22
06/27/22 PLC Software Configuration WG - CCB 1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

Embed Size (px)

Citation preview

Page 1: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 1

PLC Software Configuration WG

•Members•Philippe Gayet•Fréderic Havart•Renaud Barillère•[Mathias Dutour]

Page 2: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 2

Outline

ObjectivesSCM Applicable ConceptsIssues and solutionsTo be doneConclusions

Page 3: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 3

Objectives

• Identify SCM Concepts applicable to PLC development

• Propose pragmatic solutions• Prepare next phase: implementation of

services

Page 4: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 4

Layout

• Purpose• Identify what is deployed• Identify the role of each component

• What it does:• Store all information about deployed PLCs

• CPU• Cards• Firmware

• Users• Operators (for maintenance)

Page 5: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 5

Asset

• Purpose• Keep trace of all physical equipment

• What it does:• Store all information about

• Purchase• Installation history• Owner

• Store information about spare parts

• Users• HW responsible persons

Page 6: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 6

Software Configuration Management: Goals

• Offer a safe place and references for project artifacts (elements)

• Provide flexibility (component management)

• Support product lines• Allow parallel work• Enable delivery control• Allow “Reload and replay”

Page 7: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 7

SCM Concepts: Overview

Deliverables Repository

Project Repository

Developer #1

Dev. Repository

Developer #3

Dev. Repository

Developer #2

Dev. Repository

Librarian

Administrator

ProgrammingConsole

Operator

Dev. PLC #3Dev. PLC

#2

Dev. PLC #1

Page 8: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 8

SCM: Development process

SCM supports all phases of the SW production:

• Development• Incremental• By several developers

• Test and Validation• Release• Deployment

Page 9: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 9

Development Repository

• Purpose• The private working directory of a given user.

• What it does:• Offer a working area for non persistent

modifications.• Offer synchronization with the Project repository

• What it does not:• Offer a shared working area• Holds several versions of a given file.

• Users:• Developers• Designers

Page 10: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 10

Project Repository

• Purpose:• Reference storage for all project artifacts

• What it does:• Offer a unique and safe repository to all project

members• Offer traceability of changes• Offer rollback solutions.

• What is does not:• Offer space for distribution of deliverables• Offer repository to operators

• Users:• Project managers• Designers• Developers

Page 11: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 11

Deliverables repository

• Purpose• A safe repository for the project deliverables

• What it does:• Offer a simple tool to allow operator to install

and re-install the PLC programs

• What it does not:• Offer help for the development nor the tests• Offer storage for the sources

• Users• Librarian• Operators

Page 12: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 12

Issues: PLC IDE specificities

• Specific purpose• Hardware configuration• Sources

• Source files accessibility• Sometime inaccessible directly• No clear structure• No clear file identity

• Siemens and Schneider IDE are not equivalent

Page 13: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 13

Issues: PLC development styles

• Usual development approach• Sources edition in the IDE• Debugging in IDE during Test and Commissioning.

• Advanced case #1• Sources edition partially outside of the IDE• Modification in the IDE• Debugging in IDE during Test and Commissioning.

• Advanced case #2• Sources edition outside of the IDE• Debugging inside of IDE• Modification outside of the IDE.

Page 14: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 14

Solutions: Asset and Layout

• CERN solutions (LHC layout DB and D7I ) adapted to PLC world• CPU, Cards, etc.• Firmware

• Can be used as such• Replacement of Excel-based tracking

• Could be used CERN-wide• It is not domain specific

Page 15: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 15

Solution: Deliverables repository

• For the documents: Web or EDMS• For the “executable” files: Web

• Store the exported project• As a unique file (Sometime large) loadable via the

IDE

• Store several versions • The one in production (For re-load)• The next one (For initial load)• The previous one (eventually) (For immediate roll

back)

• Mark these files with the tags of the SCM system

Page 16: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 16

Solution: Project repository

• For the document: • Tool: CVS• Artifacts: all sources (.doc, .fm, etc.)

• For the “sources”• Tools: CVS• Artifacts: According to IDEs, Projects, Users

• Individual files, with or without baseline or unique large project file.

• Benefits• Safe saving of sources• Tracking of changes• Identification of versions.

Page 17: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 17

Solution: Project Repository 1/3

• Principle• The sources and HW configuration are stored as

individual files• The standard CVS solution

• Pros• Fine tracking of the changes• Flexibility in the building of applications• Ease the development by several people

• Cons• Not applicable if files can not be identified• Not applicable if HW configuration can not be exported• May need a lot of manual interventions in the Dev.

Repository.

Page 18: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 18

Solution: Project Repository 2/3

• Principle• The sources are stored as individual files• The HW configuration and libraries are saved

in a base line project.

• Pros• Fine tracking of the changes.• Flexibility in the building of applications.• Ease the development by several people.

• Cons• Not applicable if files can not be identified• May need a lot of manual interventions in the

Dev. Repository.

Page 19: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 19

Solution: Project Repository 3/3

• Principle• The sources, HW configuration and libraries

are stored in a unique file

• Pros• Tracking of the changes.• A few manual operation in the Dev. Rep.• Applicable to all dev. Process and IDE.

• Cons• Not a fine tracking mechanism• Storage of large file in CVS (long access time)

Page 20: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 20

Solution: Developers repository

• Principe• A personal space to synchronize sources with Project

Rep.• The standard CVS approach and manual manipulation

• Pros• People can develop in parallel• People can develop anywhere• Can be used during test and “commissioning”• Can be used the standard way if development outside of

IDEs

• Cons• Need import/export with some of the IDEs

(IDEs do not work with files of the file system)

Page 21: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 21

Actions

• Publish policy• Mandatory use of one of the solution

• Advertise services from support groups• Push Siemens and Schneider to open their

tool to IT solutions.

Page 22: 12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]

04/21/23 PLC Software Configuration WG - CCB 22

Conclusions

Software and hardware configuration management is applicable to PLC world.

Some adaptations have been identified

PLC support groups shall;Prepare toolsHelp users to identify their best practicesInvite PLC manufacturers to open their tools