10

17 presentation waterlosses workshop cmi

Embed Size (px)

DESCRIPTION

http://beta.cmimarseille.org/sites/default/files/17_presentation_waterlosses_workshop_cmi.pdf

Citation preview

Page 1: 17 presentation waterlosses workshop cmi
Page 2: 17 presentation waterlosses workshop cmi

29,743 square kilometres

population of 3,238,000

GDP (PPP) $5,384/capita

•  Significant infrastructure, overdimensioned, aging and deteriorated. High WS coverage (over 90%) •  Abundant water sources, move to gravity fed •  Apartment buildings without system for management of common assets -> Important leaks in basements, metering issues •  Culture of water abundance, waste

Page 3: 17 presentation waterlosses workshop cmi
Page 4: 17 presentation waterlosses workshop cmi

32%

42%

21%

4% 1% 0% 5%

10% 15% 20% 25% 30% 35% 40% 45%

Significantly improved

Improved Remained the same Worsened Significantly worsened

21%

44%

29%

4% 2%

0% 5%

10% 15% 20% 25% 30% 35% 40% 45% 50%

Significantly improved

Improved Remained the same Worsened Significantly worsened

AWM

YD

Page 5: 17 presentation waterlosses workshop cmi
Page 6: 17 presentation waterlosses workshop cmi
Page 7: 17 presentation waterlosses workshop cmi

Yerevan Djur has achieved full cost recovery of O&M costs

AWSC still has to build financial sustainability, the utility is being subsidized by the national government

Page 8: 17 presentation waterlosses workshop cmi
Page 9: 17 presentation waterlosses workshop cmi
Page 10: 17 presentation waterlosses workshop cmi