Alcatel-Lucent GSM
Move BTS/Abis, Different
BSC, Different OMC-R
MPI14 / MDR2 - CCL
BTS Document
Reconfiguration Method
3BK 17430 0142 QZZZA Ed.06
Status RELEASED
Short title MPI14 / MDR2
All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel-Lucent.
BLANK PAGE BREAK
2 / 12 3BK 17430 0142 QZZZA Ed.06
Move BTS/Abis, Different BSC, Different OMC-RMPI14 / MDR2 - CCL
Identification
Customer
Country
OMC-R Site Name: Address:
Name: Address:
Alcatel-Lucent Representative (s)
Customer Representative (s)
Customer Contractor Representative (s)
Date, Time and Duration of Work Start End Duration
General Remarks from Customer General Remarks from Alcatel-Lucent
3BK 17430 0142 QZZZA Ed.06 3 / 12
Applicable DocumentsFill in the edition of the applicable documents
Document Title Document Reference Edition
Move BTS/Abis, Different BSC, Different OMC-R 3BK 17430 0142 RJZZA
BSS Methods Handbook 3BK 21268 AAAA PCZZA
BSS Configuration Handbook 3BK 21201 AAAA PCZZA
BSS Surveillance Handbook 3BK 21206 AAAA PCZZA
Network Reconfiguration Recommendations 3BK 21269 AAAA PCZZA
BSC Terminal User Guide 3BK 21220 AAAA PCZZA
BTS NEM User Guide 3BK 21228 AAAA PCZZA
Applicable ITL
InformationFill in the site data.
OMC-R Hostname
User Name
Password
4 / 12 3BK 17430 0142 QZZZA Ed.06
Cases and OptionsEnter a cross for the applicable case or option.
C1 Move BTS(s)
C1.1 New target Abis link must be created
C1.2 There are downstream BTS(s) on the source Abis link
C1.3 There will be downstream BTS(s) on the target Abis link (after move).
C2 Move a complete Abis link
C2.1Source and Target BSC are colocalized, so Abis link recabling is performed on theBSC site
C2.2Source and Target BSC are not colocalized, so Abis link recabling is performed on thefirst BTS site (chain) or on the first and last BTS sites (ring).
C3 Moved BTS supports at least one share cell
C3.1Each synchronized BTS supports at least one Main Sector and the procedure applies tothe first BTS to be moved
C3.2Each synchronized BTS supports at least one Main Sector and the procedure appliesto the second BTS to be moved
C3.3 One of synchronized BTS supports secondary sectors only.
C4 The source and target Abis links do not have the same connection type.
C5 BTS to be moved is synchronized with other BTS (no cell sharing)
C5.1 The procedure involves one BTS only or the first one of them.
C5.2 Both BTS have to be moved and the first one is already on the target OMC-R
O1 Transfer via an external support such as a diskette or a tape
O2 Transfer by ftp
O3 Delete Abis (if moved BTS was the last one on source BSC)
O4 Modify NExtra AbisTS (if HSDS is supported)
O5 Modify LAC of the moved cells
O6 Manual Transmission Programming
O7 Automatic Transmission Programming
3BK 17430 0142 QZZZA Ed.06 5 / 12
Software & Documentation VersionsFill in the appropriate INITIAL and FINAL software versions.
For BSS reshuffling methods, the INITIAL and FINAL versions are equal.For installation methods, the INITIAL version is "-".
Initial Version Final Version
OMC-R
NPA
RNO
LASER
BSS
MFS
DocumentationVersion
6 / 12 3BK 17430 0142 QZZZA Ed.06
Results Table
Fill in the Results Table according to the following rules:YES: Put a cross here if the task was performedNO: Put a cross here if the task was not performedN.A: Put a cross here if the task is not applicableS.A: Enter the number of solved anomaliesN.S.A: Enter the number of non-solved anomalies
Scenario Description
Initial Checks
YES NO N.A S.A N.S.A
Initial Checks
Performed by Site Date Start Time End Time Duration
Preparation
YES NO N.A S.A N.S.A
Prepare Backup for Reverse Procedure
C3.1, C5.1: BTS Reconfiguration
Create BTS / Abis on Target BSC
Preparing Inputs on Source and Target OMC-R
Performed by Site Date Start Time End Time Duration
3BK 17430 0142 QZZZA Ed.06 7 / 12
Switch BTS
YES NO N.A S.A N.S.A
Shut Down Cells on Source Impacted BTSs
Shut Down Cells on Target Impacted BTSs
Recable Impacted BTS
Unlock Cells on Downstream BTSs (on Source andTarget OMC-R)
Performed by Site Date Start Time End Time Duration
Set into Service Cells Belonging to Moved BTS
YES NO N.A S.A N.S.A
Inform MSC that Cells Are Moved
Unlock Cells on Moved BTS
C3.2, C5.2: BTS Reconfiguration
Performed by Site Date Start Time End Time Duration
Final Checks
YES NO N.A S.A N.S.A
Final Checks
Performed by Site Date Start Time End Time Duration
8 / 12 3BK 17430 0142 QZZZA Ed.06
Reverse Procedure
Shutdown Cell on Impacted BTSs
YES NO N.A S.A N.S.A
Shutdown Cell on Impacted BTSs
Performed by Site Date Start Time End Time Duration
Perform a Rollback Reconfiguration and Activate Backup PRCs
YES NO N.A S.A N.S.A
Perform a Rollback Reconfiguration and Activate BackupPRCs
Performed by Site Date Start Time End Time Duration
Reinsert Impacted BTS in Source BSC
YES NO N.A S.A N.S.A
Reinsert Impacted BTS in Source BSC
Performed by Site Date Start Time End Time Duration
Unlock Cells on Impacted BTSs
YES NO N.A S.A N.S.A
Unlock Cells on Impacted BTSs
Performed by Site Date Start Time End Time Duration
3BK 17430 0142 QZZZA Ed.06 9 / 12
Delete BTS on Target BSC
YES NO N.A S.A N.S.A
Delete BTS on Target BSC
Performed by Site Date Start Time End Time Duration
10 / 12 3BK 17430 0142 QZZZA Ed.06
Unavailability Duration Sheet
Fill in the unavailability duration sheet according to the following rule:Section Title Title of the paragraph where the unavailability occuredUnavailability type T for traffic interruption, R for traffic reduction, S for loss of supervision
(T,R and S could be held simultaneously)Equipment Equipment with its number (eg BTS-1)Date Date expressed as: yy/mm/ddStart time Start time expressed as: hh/mm/ssEnd time End time expressed as: hh/mm/ss
UnavailabilityType
Equipment Date Start Time End Time
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
3BK 17430 0142 QZZZA Ed.06 11 / 12
Anomaly Sheet
Fill in the unavailability duration sheet according to the following rule:Section Title Title of the paragraph where the anomaly occuredBrief description of the anomaly Summarize the anomaly (details must be in anomaly report)Anomaly report Anomaly report was sent or noSolved by Name of the technician who solved the anomaly Date of anomaly solving
Description Solved by
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
12 / 12 3BK 17430 0142 QZZZA Ed.06