tar enamel as per AWWA C-203. The cropped out

    pieces if enamel may not Wight more then 10 kgs. The broken pieces shall be placed in a

    clean melting kettle which is made of heavy duty, MS sheet in form of closed vessel. To

    maintain uniform coverage of material required quantity of enamel is heated in the kettle with

    temperature range of 2300C to 2400C. Temperature of enamel can be checked by dipping

    thermometer in the enamel. Thermometer shall be used in heating kettle in a such way so as

    read the temperature clearly. The thermometer shall have temperature range up to 3000

    C.

    APPROVED BY L & T REVIEWED / APPROVED BY JACOBS

  • 7/30/2019 12 Procedure for Coating Wrapping Rev 01

    4/6

    LARSEN & TOUBRO LIMITEDPAGE NO.- 4 OF 6

    DATE:-05.01.2008

    MSQ UP GRADATION (EPCC 1)PROJECT REV.NO.- 01

    PROCEDURE FOR COATING ANDWRAPPING OF UNDERGROUND CARBON

    STEEL PIPELINES.

    PROCEDURE NO.-LT/MSQ/P/UG/CW/012

    4.4. MECHANICAL APPLICATION OF COATING AND WRAPPING :

    4.4.1. The pipe shall be kept rotating on a machine having circumferential and linear motions,

    while the pipes are in rotating condition, pour the hot cold enamel manually and spread

    uniformly with the help of rubber brushes.

    4.4.2. Simultaneously, one wrap of glass fibre tissue having properties as stated in Jacobs

    specification shall be applied over the molten coal tar enamel. Initially, the wrap is held with

    hand and pressed over the molten enamel. There after the revolving pipe puffs the fiber warpfrom the reel, which ensures continuous wrapping over the molten enamel with required

    overlap (i.e. 13 mm).

    4.4.3. Second coat of coal tar enamel as well as glass fiber tissue paper shall be applied as

    per above procedure.

    4.4.4. Third coat of molten coal tar enamel shall be applied next.

    Final outer wrap of impregnated fibre felt shall be applied immediately over third coat of coal

    tar enamel, similar to inner wrap application. The overlap at edges of all wrappings should be

    minimum 13 mm. the coating shall be continuous for the full length of the pipe except 200 mmat both ends of the pipes.

    Finally, carry out whit wash with Acrylic water emulsion Latex Paint Material. This application

    will be carried out manually by paintbrushes. There after the pipes is lifted by suitable

    methods and allowed to dry on wooden sleepers.

    5.0 INSPECTION:

    5.1. All stage inspection & documentation shall be carried out as per Format No. LT/MSQ/TC/020,

    Rev.00

    Profile gauge/comparator, for checking surface preparation as per SA 2 , shall be madeavailable.

    5.2. After application of tape coating, visual inspection shall be carried out for uniformity without

    any wrinkle, irregularities and overlapping width.

    APPROVED BY L & T REVIEWED / APPROVED BY JACOBS

  • 7/30/2019 12 Procedure for Coating Wrapping Rev 01

    5/6

    LARSEN & TOUBRO LIMITEDPAGE NO.- 5 OF 6

    DATE:-05.01.2008

    MSQ UP GRADATION (EPCC 1)PROJECT REV.NO.- 01

    PROCEDURE FOR COATING ANDWRAPPING OF UNDERGROUND CARBON

    STEEL PIPELINES.

    PROCEDURE NO.-LT/MSQ/P/UG/CW/012

    5.3. Thickness of the coal tar enamel coating shall be measured with the digital thickness gauge.

    Minimal acceptable thickness shall be 4.5mm.

    5.4. All coated and wrapped pipes shall be tested with the positive signalling device to indicate

    any fault, holes, breaks or conductive particles in the protective coating. The test voltage shall

    be 13 KV.

    5.5. Peel test shall be conducted at temperature from 10C to 25C per AWWA-203 methods.

    Acceptable criteria shall be as per AWWA-203.

    6.0 REPAIR:

    Wherever any holiday is observed or any defective work is found, remove the wrapping and

    coating to the required extend from those areas by using a sharp knife. Then heated enamel

    shall be applied manually over the area following the procedure described above and inner

    and outer wrap applied. Holidays test shall repeated for the portion.

    7.0MACHINE LIMITATION:

    Machine used for coating and wrapping as described above can be used from pipes from

    10 to 48 only. For pipes upto 8 and above 48 , coating and wrapping shall be done

    manually with out rotation of pipes.

    8.0 HANDLING OF COATED PIPES

    The coated pipes shall be handled at all times with equipments such as wide belt slings and

    padded skids designed to prevent damage to the coating. Bare cables, chains, hooks etc.

    shall not be permitted to come in contact with coatings. A suitable crane may be used. Coatedpipes shall be supported at two bare ends clear from ground either on kids or sand bags.

    APPROVED BY L & T REVIEWED / APPROVED BY JACOBS

  • 7/30/2019 12 Procedure for Coating Wrapping Rev 01

    6/6

    LARSEN & TOUBRO LIMITEDPAGE NO.- 6 OF 6

    DATE:-05.01.2008

    MSQ UP GRADATION (EPCC 1)PROJECT REV.NO.- 01

    PROCEDURE FOR COATING ANDWRAPPING OF UNDERGROUND CARBON

    STEEL PIPELINES.

    PROCEDURE NO.-LT/MSQ/P/UG/CW/012

    9.0SAFETY PRECAUTIONS

    9.1. Adequate and proper PPE shall be provided to persons involved in short of grit blasting work.

    9.2. Adequate and proper PPE shall be provided to persons involved in hot application of coal tar

    enamel along with the wraps.

    9.3. Proper fire fighting system shall be provided during application of primer and enamel coatsand all safety requirements shall be ensured for under ground trenching, lowering & back

    filling.

    9.4 All precaution shall be observed as per the instruction of PMC/ OWNER.