1 Beltana Development Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

Embed Size (px)

Citation preview

Page 1: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

11

Beltana DevelopmentBeltana Development

ACARP Roadway Development Operators Workshop Sept. 2007

Page 2: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

22

Beltana Hunter Valley Beltana Hunter Valley NSWNSW

Page 3: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

33

Beltana Beltana

Page 4: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

44

Blakefield SouthBlakefield South

Page 5: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

55

Blakefield SouthBlakefield South

Page 6: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

66

Beltana Update.Beltana Update.

Blakefield Update.Blakefield Update.

USA Systems Study.USA Systems Study.

Supporting a High Capacity Longwall.Supporting a High Capacity Longwall.

Beltana DevelopmentBeltana Development

Page 7: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

77

BeltanaBeltana

Total of Total of 2828 Million tonnes Million tonnes mined to date. mined to date.

Total of Total of 8080 km of roadway km of roadway driveage to date. driveage to date.

Page 8: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

88

Beltana 2007Beltana 2007

TotalTotal of of 5.55.5 Million tonnes Million tonnes mined to date. mined to date.

Total of Total of 16.516.5 km of roadway km of roadway driveage to date. driveage to date.

Page 9: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

99

Single MinerSingle Miner

MG7MG7

Cut Rate m/hrCut Rate m/hr 4.2 4.2

Metres/wkMetres/wk 340340

Belt MovesBelt Moves 17.817.8

Single Single or Super or Super

V’s Super UnitV’s Super Unit

MG8MG8 MG9MG9

4.94.9 5.65.6

389389 373373

17.6 19.917.6 19.9

Page 10: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

1010

Single MinerSingle Miner

MG7MG7Eng Avail.Eng Avail.

91.891.8

Op AvailOp Avail.. 77.6 77.6

Op Time.Op Time. 7878

Single Single or Super or Super

V’s Super UnitV’s Super Unit

MG8MG8 MG9MG9

93.893.8 8888

74.974.9 75.475.4

74.8 6774.8 67

Page 11: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

1111

Single MinerSingle Miner

MG7MG7

Pillar CyclePillar Cycle 3.6 3.6

Total MetresTotal Metres 7,4217,421

Days / PanelDays / Panel 159159

Single Single or Super or Super

V’s Super UnitV’s Super Unit

MG8MG8 MG9MG9

3.43.4 3.53.5

6,5556,555 7,0457,045

114 132114 132

Page 12: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

1212

Single Miner v’s Super UnitSingle Miner v’s Super Unit

GainsGains

– Cut RateCut Rate 112%112%

– Metres / WeekMetres / Week 125%125%

– Pillar CyclesPillar Cycles 103%103%

– Days / PanelDays / Panel 119%119%

Single or Super Single or Super

Page 13: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

1313

Single Miner v’s Super UnitSingle Miner v’s Super Unit

LossesLosses

– Maint QualityMaint Quality

– StandardsStandards

– Belt Moves / Parallel TasksBelt Moves / Parallel Tasks

– Production Maintenance.Production Maintenance.

– SustainabilitySustainability

Single or SuperSingle or Super

Page 14: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

1414

Back into Mains DriveageBack into Mains Driveage

Starting a 2nd CrewStarting a 2nd Crew

– Self HiredSelf Hired

– Integration of CrewsIntegration of Crews

Change in Development StructureChange in Development Structure

– Addition to Development Management TeamAddition to Development Management Team

– Each Crew self sufficientEach Crew self sufficient

– Maintain Single Panel Focus.Maintain Single Panel Focus.

Changes at BeltanaChanges at Beltana

Page 15: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

1515

Development atDevelopment at 340m340m per week per week

Equates to Equates to 144m144m LWLW retreat / wkretreat / wk

Equates to Equates to 165,600t165,600t / wk/ wk

6.956.95 Million Tonnes / yr Million Tonnes / yr

Single Miner What will Single Miner What will it support at Beltanait support at Beltana

Page 16: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

1616

Key Points to our StrategiesKey Points to our Strategies

– Manning.Manning.

– Standards.Standards.

– Measurement.Measurement.

– Continuous Improvement.Continuous Improvement.

– Fit for purpose equipment.Fit for purpose equipment.

– Communication.Communication.

StrategiesStrategies

Page 17: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

1717

173km173km of Driveage of Driveage

44.6 million ROM tonnes44.6 million ROM tonnes

400m Longwall Face400m Longwall Face

6.7 million Tonnes / Year6.7 million Tonnes / Year

9 year Life9 year Life

Blakefield SouthBlakefield South

Page 18: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

1818

Up to 10m3/t if insitu CH4Up to 10m3/t if insitu CH4

High High volumetric volumetric capacity ventilation capacity ventilation system maximum 580msystem maximum 580m33/sec./sec.

Force–exhaust (Force–exhaust (pressure balancedpressure balanced) ) ventilation system.ventilation system.

7 heading mains / 3 heading gate 7 heading mains / 3 heading gate roads.roads.

Blakefield SouthBlakefield South

Page 19: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

1919

Blakefield SouthBlakefield South

Page 20: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

2020

Blakefield SouthBlakefield South

Page 21: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

2121

Review Strategies for future Review Strategies for future Development systems.Development systems.

– Review 3 Hdg Gate Road Development.Review 3 Hdg Gate Road Development.

– Review Continuous Haulage.Review Continuous Haulage.

– New Technology.New Technology.

USA System StudyUSA System Study

Page 22: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

2222

Peabody HighlandPeabody Highland– FCT in Room and Pillar Operation. (High Voltage FCT in Room and Pillar Operation. (High Voltage

Miners.)Miners.)

Consol LoveridgeConsol Loveridge– 3 Hdg Development and changing from batch 3 Hdg Development and changing from batch

Haulage to FCT. (ABM’s.)Haulage to FCT. (ABM’s.)

CumberlandCumberland– 3 Hdg Development. (Miner Bolters and Mobile 3 Hdg Development. (Miner Bolters and Mobile

Bolters.)Bolters.)

Mines VisitedMines Visited

Page 23: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

2323

Twenty MileTwenty Mile– 3 Hdg Development (Place Changing.)3 Hdg Development (Place Changing.)– High Producing Mine.High Producing Mine.

San JuanSan Juan– 3 Hdg Development (place Changing.)3 Hdg Development (place Changing.)– Good Technology.Good Technology.

Joy FranklinJoy Franklin– New Technology ED miners, Automatic Drill Rigs New Technology ED miners, Automatic Drill Rigs

and FCT’s.and FCT’s.

Mines VisitedMines Visited

Page 24: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

2424

San Juan TransportSan Juan Transport

Page 25: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

2525

SpecialiseSpecialise

The Americans Specialise The Americans Specialise everything they do.everything they do.

Whether it be in Motels, Whether it be in Motels, Restaurants, Roadwork's and Coal Restaurants, Roadwork's and Coal Mining.Mining.

Page 26: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

2626

DevelopmentDevelopment

Place ChangingPlace Changing– Up to 8,200ft / mth = Up to 8,200ft / mth = 2,500m2,500m / mth / mth

Bolter MinersBolter Miners– Up to 6000ft / mth = Up to 6000ft / mth = 1830m1830m / mth / mth

FCT Operation Room and PillarFCT Operation Room and Pillar– Up to 700ft / shift = Up to 700ft / shift = 210m210m / Shift / Shift– 2121mm / hr (Approx / hr (Approx 8,500m8,500m / mth) / mth)

Page 27: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

2727

3 hdg Development3 hdg DevelopmentOpportunitiesOpportunities

Design FCT OperationDesign FCT Operation (Consol Loveridge)(Consol Loveridge)– ABM 14’sABM 14’s– Joy 4 FCT Joy 4 FCT – Auxiliary VentilationAuxiliary Ventilation

To give a 50% improvement in Gate To give a 50% improvement in Gate Road Development.Road Development.

Process Cost SavingProcess Cost Saving

Up to 9000ft / Month = Up to 9000ft / Month = 2,750m2,750m / Month / Month

Page 28: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

2828

Where we are at NowWhere we are at Now

Beltana Bolter MinerBeltana Bolter Miner– Joy 12CM12Joy 12CM12– 2 Joy 10SC32 Shuttle Cars (16t)2 Joy 10SC32 Shuttle Cars (16t)– Breaker Feeder (18t bunker capacity at Breaker Feeder (18t bunker capacity at

1700tphr)1700tphr)– Auxiliary VentilationAuxiliary Ventilation– 5.5m/hr5.5m/hr

Up to 6200ft / mth = Up to 6200ft / mth = 1888m1888m / mth / mth

Page 29: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

2929

DevelopmentDevelopment

Where does Development need to Where does Development need to be?be?

What maximum production can we What maximum production can we expect from a single Longwall? expect from a single Longwall?

Page 30: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

3030

Some FactsSome Facts

7million tonne Longwall 7million tonne Longwall (400m face at (400m face at 1740 t/m)1740 t/m)

– 2hdg Development2hdg Development 2.88m/hr 2.88m/hr – 3hdg Development3hdg Development 4.51m/hr4.51m/hr

10million tonne Longwall10million tonne Longwall– 2hdg Development2hdg Development 4.11m/hr 4.11m/hr – 3hdg Development3hdg Development 6.44m/hr6.44m/hr

Page 31: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

3131

Some FactsSome Facts

12million tonne Longwall12million tonne Longwall– 2hdg Development2hdg Development 4.93m/hr 4.93m/hr – 3hdg Development3hdg Development 7.73m/hr7.73m/hr

15million tonne Longwall15million tonne Longwall– 2hdg Development2hdg Development 6.17m/hr 6.17m/hr – 3hdg Development3hdg Development 9.67m/hr9.67m/hr

Page 32: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

3232

Low Hanging Fruit Low Hanging Fruit ObtainedObtained

Process ImprovementProcess Improvement OldOld 7.27.2 Day Pillar CycleDay Pillar Cycle

NewNew 3.63.6 Day Pillar Cycle Day Pillar Cycle

Total Process ImprovementTotal Process Improvement100 %100 %

Page 33: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

3333

FCT Model For BeltanaFCT Model For Beltana

From Data measured at Beltana a Cut Rate From Data measured at Beltana a Cut Rate after a belt move of after a belt move of 8.928.92 m/hr can be m/hr can be achieved.achieved.

Joy FCT Modelled a rateJoy FCT Modelled a rate 8.988.98 m/hr with a Joy m/hr with a Joy 12CM12D.12CM12D.

Therefore we believe an average cut rate with Therefore we believe an average cut rate with an FCT for a 100m pillar cycle would be in an FCT for a 100m pillar cycle would be in the order of the order of 8 to 9m/hr.8 to 9m/hr.

This would be a This would be a 70%70% increase in this part of increase in this part of the Process.the Process.

Page 34: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

3434

OpportunitiesOpportunities

Bolter Miners Bolter Miners – 14ED25 being built in USA to go into 14ED25 being built in USA to go into

Consol McElroy which commenced Consol McElroy which commenced production 1production 1stst May 2007. May 2007.

– ABM 25’s Used throughout QLD and NSWABM 25’s Used throughout QLD and NSW

Automated boltingAutomated bolting

Self Drilling BoltSelf Drilling Bolt

Page 35: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

3535

OpportunitiesOpportunities

Continuous Haulage SystemsContinuous Haulage Systems– Joy4FCTJoy4FCT

– Stamler Chain HaulageStamler Chain Haulage

– Prairie SystemPrairie System

– Sandvik Continuous HaulageSandvik Continuous Haulage

Page 36: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

3636

FCT StatsFCT Stats

Page 37: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

3737

SummarySummary

To Advance to the next step in To Advance to the next step in Longwall Production Development Longwall Production Development has to do something different.has to do something different.

By By 33 to to 55 years time we need to years time we need to havehave developed a new system so developed a new system so Longwall Coal is not restricted.Longwall Coal is not restricted.

Page 38: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

3838

DevelopmentDevelopment

Can’t keep doing the same and Can’t keep doing the same and expect something different.expect something different.

12 Million Tonne Longwalls being 12 Million Tonne Longwalls being supported by 500 people.supported by 500 people.

This is not sustainable.This is not sustainable.

Page 39: 16 Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007

3939

USA is BIGUSA is BIG