file:///tt/file_convert/563dba24550346aa9aa30f0c/document.xls document.xls
Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION
Project P11-b De Ruyter Production Platform Summary Sheet
Doc. No. 144-111-PI-CAL-0090 Rev. R2 System: SK-090
Page 1 of 1
System Description
Line numbers Connecting Equipment
6" VL 730 002 A43 Fire Pump Package 730-XY-01B / TP9
6" VL 730 012 A43
Status Note
Design Code B 31.3
System designed for blast No
CII Calculation no. - blast case -
CII Calculation no. - design case SK-090A-R2
Process line list Rev. C2
Material specification Rev. C3
Support locations for AFD Yes
Support loads issued AFD Yes
Support detail drawing approved Yes
Flexibility approved Yes
Maximum Stresses Sustained Expansion Occasional Blast
19 (24%) 22 (13%) 30 (28%) -
Equipment Nozzle Loads
Tag no. Node no Approved Notes
730-XY-01B / TP9 20 Yes Actual bellow movements are well within allowable movements.
file:///tt/file_convert/563dba24550346aa9aa30f0c/document.xls document.xls