8
16.09.2002 Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype overview : f the prototype: investigating and developing standard DCS so ntegrating them in the TPC community ersion of the cooling prototype(IROC) was assembled in april 1-R024 s main features the cooling mechanical structure very similar inal version ol loop was consisting in monitoring the temperature and cont nput current for heater.

16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard

Embed Size (px)

Citation preview

Page 1: 16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard

16.09.2002 Alice DCS workshop S.Popescu 1

1. News from TPC DCS cooling prototype

Project overview:• Aim of the prototype: investigating and developing standard DCS solutions and integrating them in the TPC community

•1-st version of the cooling prototype(IROC) was assembled in april 2001, in 161-R024

• had as main features the cooling mechanical structure very similar to the final version

• control loop was consisting in monitoring the temperature and controlling the input current for heater.

Page 2: 16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard

16.09.2002 Alice DCS workshop S.Popescu 2

PUMP

On/OffFrigo

Heater2

Heater1

1) IROC circuit

2) Frame circuit

1)

2)

3)

3) FEC circuit

IROC

Thyr2 Thyr1

Wago PLC +I/O modules

T5

T6

PC Windows2000

WAGO I/O 32V 2.1

OPC SchneiderV2.2.1

PVSS client2.12

Operational Panel1st ver.

Eth

ernet

T1 T2

T4

T3

System set-up

Page 3: 16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard

16.09.2002 Alice DCS workshop S.Popescu 3

Control panel for 1 test set-up

Page 4: 16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard

16.09.2002 Alice DCS workshop S.Popescu 4

Page 5: 16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard

16.09.2002 Alice DCS workshop S.Popescu 5

Page 6: 16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard

16.09.2002 Alice DCS workshop S.Popescu 6

Page 7: 16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard

16.09.2002 Alice DCS workshop S.Popescu 7

In progress : Step 1 qualification of Wago PLC (in thermolab) consisting in:

-test of system stability

-test of system load (maximum nr. PID loops)

-test of time response with a maximum load

Step 2 studies of other possible solutions :ELMB (the Atlas Embedded Local Monitoring Board)The same type of tests will be performed in the next weeks

PT1000 adaptators , software + connection to sensors finished and working properly

Page 8: 16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard

16.09.2002 Alice DCS workshop S.Popescu 8

Near future:Step 3 Qualification of new electronics board (FEC),

aim control of LV full cable length Wiener PL500 + Slic.OPC + Control PanelSeptember 161-R024

Implications on control side:- test of archiving, alarms and database handling

Step 4 Test of cooling for IROC + electronics (45 FEC)October TPC laboratory

Step 5 Test for a complete control for 1 IROC:cooling, LV Wiener PS, FEC, HV Iseg PSnews : Iseg OPC sever exist and is working good