Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION
Project P11-b De Ruyter Production Platform Summary Sheet
Doc. No. 144-111-PI-CAL-0072 Rev. R1 System: SK-072
Page 1 of 1
System Description
Line numbers Connecting Equipment Tag no's
4 BD 410 117 A41 Fuel Gas Package 420-XY-01/TP4
Status Note
Design Code B 31.3
System designed for blast Yes
CII Calculation no. - blast case SK-072B-R1
CII Calculation no. - design case SK-072A-R1
Process line list Rev. C2
Material specification Rev. C3
Support locations for AFD Yes
Support loads issued AFD Yes
Support detail drawing approved Partly
Flexibility approved Yes
Maximum Stresses [ MPa]Sustained Expansion Occasional Blast
34 (24,7%) 51,8 (28%) 34,6 (18,8%) 238,1 (81,5%)
Equipment Nozzle Loads
Tag no. Node no Approved Notes
420-XY-01/TP4 370 Yes (Note 1) Package TP - Standard loads, doc 144-000-ME-SPE-0004 are used.
0
0
0
NOTE: 1. The resultant (combined) forces and moments are used.