Upload
alex-oneil
View
19
Download
0
Tags:
Embed Size (px)
Citation preview
The New Standard For Industrial Scaffolding Supply & Solutions
ATLANTIC PACIFIC EQUIPMENT
“AT-PAC”
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 2
THE AT-PAC JOURNEY
1995 1999 2002 2005 2010 2011 2012
Founded by Tom
Davis
Expands into the
Northw est Canadian market, forming AT-
PAC Scaffold Services, Inc.
Established
manufacturing relationships
in China
Acquired Wood
Buffalo Scaffolding, Inc.,
a Canadian scaffolding labor provider
Begins
operations in Australia
Expands
into the UK Market
Enters the Gulf
Coast market w ith a branch
facility in Houston, TX
New corporate
headquarters opened in Rosw ell,
GA
Management
makes strategic decision to exit
E&D labor market
Chinese
operations expanded
2014
Aw arded
its f irst major GSS project
2015
Expands
into South America
w ith operations in the
Chilean Market
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 3
The AT-PAC VISION
To become the global leader in the scaffolding supply & solutions market by providing our customer’s with “True Value” through our vertically integrated value chain.
The AT-PAC MISSION
Produce World Class Quality Products
Deliver A Reliable & Seamless Global Supply Chain
Offer A Comprehensive Suite Of Value Add Solutions
Provide Our Products & Services At Competitive Prices
Adhere To The Highest Safety & Quality Standards
THE AT-PAC VISION & MISSION
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 4
SAFETY
AT-PAC’s primary goal is to keep our people and the environments in which they work, safe and healthy. To that end, we continue to improve our policies and procedures to ensure that proper safety practices is a 24/7 commitment on everyone’s part.
QUALITY
AT-PAC is committed to delivering defect‐free products and services on schedule and on budget while maintaining compliance with applicable standards. AT-PAC has installed a Quality culture that is focused on the consistency of our processes and procedures ensuring that all of our products meet the same standard globally.
INTERCONNECTED SAFETY & QUALITY CULTURE
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 5
AT-PAC CLIENTS & PROJECTS
GLOBAL SITE SOLUTIONS
“GSS”
A DIVISION OF AT-PAC
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 7
What is GSS?
AT-PAC’s Value Add Services & Solutions Division
The GSS VISION
To fundamentally change the way that scaffolding is executed, managed, and perceived in the large industrial construction & maintenance space.
The GSS SOLUTION
Our proprietary and exclusive GSS Scaffolding Solution wasbuilt on an unique & disruptive Execution Philosophyunderpinned by an efficient Management Process andstreamlined by a customized Software System.
GLOBAL SITE SOLUTIONS “GSS”
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 8
AT-PAC’s unique & disruptive execution philosophy can beused with either a self-perform or sub-contract laborstrategy for scaffolding and is based on our Core Fourmanagement principles:
These Core Four management principles drive ourmanagement process and software which will change theway that scaffolding is managed, executed and perceivedon large industrial projects around the globe.
GSS EXECUTION PHILOSOPHY
LEVERAGE - CONTROL - ACCOUNTABILITY - VISIBILITY
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 9
PRINCIPLE 1 | LEVERAGE
LEVERAGE
Typically the scaffold labor & supply is consolidated intoone scaffolding subcontract. By separating the scaffoldsupply from the labor, the LEVERAGE immediately shifts tothe holder of the scaffold asset allowing for bettermanagement or even removal of an underperformingscaffold subcontractor or labor crew without the financialrisk of buying out, dismantling and/or demobilizing thescaffold assets on the project.
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 10
CONTROL
By CONTROLLING the distribution and issue of the scaffolding assets on the project, the trade contractors and scaffolding labor contractors must comply with the management process in order to erect, modify, or dismantle scaffold.
PRINCIPLE 2 | CONTROL
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 11
ACCOUNTABILITY
By creating a multi-crew execution strategy for the scaffold labor creates real time benchmarking and a competitive environment on the project holding each team ACCOUNTABLE for their performance.
PRINCIPLE 3 | ACCOUNTABILITY
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 12
VISIBILITY
By implementing our custom streamlined Software System(HiVis), GSS can provide the project with VISIBILITYthrough real time KPI dashboards and data analysis. Thiscutting edge technology brings order to chaos and createstransparency project wide allowing the scaffoldmanagement team to identify inefficiencies and costsaving opportunities on the project.
PRINCIPLE 4 | VISIBILITY
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 13
LABOR PRODUCTIVITY
ASSET MANAGEMENT & UTILIZATION
HISTORICAL DATABASE & ANALYTICS
CONTROL & MITIGATE OF SCAFFOLD RISK
GSS KEY AREAS OF VALUE
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 14
The Streamlined HiVis custom software system underpins the GSS management process by giving project management the VISIBILITY to better manage and control the scaffolding work process without impacting the construction schedule thorough:
Secure web portal application
Real time electronic requisition and approval process
Tracking all scaffolding resources on the project
KPI dashboard reporting
Labor productivity
Asset utilization
“HiVis” SCAFFOLD MANAGEMENT SYSTEM
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 15
Provides real-time scaffold request and scaffold managementAccurately report daily labor and scaffolding asset productivityComprehensive scaffold asset management
The SMS is a secure web portal integrated into SharePoint
SCAFFOLD MANAGEMNT PORTAL
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 16
Six integrated software modules allow management the ability to review, approve, measure and report on all scaffolding activities throughout the duration of the project.
HiVis SMS SYSTEM MODULES
Dashboard Reporting
Scaffold Request
Management
Scaffold Requisition
Management
Scaffold Tag Management
Scaffold Material Management
Labor Management
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 17
VETTING SCAFFOLD REQUEST Reducing costs by vetting scaffold request before allocating
resources
Having scaffold request within the system allows management to vet each request against existing requests for scaffold service.
This will drastically eliminate rework and ensure scaffold request are actually in sync with the overall construction plan that reducing unnecessary scaffold builds.
COST SAVING OVERVIEW
Total Scaffolding Labor Cost X 20% = Est. Savings
Declined: Request that require additional clarifications prior to approval.
Canceled: Request that is not required and has been removed from the build queue.
Cancelled, 399 , 22%
Declined, 75 , 4%
Pending, 10 , 1%Approved, 1,330 …
Scaffold Requests Statistics
Cancelled Declined Pending Approved
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 18
LABOR COST SAVINGS PROJECTIONS
COST SAVING ADVANTAGE
Cancelled, 399 , 22%
Declined, 75 , 4%Approved,
1,330 , 74%
Scaffold Requests Statistics
Labor Calculated @ $52.00 per hour
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 19
OPTIMIZED SCAFFOLD LABORReducing costs by increased workface productivity
Through Monitoring, Measuring and Managing the total Rebuilds/Modifications and total Non-Productive hours/Downtime on a project, it is possible to optimize efficiency by as much as 30%.
Interface, 4,771 , 28%
Indirect, 1,761 , 11%
Workface, 4,931 , 29%
Safety, 5,398 , 32%
General Labor Subcategories
Interface Indirect Workface Safety
Erection, 43,362 , 56%
Modification, 13,704 , 18%
Dismantle, 4,760 , 6%
General, 15,061 , 20%
Scaffold Hours by Work Type
Erection Modification Dismantle General
Total Scaffolding Labor Cost X 10% = Est. Savings
COST SAVING OVERVIEW
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 20
LABOR COST ANALYSIS & TRENDING SUMMARY
COST SAVING ADVANTAGE
Erection56%
Modification18%
Dismantle
6%
General20%
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 21
REAL-TIME LABOR TRENDING – BUDGET / ACTUAL
Labor Forcasted Peak, 32,807 hrs.
Labor Actuals, 12,475 hrs.
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
Jul -
20
14
Au
g -
20
14
Sep
- 2
01
4
Oct
- 2
01
4
No
v -
20
14
De
c -
20
14
Jan
- 2
01
5
Feb
- 2
01
5
Mar
- 2
01
5
Ap
r -
20
15
May
- 2
01
5
Jun
- 2
01
5
Jul -
20
15
Au
g -
20
15
Sep
- 2
01
5
Oct
- 2
01
5
No
v -
20
15
De
c -
20
15
Jan
- 2
01
6
Feb
- 2
01
6
Mar
- 2
01
6
Ap
r -
20
16
May
- 2
01
6
Jun
- 2
01
6
Jul -
20
16
Au
g -
20
16
Sep
- 2
01
6
Oct
- 2
01
6
No
v -
20
16
De
c -
20
16
Jan
- 2
01
7
Feb
- 2
01
7
Mar
- 2
01
7
Ap
r -
20
17
May
- 2
01
7
Jun
- 2
01
7
Jul -
20
17
Au
g -
20
17
Sep
- 2
01
7
Oct
- 2
01
7
Scaffold Man Hours - Budget to Actual
Planned Hours Actual Hours
COST SAVING ADVANTAGE
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 22
OPTIMIZED SCAFFOLD UTILIZATIONScaffold utilizations is critical to managing the over all cost of delivering access to all trade contractors. Monitoring, Measuring and Managing the scaffold mix, location, and status allows the project to optimize the overall utilization rate of the overall fleet by as much as 30%.
Issu
ed,
26
Issu
ed,
63
Issu
ed,
117
Issu
ed,
453
Issu
ed,
299
Issu
ed,
520
Issu
ed,
441
Issu
ed,
43
5
Issu
ed,
669
Re
turn
ed
, 4
Re
turn
ed
, 3
4
Re
turn
ed
, 2
8
Re
turn
ed
, 9
0
Re
turn
ed
, 1
40
Re
turn
ed
, 1
91
Re
turn
ed
, 2
65
Re
turn
ed
, 2
18
Re
turn
ed
, 4
10
Tota
l Ho
urs
, 46
0
Tota
l Ho
urs
, 1,
165
Tota
l Ho
urs
, 2,
153
Tota
l Ho
urs
, 6,
054
Tota
l Ho
urs
, 7,
293
Tota
l Ho
urs
, 8,
07
6
Tota
l Ho
urs
, 9
,57
5
Tota
l Ho
urs
, 1
0,8
59
Tota
l Ho
urs
, 1
1,6
22
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
0
200
400
600
800
1,000
Jun
'14
Jul'1
4
Au
g'1
4
Sep
'14
Oct
'14
No
v'1
4
De
c'1
4
Jan
'15
Feb
'15
Monthly Scaffold Tons Turns & Labor Trending
COST SAVING OVERVIEW
Total Scaffolding Labor Cost X 10% = Est. Savings
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 23
5
2
13
6
3 2 3 2
7
13
18
17
3 5 3
12
28
6
18
14
2
59
3
25
15
6
0
10
20
30
40
50
60
70
Ad
just
able
Sw
ing
Gat
e
Alu
min
ium
Lad
de
r 2.
4m
/8'
Alu
min
ium
Lad
de
r 3.
6m
/12'
Bay
Bra
ce .8
8 m
/2'9
Cas
ter
8"
(H/D
Rin
g C
aste
r)
Infi
ll P
lan
k 1.
06
5m
/3'6
Lam
inat
ed P
lan
k 1.
2m
/ 4
'
Latt
ice
Gir
der
4.2
6m
/14
' - S
pig
ot
Led
ger
1.0
65m
/3'6
Led
ger
1.5
7m
/5'2
Led
ger
3.0
5m
/10
'
Scre
wja
ck/B
asej
ack
Stai
r St
rin
ger
2.1
3m/7
'
Stai
r Tr
ead
32
Stan
dar
d 1
.0m
/3'3
" (2
Rin
g)
Stan
dar
d 2
.0m
/6'6
" (4
Rin
g)
T-B
OLT
Rig
ht
An
gle
Cla
mp
2x2
Toe
Bo
ard
Cla
mp
Stee
l Pla
nk
1.5
7m
/5'2
Stee
l Pla
nk
2.1
3m
/7'
Stee
l Tu
be
w/O
UT
Fitt
ings
30
0m
m
Stee
l Tu
be
w/O
UT
Fitt
ings
12
00m
m
Stee
l Tu
be
w/O
UT
Fitt
ings
15
00m
m
Stee
l Tu
be
w/O
UT
Fitt
ings
21
00m
m
Stee
l Tu
be
w/O
UT
Fitt
ings
24
00m
m
Stee
l Tu
be
w/O
UT
Fitt
ings
30
00m
m
Out of Service Scaffold Material - (Damaged - QA/QC )
OPTIMIZED FLEET MANAGEMENTLower fleet costs by stringent product inspections and maintenance. Through Monitoring, Measuring and Managing the lost, damaged or worn equipment in real-time, our experience has shown the amount of unrepaired product can reach as much as 15% of the fleet value over the life of a project.
COST SAVING OVERVIEW
Total Scaffolding Labor Cost X 5% = Est. Savings
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 24
30
.0
20
.5
23
.7
13
.1
16
.7 18
.6 19
.8 21
.1 22
.1 23
.825
.1
29
.0
23
.5
33
.1
37
.0
37
.8
21
.7 22
.7
31
.9
38
.2
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
Jun
'14
Jul'1
4
Au
g'1
4
Sep
'14
Oct
'14
No
v'1
4
De
c'1
4
Jan
'15
Feb
'15
Mar
'15
Contractor A Contractor B Benchmark (24 Hours / Ton)
LABOR PERFORMANCE & PRODUCTIVITYBenchmarking between scaffold labor contractor is critical to identifying performance issues in the work front, it is possible to optimize efficiency by as much as 15%.
COST SAVING OVERVIEW
Total Scaffolding Labor Cost X 10% = Est. Savings
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 25
REAL-TIME PROJECT TRENDING
ISBL F'casted Usage Feb-15, 1193tons
ISBL Forecasted Max Usage Apr-16, 9113tons
ISBL Actual Usage Feb-15, 941tons
OSBL F'casted Usage Feb-15, 1652 tons
OSBL Forecasted Max Usage Dec-15, 8270tons
OSBL Actual Usage Feb-15, 837tons
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
Jul -
201
4
Au
g -
2014
Sep
- 2
014
Oct
- 2
014
No
v -
2014
Dec
- 2
01
4
Jan
- 2
015
Feb
- 2
01
5
Mar
- 2
01
5
Ap
r -
2015
May
- 2
015
Jun
- 2
015
Jul -
201
5
Au
g -
2015
Sep
- 2
015
Oct
- 2
015
No
v -
2015
Dec
- 2
01
5
Jan
- 2
016
Feb
- 2
01
6
Mar
- 2
01
6
Ap
r -
2016
May
- 2
016
Jun
- 2
016
Jul -
201
6
Au
g -
2016
Sep
- 2
016
Oct
- 2
016
No
v -
2016
Dec
- 2
01
6
Jan
- 2
017
Feb
- 2
01
7
Mar
- 2
01
7
Ap
r -
2017
May
- 2
017
Jun
- 2
017
Jul -
201
7
Au
g -
2017
Sep
- 2
017
Oct
- 2
017
Monthly Scaffold Tons - Budget / Actual by Area
ISBL Forecasted Scaffold In UseISBL Actual Scaffold In UseOSBL Forecasted Scaffold In Use
COST SAVING ADVANTAGE
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 26
OPTIMIZED TRADE EFFICENCY Through Monitoring, Measuring and Managing the status of the requested scaffolds, this allows the trade contractors to better plan and execute their work at heights thereby reducing the total trade labor cost by as much as 1%.
COST SAVING OVERVIEW
Total Scaffolding Labor Cost X .33% = Est. Savings
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 27
FACTORY DIRECT SCAFFOLD PRICING AT-PAC provides lower equipment costs by cutting the middle man
out.
By providing the equipment as a part of a total scaffolding management service, AT-PAC can offer prices that cannot be matched by our competition.
This cost differential is as high as 30% under our competitors supplying a similar product to our Ringlock System.
COST SAVING OVERVIEW
Total Scaffolding Labor Cost X 30% = Est. Savings
Copyright ©2015 Atlantic Pacific Equipment Inc. All Rights Reserved. 28
VETTING SCAFFOLD REQUESTS
COST X 20% = Est. Savings
OPTIMIZED SCAFFOLD LABOR
COST X 10% = Est. Savings
OPTIMIZED SCAFFOLD UTILIZATION
COST X 10% = Est. Savings
OPTIMIZED FLEET MANAGEMENT
COST X 5% = Est. Savings
GSS COST SAVINGS SUMMARY
LABOR PERFORMANCE & PRODUCTIVITY
COST X 10% = Est. Savings
OPTIMIZED TRADE EFFICENCY
COST X .33% = Est. Savings
FACTORY DIRECT SCAFFOLD PRICING
COST X 30% = Est. Savings
AT-PAC.COM
UNITED STATESGlobal Corporate Office: 678.505.3957
Southeast: 770.592.9663
Gulf Coast: 713.946.2123
West Coast: 951.710.6420
CANADAWestern Canada: 780.440.3099
Eastern Canada: 647.995.1515
AUSTRALIAAustralian Corporate Office,
Brisbane, and Perth
Branches: +61 8 9477 6986
UNITED KINGDOMLondon Office: 020.8310.3559
SOUTH AMERICAConcepcion Main Office:
+56 41 2135615
Antofagasta Yard Distribution