file:///tt/file_convert/563dba24550346aa9aa30ef8/document.xls document.xls
Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION
Project P11-b De Ruyter Production Platform Summary Sheet
Doc. No. 144-111-PI-CAL-0057 Rev. R0 System: SK-057
Page 1 of 1
System Description
Line numbers Connecting Equipment
1.5 BD 410 030 030 GEC PRIMARY SEAL VENTS 300-XY-01A / TP8
1,5/8 BD 410 034 34
Status Note
Design Code B 31.3
System designed for blast Yes
CII Calculation no. - blast case SK-057B-R0
CII Calculation no. - design case SK-057A-R0
Process line list Rev. C2
Material specification Rev. C3
Support locations for AFD Yes
Support loads issued AFD Yes
Support detail drawing approved No
Flexibility approved Yes
Maximum Stresses Sustained Expansion Occasional Blast
26 (19%) 125 (37%) 32 (18%) 204 (68%)
Equipment Nozzle Loads
Tag no. Node no Approved Notes
300-XY-01A / TP8 10, 1010 Yes Loadings checked on flange allowable.
file:///tt/file_convert/563dba24550346aa9aa30ef8/document.xls document.xls
PIPE STRESS CALCULATION
Note
204 (68%)