Upload
marian-apostolache
View
213
Download
0
Embed Size (px)
DESCRIPTION
fddd
Citation preview
file:///tt/file_convert/563dba24550346aa9aa30ee7/document.xls document.xls
Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION
Project P11-b De Ruyter Production Platform Summary Sheet
Doc. No. 144-111-PI-CAL-0018 Rev. R0 System: SK-018
Page 1 of 1
System Description
Line numbers Connecting Equipment
4 BD 410 015 A41 MP Separator 200-VS-02 / N2
4 LG 200 045 A41
4 LG 200 020 A43
1.5 LG 200 076 A43
Status Note
Design Code B 31.3
System designed for blast Yes
CII Calculation no. - blast case SK-018B-R0
CII Calculation no. - design case SK-018A-R0
Process line list Rev. C2
Material specification Rev. C3
Support locations for AFD Yes
Support loads issued AFD Yes
Support detail drawing approved Partly
Flexibility approved Yes
Maximum Stresses Sustained Expansion Occasional Blast
92 (67%) 72 (35%) 94 (51%)
1) Blast critical only for nodes 10 - 290 and 585 - 1215.
Equipment Nozzle Loads
Tag no. Node no Approved Notes
200-VS-02 / N2 1050 Yes Standard Nozzle loadings (Doc.No. 144-000-ME-SPE-0004).
194 (80%) 1)
file:///tt/file_convert/563dba24550346aa9aa30ee7/document.xls document.xls