Upload
stein-bakke
View
5
Download
0
Tags:
Embed Size (px)
DESCRIPTION
bundle
Citation preview
YINSON PRODUCTION
Ghana OCTP Development Project OCTP Offshore
FPSO
A1 EX-DE 00 24.07.2015 Issued For Review LC TR JS
YP Rev.
Validity status
ENI Rev.
Date Reason for issue Prep. Checked Accepted
Yinson Production Pte. Ltd.
3 Church Street, Samsung Hub #17-05 Singapore 049483
Contract no. :
AR/PROC/2013/08/0508 Purchase order no.:
(PO issued by YP to supplier) Doc. title :
BUNDLE DRAWING FOR MP INTERSTAGE HEATER (26HA2007)
MO2
Tag No.: 26HA2007 Supplier document no._Rev. HJ-15-2185-DWG-05-02_A1
ENI document ID
Facility Subfacility Phase Disc. code Type & subtype Sequence no. ENI Rev
3514 01 B YP document number
Project no. Origin. code System code Disc. code Doc. type Sequence no. Rev Total no. of Pages
1305 - VM - 26 - R - XX - 00013 A1 2
A
9 10
B
C
D
E
F
H
9 10
G
7 84 5 621 3
A
B
C
D
7 84 5 6
E
F
G
21 3
H
GHANA OCTP DEVELOPMENT PROJECT
CLIENT DOC. NO.
VENDOR DOC. NO.
TO BE ADVISED BY CLIENT
REV.NO. DESCRIPTION PREP. BY CHK. BY APPR. BYVALIDITY
STATUS
A1 ISSUE FOR REVIEW LI CHENG THURAIN JENSON
YINSON DWG. NO. SHEET: REV:
SIZE:
SCALE:
TITLE :
PROJECT :
COMPANY : CLIENT :
1 OF 1 A1
A3
NTS
THE ORIGINAL AND ALL COPIES OF THISDRAWING TOGETHER WITH THE COPY RIGHT
THEREOF ARE THE SOLE PROPERTY OFYINSON PRODUCTION PTE LTD
VME.REV.
24.07.2015
DTAE
VENDOR :
HEATEC JIETONG PTE LTD
TO BE ADVISED BY CLIENT
HJ-15-2185-DWG-05-02
BUNDLE DRAWING FORMP SEPARATOR INTERSTAGE HEATER (26HA2007)
- -
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED. 2. ALL BOLT HOLES SHALL STRADDLE TO THE CENTRE LINE UNLESS OTHERWISE SPECIFIED. 3. ALL GASKET SEATING FACE SHALL HAVE SERRATED CONCENTRIC SURFACE FINISH. 4. B.C.D. - BOLT CIRCLE DIAMETER O.T.L. - OUTER TUBE LIMIT. WOL - WELD OVER LAY. TBA - TO BE ADVISED BY CLIENT. 5. TUBE EXPANSION SHALL START A DISTANCE OF 14mm MEASURED FROM THE TUBESHEET SURFACE. 6. WELD OVERLAY MATERIAL SHALL BE S31803.
MATERIAL LISTMARK ITEM DESCRIPTION MATERIAL QTY REMARK
1 TUBESHEET 1 AS SHOWN SA266 Gr2 (WOL) 12 TUBESHEET 2 AS SHOWN SA266 Gr2 (WOL) 13 BAFFLE PLATE AS SHOWN SA240 316/316L 24 TIE ROD 1 AS SHOWN SS316L 65 TIE ROD 2 AS SHOWN SS316L 26 TIE ROD NUT 1/2"-13 UNC SA194 Gr.8 16
7 TUBEOD=19.05,
MIN. THK=1.651, L=6000SA 789 S31803 460
8 SPACER TUBE 1OD=19.05,
THK=1.651, L=529SA213 TP316L 6
9 SPACER TUBE 2OD=19.05,
THK=1.651, L=1061SA213 TP316L 2
10 SPACER TUBE 3OD=19.05,
THK=1.651, L=522SA213 TP316L 36
11 SPACER TUBE 4OD=19.05,
THK=1.651, L=1054SA213 TP316L 16
TIE ROD
4850 FOR TIE ROD 25380 FOR TIE ROD 1
50 20TO TUBESHEET
1/2" -13UNC 1/2" -13UNC
GENERAL NOTES
CHANNEL SIDE VIEW TUBESHEET 1 SHELL SIDE VIEW
O 700BCD64
5O
582
O
750
OD O
582
O
154 154
103,1
103,1
228
228
252 252
TUBESHEET 2CHANNEL SIDE VIEW SHELL SIDE VIEW
R 10TYP
460-O19.25u0.058-1/2"-13UNC-`20
DETAIL E
O 700BCD
40
460-O19.25u0.05
582
O
645
O
750
OD O
582
O
60
6,44,8
4,8
8 (S31803 WOL)
DETAIL F
24
TUBE HOLE DETAIL
24
21
1TUBE PROTRUSION
19,05
TUBE
OD
19,25
TUBE
WAL
L TH
ICKN
ESS
REDU
CTIO
N 2%
~3%
1.5
1
0.5mm g45vCHAMFER
DETAIL H
DETAIL I
R 1,5
2020
SEE DETAIL ESEE DETAIL F
SEE DETAIL I
SEE DETAIL H
BUNDLE ASSEMBLY
5998 (TUBESHEET SURFACE TO TUBESHEET SURFACE)
765294788532 X 9=
532
VIEW A-A
0v
90v
180v
270v
10
51TUBE EXP. LENGTH
BAFFLE PLATE
105
102
226
125
40
154 154
252 252
O580
O19.5
6-O14
SEE DETAIL BDETAIL B
10
10
90°
3D VIEW
A
A 12
1
2
3
4 5
4
5
6
7
8
9
10
11
24-O25
24-O25
12
O 571OTL
611
1215
1819
2021
2021
2223
22