Ministère de l'Écologie, de l'Énergie, du Développement durable et de l'Aménagement du territoire WWW.developpement-durable.gouv.fr Flight Inspection for RNAV 1 STAR/SID and RNP APCH in France ICAO Asia-Pacific PBN Implementation Seminar 2010 Hong Kong, China, 1-2 February 2010 Florence JACOLOT & Raphaël GUILLET DSNA

14 RNAV 1 and RNP APCH flight inspection in France

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 14 RNAV 1 and RNP APCH flight inspection in France

Ministère de l'Écologie, de l'Énergie,du Développement durable et de l'Aménagement du territoire

WWW.developpement-durable.gouv.fr

Flight Inspection for RNAV 1 STAR/SID

and RNP APCH in France

ICAO Asia-Pacific PBN Implementation Seminar 2010Hong Kong, China, 1-2 February 2010

Florence JACOLOT & Raphaël GUILLET DSNA

Page 2: 14 RNAV 1 and RNP APCH flight inspection in France

22

Table of contents

�� IntroductionIntroduction

�� Applicable regulations Applicable regulations

�� RNAV 1 caseRNAV 1 case

�� RNP APCH caseRNP APCH case

�� Fleet and dedicated equipmentsFleet and dedicated equipments

�� ReportReport

Page 3: 14 RNAV 1 and RNP APCH flight inspection in France

33

Introduction

�Flight Inspection is as old as radionavigation systems exist

�Before, Flight Inspection role was to verify the compliance of the radionavigation signals with ICAO Annex 10 SARPS

�Now, with PBN implementation, Flight Inspection needs also to ensure that RNAV paths are correctly defined before publication.

Page 4: 14 RNAV 1 and RNP APCH flight inspection in France

44

Applicable regulations

�ICAO doc 8071 vol II- Manual on testing of satellite-based radio navigation systems

�Eurocontrol Guidance Material for the Flight Inspection of RNAV Procedures (2005)

�French law (Arrêté du 28 Aout 2006)« The complete procedure file shall contain :

Procedure design reportSafety study reportUser consultationFlight inspection report »

�National LPV Safety Case

Page 5: 14 RNAV 1 and RNP APCH flight inspection in France

55

RNAV 1 Case

DME/DME

FLYABILITY

RNAV

GNSS

Infrastructure

AssessmentL1 interference

Detection

Verify Way Point

Correctness /

Consistency

Assess cockpit

workload

S

E

N

S

O

R

Page 6: 14 RNAV 1 and RNP APCH flight inspection in France

66

RNP APCH Case

FLYABILITY

RNAV

GNSS

L1 interference

Detection

Verify Way Point

Correctness /

Consistency

Assess cockpit

workload

S

E

N

S

O

R

LNAV

LNAV=Lateral NAVigation

Page 7: 14 RNAV 1 and RNP APCH flight inspection in France

77

RNP APCH Case

FLYABILITY

RNAV

GNSS

L1 interference

Detection

Verify Way Point

Correctness /

Consistency

Assess cockpit

workload

S

E

N

S

O

R

LPV

LPV=Localizer Performance with Vertical guidance

+ Final Approach Segment Data Block

Page 8: 14 RNAV 1 and RNP APCH flight inspection in France

88

DME/DME Infrastructure assessment

First step :

Conduct simulation with a dedicated software in the office

Second step :A flight inspection couldbe decided to assessDME coverage

Objective : Limit the flight inspection hours

Determination of DME pairs and calculation of RNAV 1 parameters (accuracy, continuity)

Page 9: 14 RNAV 1 and RNP APCH flight inspection in France

99

GNSS L1 Interference detection

Rhode & Schwarz EB 200 Receiver.

Dedicated Software to record L1 Band.

Flight Inspection will check GNSS performances when flying the procedurebut it does not garantee that performances are always met over time.

Compliance to ICAO SARPS are ensured by ground recordings.

Page 10: 14 RNAV 1 and RNP APCH flight inspection in France

1010

RNAV Verification

� Verification on the ground :

Waypoints / Segments / Distance / Alignments are verified accordingto existing airport ground references.

� Verification during flight inspection :

Using FMS, the pilot follows all the segments of the procedure and compares both with chart and external environment

� Chart publication includes :

• the chart & the RNAV

WP coordinates…

Page 11: 14 RNAV 1 and RNP APCH flight inspection in France

1111

RNAV Verification

� For LPVprocedure, the final approach segment data block (FAS DB) needs also to bepublished

�As it is a critical data, flight inspection conducts the following tasks :

�On the ground:

Check FAS DB content (decode and check with airport references)

�During flight :

Taxi on the axis

Fly the procedure in the axe (compute TCH, angle, axis)

Fly the sector (evaluate course width)

Page 12: 14 RNAV 1 and RNP APCH flight inspection in France

1212

Flyability

IAF

IF

FAP

Normal case

Page 13: 14 RNAV 1 and RNP APCH flight inspection in France

1313

Flyability

RNAV GNSS

in Caen

Page 14: 14 RNAV 1 and RNP APCH flight inspection in France

1414

Flight Inspection fleet

Beech 200

Page 15: 14 RNAV 1 and RNP APCH flight inspection in France

1515

Flight Inspection fleet

ATR 42

Page 16: 14 RNAV 1 and RNP APCH flight inspection in France

1616

Flight Inspection fleet

�� AircraftAircraft guidance:guidance:

��For For radionavradionav systemssystems inspection, interface inspection, interface withwithpilots pilots throughthrough a a dedicateddedicated EHSI EHSI fedfed by the FIS by the FIS consoleconsole

��For RNAV For RNAV proceduresprocedures, the , the aircraftaircraft navigation navigation equipmentsequipments are are usedused (FMS or GPS)(FMS or GPS)

�� A new Sagem test A new Sagem test benchbench willwill bebe developeddeveloped for for LPV and LPV and integratedintegrated in 2010.in 2010.

Page 17: 14 RNAV 1 and RNP APCH flight inspection in France

1717

Fligh inspection report

�� One single PBN Flight Inspection template for : One single PBN Flight Inspection template for :

RNAV 1 and RNP APCH RNAV 1 and RNP APCH (LNAV, LPV and soon LNAV/VNAV)(LNAV, LPV and soon LNAV/VNAV)

Page 18: 14 RNAV 1 and RNP APCH flight inspection in France

1818

Fligh inspection report

�� One single PBN Flight Inspection template for : One single PBN Flight Inspection template for :

RNAV 1 and RNP APCH RNAV 1 and RNP APCH (LNAV, LPV and soon LNAV/VNAV)(LNAV, LPV and soon LNAV/VNAV)

Page 19: 14 RNAV 1 and RNP APCH flight inspection in France

1919

Conclusion

�� Compliance of GNSS performances to ICAO SARPS Compliance of GNSS performances to ICAO SARPS are done by ground recordingsare done by ground recordings

�� As PBN procedure rely more and more on database, As PBN procedure rely more and more on database, flight inspection is a key player for the validation.flight inspection is a key player for the validation.

�� Care should be taken for the versioning of the RNAV Care should be taken for the versioning of the RNAV information in case a change is required by the information in case a change is required by the procedure designerprocedure designer

�� With PBN implementation, the number of published With PBN implementation, the number of published procedures will increase. Flight inspection needs to find procedures will increase. Flight inspection needs to find ways to limit the number of flight hours.ways to limit the number of flight hours.

Page 20: 14 RNAV 1 and RNP APCH flight inspection in France

2020

For For anyany question, question, feelfeel free to contact :free to contact :

[email protected]@aviation--civile.gouv.frcivile.gouv.fr

More information on More information on ourour Flight Inspection ServiceFlight Inspection Service

http://www.dsnahttp://www.dsna--dti.aviationdti.aviation--civile.gouv.fr/dti/extra/dti/revuecivile.gouv.fr/dti/extra/dti/revue--technique/08/technique/08/