Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION
Project P11-b De Ruyter Production Platform Summary Sheet
Doc. No. 144-111-PI-CAL-0039 Rev. R1 System: SK-039
Page 1 of 1
System Description
Line numbers Connecting Equipment Tag no's
4" PW 200 036 A41 LP Separator 200-VS-03 / N4
Produced Water Package 530-TX-01A / TP03
Status Note
Design Code B 31.3
System designed for blast Partly From N4 / 200-VS-03 to ESV-043. Supports up to N240.
CII Calculation no. - blast case SK-039-B-R4
CII Calculation no. - design case SK-039-A-R4
Process line list Rev. C2
Material specification Rev. C3
Support locations for AFD Yes
Support loads issued AFD Yes
Support detail drawing approved Partly
Flexibility approved Yes
Maximum Stresses [ MPa]Sustained Expansion Occasional Blast
16,6 (12%) 35,4 (17,1%) 30,6 (16,7%) 86,1 (31,9%)
Equipment Nozzle Loads
Tag no. Node no Approved Notes
200-VS-03 / N4 20 Yes Standard loads, doc 144-000-ME-SPE-0004.
530-TX-01A / TP03 380 Yes Package TP - Standard loads, doc 144-000-ME-SPE-0004 are used.
0
0
NOTE: For blast case, the resultant (combined) moment is used.