19 Mai 2014

Alexandru Ghenu, Manager Proiect - Skanska Construction Romania

Page 2: 19 Mai 2014 Alexandru Ghenu, Manager Proiect - Skanska ... › 2014 › euroconstructii › tema-11.pdf · 5/18/2014 EURO Constructii 2014 - Skanska Construction Romania 10 Persoana

De ce construim ”verde”?

Verde = Bani

Verde = Valori / Principii

5/18/2014 EURO Constructii 2014 - Skanska Construction Romania

2

Page 3: 19 Mai 2014 Alexandru Ghenu, Manager Proiect - Skanska ... › 2014 › euroconstructii › tema-11.pdf · 5/18/2014 EURO Constructii 2014 - Skanska Construction Romania 10 Persoana

14/05/2013

3

3

−Net Zero Primary Energy

−Near Zero Carbon Construction

−Zero Waste

−Zero Hazardous Materials

−Zero Unsustainable Materials

−Net Zero Water / Potable Water for Construction

Colour Palette TM

– Journey to Deep Green

Energy

Carbon

Materiale

Apa

Vanilla Deep GreenGreen

−Rules

−Regulations

−Standards

−Codes

Compliance Future proofBeyond compliance

EURO-Constructii - Case Study for Green Court Bucharest

Page 4: 19 Mai 2014 Alexandru Ghenu, Manager Proiect - Skanska ... › 2014 › euroconstructii › tema-11.pdf · 5/18/2014 EURO Constructii 2014 - Skanska Construction Romania 10 Persoana

4

5/18/2014 EURO Constructii 2014 - Skanska Construction Romania

4

0 0 0 0 0Zero proiecte in pierdere

Zero incidente de mediu

Zero accidente

Zero brese de etica

Zero defecte

Cinci “Zero”

Valorile Skanska

Page 5: 19 Mai 2014 Alexandru Ghenu, Manager Proiect - Skanska ... › 2014 › euroconstructii › tema-11.pdf · 5/18/2014 EURO Constructii 2014 - Skanska Construction Romania 10 Persoana

Skanska in Romania

5/18/2014 EURO Constructii 2014 - Skanska Construction Romania

5

− Prezenta in Romania din

2011

− Doua divizii: Dezvoltare de

proiecte imobiliare si

Constructii

− Achizitionarea primului teren

in 2012

− Constructia primului proiect

a inceput in T1 2013

− Prima cladire va fi finalizata

in T4 2014

Page 6: 19 Mai 2014 Alexandru Ghenu, Manager Proiect - Skanska ... › 2014 › euroconstructii › tema-11.pdf · 5/18/2014 EURO Constructii 2014 - Skanska Construction Romania 10 Persoana

5/18/2014 EURO Constructii 2014 - Skanska Construction Romania

6

Green Court Bucharest

• Antreprenor general: Skanska

Construction Romania

• 52,000 m2 spatiu total inchiriabil

• 3 faze independente

• Livrarea primei faze: Octombrie 2014

• Pre-certificata LEED Gold

• Situat in zona Floreasca – Barbu

Vacarescu, una din cele mai

dinamice locatii din oras

Page 7: 19 Mai 2014 Alexandru Ghenu, Manager Proiect - Skanska ... › 2014 › euroconstructii › tema-11.pdf · 5/18/2014 EURO Constructii 2014 - Skanska Construction Romania 10 Persoana

7

Page 8: 19 Mai 2014 Alexandru Ghenu, Manager Proiect - Skanska ... › 2014 › euroconstructii › tema-11.pdf · 5/18/2014 EURO Constructii 2014 - Skanska Construction Romania 10 Persoana

5/18/2014 EURO Constructii 2014 - Skanska Construction Romania

8

Tehnologii verzi aplicate proiectului GCB

Fatada eficienta din punct de vedere

energetic

Sistem de iluminat eficient energetic,

echipat cu senzori de mișcare si de intensitate

Aport crescut de aer proaspat: 30% peste

standardele locale, pentru un mediu de lucru

sanatos

Materiale nepoluante

Sistem de reciclare a apelor uzate – reduce

cu peste 40% consumul total anual de apa

Panouri solare pentru preincalzirea apei

calde

Sistem de management al cladirii (BMS)Statii de incarcare pentru masinile

electrice

Page 9: 19 Mai 2014 Alexandru Ghenu, Manager Proiect - Skanska ... › 2014 › euroconstructii › tema-11.pdf · 5/18/2014 EURO Constructii 2014 - Skanska Construction Romania 10 Persoana

14/05/2013

9

9

−Net Zero Primary Energy

−Near Zero Carbon Construction

−Zero Waste

−Zero Hazardous Materials

−Zero Unsustainable Materials

−Net Zero Water / Potable Water for Construction

Colour Palette TM

– Green Court Bucharest

Energy

Carbon

Materiale

Apa

Vanilla Deep GreenGreen

−Rules

−Regulations

−Standards

−Codes

Compliance Future proofBeyond compliance

EURO-Constructii - Case Study for Green Court Bucharest

Page 10: 19 Mai 2014 Alexandru Ghenu, Manager Proiect - Skanska ... › 2014 › euroconstructii › tema-11.pdf · 5/18/2014 EURO Constructii 2014 - Skanska Construction Romania 10 Persoana

5/18/2014 EURO Constructii 2014 - Skanska Construction Romania

10

Persoana de contact:

Alexandru Ghenu

Manager Proiect

Skanska Construction Romania

Tel: +40 725 726 424

Email: [email protected]

Va multumim