Click here to load reader
Upload
marian-apostolache
View
217
Download
1
Embed Size (px)
DESCRIPTION
tyigy
Citation preview
file:///tt/file_convert/563dba24550346aa9aa30ed9/document.xls document.xls
Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION
Project P11-b De Ruyter Production Platform Summary Sheet
Doc. No. 144-111-PI-CAL-0004 Rev. R3 System: SK-004
Page 1 of 1
System Description
Line numbers Connecting Equipment
12 TO 220 004 A41 Export Oil Surge Tank 220-TC-01 / N3A
12 TO 220 005 A41 Export Oil Surge Tank 220-TC-01 / N3B
12 TO 220 006 A41 Export Oil Surge Tank 220-TC-01 / N3C
16 TO 220 008 A41 Oil Fiscal Metering 901-XY-01
8 TO 220 012 A41
6; 8 TO 220 028 A41 Export Oil Surge Tank 220-TC-01 / N1
6; 8 TO 200 078 A41 Crude Oil Cooler 200-HP-03 / S2
Status Note
Design Code B 31.3
System designed for blast Partly
CII Calculation no. - blast case SK-004B-R3
CII Calculation no. - design case SK-004A-R3
Process line list Rev. C2
Material specification Rev. C3
Support locations for AFD Yes
Support loads issued AFD Partly
Flexibility approved Yes
Maximum Stresses Sustained Expansion Occasional Blast
92 (67%) 234 (78%) 113 (62%) 136 (46%)
Equipment Nozzle Loads
Tag no. Node no Approved Notes
220-TC-01 / N3A 70 Yes Vendor datasheet Doc.no. KU4 02339
220-TC-01 / N3B 2070 Yes Vendor datasheet Doc.no. KU4 02339
220-TC-01 / N3C 1070 Yes Vendor datasheet Doc.no. KU4 02339
901-XY-01 320 Yes Standard Nozzle loadings (Doc.No. 144-000-ME-SPE-0004).
220-TC-01 / N1 4040 Yes Flange assessment
200-HP-03 / S2 4560 Yes For blast no allowables exists, these are checked by combining
the loads with the other nozzles (see "NOZZLE LOADCHECK FOR
200-HP-03")