Upload
marian-apostolache
View
212
Download
0
Embed Size (px)
DESCRIPTION
fgjdd
Citation preview
04/18/2023 file:///tt/file_convert/563dba24550346aa9aa30ee5/document.xls document.xls
Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION
Project P11-b De Ruyter Production Platform Summary Sheet
Doc. No. 144-111-PI-CAL-0016 Rev. R0 System: SK-016
Page 1 of 1
System Description
Line numbers Connecting Equipment
8; 10 LG 300 003 A41 1st Stage Inlet Scrubber 300-VN-01 / N2
Comp. Skid 300-XY-01 / TP-1A
Status Note
Design Code B 31.3
System designed for blast Yes
CII Calculation no. - blast case -
CII Calculation no. - design case SK-016A-R0
Process line list Rev. C2
Material specification Rev. C3
Support locations for AFD Yes
Support loads issued AFD Yes
Support detail drawing approved Yes
Flexibility approved Yes
Maximum Stresses Sustained Expansion Occasional Blast
44 (32%) 24 (12%) 27 (15%) -
Equipment Nozzle Loads
Tag no. Node no Approved Notes
300-VN-01 / N2 20 Yes Standard Nozzle loadings (Doc.No. 144-000-ME-SPE-0004).
300-XY-01 / TP-1A 140 Yes Standard Nozzle loadings (Doc.No. 144-000-ME-SPE-0004).