Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION
Project P11-b De Ruyter Production Platform Summary Sheet
Doc. No. 144-111-PI-CAL-0020 Rev. R0 System: SK-020
Page 1 of 1
System Description
Line numbers Connecting Equipment
6; 8 HM 440 001 A41 H.M. Vessel 440-VB-01 / N2
4; 6 HM 440 014 A41 Crude Oil Heater 200-HA-01 / N4
6 HM 440 017 A41 H.M. Circulating Pump 440-PC-01A
6; 8 HM 440 038 A41 H.M. Circulating Pump 440-PC-01B
Status Note
Design Code B 31.3
System designed for blast No
CII Calculation no. - blast case -
CII Calculation no. - design case SK-020A-R0
Process line list Rev. C2
Material specification Rev. C3
Support locations for AFD Yes
Support loads issued AFD Yes
Support detail drawing approved Partly
Flexibility approved Yes
Maximum Stresses Sustained Expansion Occasional Blast
67 (49%) 109 (53%) 102 (55%) 283 (95%)
Equipment Nozzle Loads
Tag no. Node no Approved Notes
440-VB-01 / N2 755 Yes Standard Nozzle loadings (Doc.No. 144-000-ME-SPE-0004).
200-HA-01 / N4 1240 Yes Standard Nozzle loadings (Doc.No. 144-000-ME-SPE-0004).
440-PC-01A 2010 Yes API-610 (2x)
440-PC-01B 1010 Yes API-610 (2x)