Monday 23 December to Sunday 5 January Two-week Trackwork Reference Guide Line Select the line for more info Day(s) affected Special Train Notices (STN) Mobile devices must be connected via VPN Bussing View timetable WD WE No trackwork scheduled Monday 23/12 0396-19V No trackwork scheduled Thursday 26/12 - Monday 30/12 STN 2877 + STN 2880 Monday 23/12 – Sunday 5/1 Refer to the calendar on the next page Monday 23/12 – Sunday 5/1 Refer to the calendar on the next page Tuesday 24/12 – Sunday 5/1 Refer to the calendar on the next page Friday 27/12 – Friday 3/1 Refer to the calendar on the next page Monday 23/12 STN 2889 No trackwork scheduled Monday 23/12 Thursday 2/1 and Friday 3/1 0396-19V STN 0025 No trackwork scheduled Thursday 26/1 – Monday 30/1 STN 2877 + STN 2880 Wednesday 25/12 – Sunday 12/1 Refer to the calendar on the next page No trackwork scheduled Tuesday 24/12 – Sunday 5/1 Refer to the calendar on the next page No trackwork scheduled Trackwork Bussing Map Special Events extract Key: Next week’s trackwork Feedback form Click to view the bus timetable Scope of work: Various: T3, T4, SC, BM, CCN Bus timetable is not available Please use this guide to advise Sydney Metro, Sydney Trains and NSW TrainLink Intercity customers of trackwork affecting their journey. Please make this guide available to all staff at your location. Easy access alternate transport Staff should contact ROC Customer & Information on 7 7039 if alternate transport is required for customers requiring easy access transport when travelling through areas affected by trackwork.

191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

  • Upload
    others

  • View
    28

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

Monday 23 December to Sunday 5 January Two-week Trackwork Reference Guide

Line Select the line for more info

Day(s) affected

Special Train Notices (STN) Mobile devices must be connected via VPN

Bussing View timetable WD WE

No trackwork scheduled

Monday 23/12 0396-19V

No trackwork scheduled

Thursday 26/12 - Monday 30/12 STN 2877 + STN 2880

Monday 23/12 – Sunday 5/1 Refer to the calendar on the next page

Monday 23/12 – Sunday 5/1 Refer to the calendar on the next page

Tuesday 24/12 – Sunday 5/1 Refer to the calendar on the next page

Friday 27/12 – Friday 3/1 Refer to the calendar on the next page

Monday 23/12 STN 2889

No trackwork scheduled

Monday 23/12 Thursday 2/1 and Friday 3/1

0396-19V STN 0025

No trackwork scheduled

Thursday 26/1 – Monday 30/1 STN 2877 + STN 2880

Wednesday 25/12 – Sunday 12/1 Refer to the calendar on the next page

No trackwork scheduled

Tuesday 24/12 – Sunday 5/1 Refer to the calendar on the next page

No trackwork scheduled

Trackwork Bussing Map Special Events extract Key: Next week’s trackwork Feedback form Click to view the bus timetable

Scope of work: Various: T3, T4, SC, BM, CCN Bus timetable is not available

Please use this guide to advise Sydney Metro, Sydney Trains and NSW TrainLink Intercity customers of trackwork affecting their journey. Please make this guide available to all staff at your location.

Easy access alternate transport Staff should contact ROC Customer & Information on 7 7039 if alternate transport is required for customers requiring easy access transport when travelling through areas affected by trackwork.

Page 2: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

Quick summary Christmas and New Year timetables, STNs and trackwork

December 2019 – January 2020

Monday Tuesday Wednesday Thursday Friday Saturday Sunday

23 Weekday base TT

24 Weekday base TT

25 Saturday base TT

26 Saturday base TT

27 Saturday base TT

28 Saturday base TT

29 Saturday base TT

STN 2889 0396-19V

STN 2889 STN 2877 STN 2877 STN 2877 STN 2880 STN 2880

Trackwork From 9.45pm, City Circle, T2 Inner West & Leppington, T3 Bankstown and T8 Airport From 11.10pm T6 Carlingford

Major trackwork From 8pm T3 Bankstown, T4 Illawarra and South Coast

Major trackwork T3 Bankstown, T4 Illawarra and South Coast From 10pm Central Coast & Newcastle

Major trackwork T3 Bankstown, T4 Illawarra, South Coast, Central Coast & Newcastle and Blue Mountains

Major trackwork T3 Bankstown, T4 Illawarra, South Coast, Central Coast & Newcastle and Blue Mountains

Major trackwork T3 Bankstown, Central Coast & Newcastle and Blue Mountains Until 10am T4 Illawarra and South Coast

Major trackwork T3 Bankstown, Central Coast & Newcastle and Blue Mountains

Monday Tuesday Wednesday Thursday Friday Saturday Sunday

30 Saturday base TT

31 Saturday base TT + extra trains across the network for NYE

01 Sunday base TT

02 Weekday base TT

03 Weekday base TT

04 Saturday base TT

05 Sunday base TT

STN 2880

STN 2883 STN 0024 STN 0025 STN 0025 STN 0028 STN 0031

Major trackwork T3 Bankstown, Central Coast & Newcastle and Blue Mountains From 10pm T4 Illawarra, South Coast and T3 extends

Major trackwork T3 Bankstown Until 12pm Central Coast & Newcastle

Major trackwork T3 Bankstown From 12pm Central Coast & Newcastle From 10pm T4 Illawarra, South Coast and T3 extends

Major trackwork T3 Bankstown, Central Coast & Newcastle

Major trackwork T3 Bankstown, Central Coast & Newcastle From 10pm T4 Illawarra, South Coast and T3 extends

Major trackwork T3 Bankstown, Central Coast & Newcastle From 10pm T4 Illawarra, South Coast and T3 extends

Major trackwork T3 Bankstown, Central Coast & Newcastle From 10pm T4 Illawarra, South Coast and T3 extends

T3 Bankstown trackwork

T4 Illawarra trackwork

South Coast trackwork

Central Coast & Newcastle trackwork

Blue Mountains trackwork

Nightly trackwork or extension

Shaded – Business days

Please refer to the applicable STN for full details of altered train working.

Page 3: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

Trackwork Altered transport arrangements Sydney Metro, Sydney Trains and NSW TrainLink Intercity services Monday 23 December 2019 to Sunday 5 January 2020

Monday 23 December From 21:45 until 02:00 Reference: 0396-19V Work: City Outer – Turrella – Flying Junctions Trains run in one direction only, from Central first stop Museum. Some trains start and end at Central. Customers may need to change trains.

Home

02:00 Thursday 26 to 02:00 Tuesday 31 December Reference: STN 2877 + STN 2880 Work: Penrith – Valley Heights – Lithgow Buses replace trains between Emu Plains and Penrith. Trains run between Penrith and Central, some to a changed timetable. Bus route 42BM Katoomba, then all stations to Penrith and return

Suggested Station Announcements – advance warning Good morning/afternoon/evening customers, Trackwork will affect trains from Thursday 26 to Monday 30 December, with buses replacing trains between Bathurst, Lithgow and Penrith. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Suggested Station Announcements – during trackwork Good morning/afternoon/evening customers, Due to trackwork until Monday 30 December, buses replace trains between Bathurst, Lithgow and Penrith. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Home

Monday 23 December From 21:45 until 02:00 Reference: 0396-19V Work: City Outer – Turrella – Flying Jncts Trains run around the City Circle in one direction only, from Central first stop Museum. Some trains run to a changed timetable.

Home 20:00 Tuesday 24 December to 02:00 Thursday 2 January and Saturday 4 and Sunday 5 January Reference: STNs 2889, 2877, 2880, 2883, 0024, 0028, 0031 Work: Sydenham Junction Homebush trains run to a changed timetable between Liverpool and the City via Regents Park,

stopping at all stations between Liverpool and Lidcombe then running to the normal timetable between Homebush and the City.

Home Thursday 2 and Friday 3 January Reference: STN 0025 Work: Sydenham Junction Trains run as normal between Parramatta/Homebush and the City, but the following Ashfield trains

will run between Liverpool and the City via Regents Park: 758B/748E - 757F/706E - 744D/749E The following Leppington via Granville trains will instead run between Leppington and the City via

Regents Park: AM Peak - 716A and 718A PM Peak - 733H, 751K, 754W and 780B The following extra PM trains run via the City Inner, then stop Redfern, Newtown, then all stations

to Lidcombe, then all stations to Liverpool via Regents Park: - 711W 16:43 x CQ - 770Z 17:13 x CQ - 709H 17:43 x CQ - 782C 18:13 x CQ

Home

Page 4: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

Monday 23 December From 21:45 until 02:00 Reference: 0396-19V Work: City Outer – Turrella – Flying Jncts Trains run between Liverpool or Lidcombe and Sydney Terminal only. Customers may need to change trains at Central to continue their journey.

Home 20:00 Tuesday 24 December to 10:00 Saturday 28 December Reference: STNs 2889, 2877, 2880 Work: Sydenham Junction + Buses replace all trains between Campsie and Central. Trains run to a changed timetable between Campsie and the City via Lidcombe. All-stations trains also run between Liverpool and the City via Regents Park. Customers should change at Regents Park if travelling between stations Liverpool and Sefton

to stations between Birrong and Sydenham. Bus routes – Tuesday 24 to Saturday 28 December

Staff Quick Reference

Suggested Station Announcements LLPA will be scheduled to play at affected stations. The suggested announcement scripts below should be used as a guide for manual announcements. As these are general announcements for the affected line, feel free to add important local information relevant to your station.

Station Indicator Boards: Trains that run from Campsie to the City Circle via Lidcombe will display Central as the destination on the Station Indicator Boards. Please make regular stopping pattern announcements as appropriate to reassure our customers that the train will continue to stop at stations around the City Circle.

Advance warning: Good morning/afternoon/evening customers, Trackwork will affect trains from 8pm Tuesday 24 December to Sunday 5 January with buses replacing trains between Campsie and Sydenham or Central. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

From 8pm 24 to 10am 28 December: Good morning/afternoon/evening customers, Due to trackwork until 10am Saturday 28 December, buses replace all trains between Campsie and Central. From 28 December until 5 January buses replace trains between Campsie and Sydenham. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

From 10am 28 December to 5 January: Good morning/afternoon/evening customers, Due to trackwork until Sunday 5 January, buses replace all trains between Campsie and Sydenham. On some nights, buses replace trains between Campsie and Central. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Home

Page 5: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

10:00 Saturday 28 December to 02:00 Thursday 2 January Reference: STNs 2880, 2883 and 0024 Work: Sydenham Junction + Buses replace all trains between Campsie and Sydenham. T4 Illawarra Line trains run between Sydenham and the City, with some services making extra

stops at St Peters and Erskineville. Trains run to a changed timetable between Campsie and the City via Lidcombe, and between

Liverpool and the City via Regents Park. Customers should change at Regents Park if travelling between stations Liverpool and Sefton to

stations between Birrong and Sydenham.

Each night from 22:00 on Monday 30 December and Wednesday 1 January, buses replace all T3 Bankstown trains between Campsie and Central, and all T4 Illawarra Line trains between Hurstville and Central.

Home 02:00 Thursday 2 to 02:00 Saturday 4 January Reference: STN 0025 Work: Sydenham Junction + Buses replace all trains between Campsie and Sydenham. T4 Illawarra Line trains run between Sydenham and the City, with some services making extra

stops at St Peters and Erskineville. Trains run between Campsie and Lidcombe, and between Liverpool and Lidcombe via Regents Park

only. Customers may need to change at Lidcombe to continue their journey. Some morning and evening peak T2 Inner West & Leppington Line trains run between Leppington

or Liverpool and the City via Regents Park. Customers should change at Regents Park if travelling between stations Liverpool and Sefton to

stations between Birrong and Sydenham.

From 22:00 on Friday 3 January, buses replace all T3 Bankstown trains between Campsie and Central, and all T4 Illawarra Line trains between Hurstville and Central.

Home 02:00 Saturday 4 to 02:00 Monday 6 January Reference: STNs 0028 and STN 0031 Work: Sydenham Junction + Buses replace all trains between Campsie and Sydenham. T4 Illawarra Line trains run between Sydenham and the City, with some services making extra

stops at St Peters and Erskineville. Trains run to a changed timetable between Campsie and the City via Lidcombe, and between

Liverpool and the City via Regents Park. Customers should change at Regents Park if travelling between stations Liverpool and Sefton to

stations between Birrong and Sydenham.

Each night from 22:00, buses replace all T3 Bankstown trains between Campsie and Central, and all T4 Illawarra Line trains between Hurstville and Central.

Bus routes - Saturday 28 December to Sunday 5 January

* These routes run from 22:00 on 30/12, 1/1, 3/1, 4/1 and 5/1 only

Home

continued

Page 6: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

20:00 Tuesday 24 December to 10:00 Saturday 28 December Reference: STNs 2889, 2877 and 2880 Work: Sydenham Junction + Buses replace all trains between Hurstville and Central. Express buses also run between stations Waterfall, Cronulla and Sutherland direct to Central. Trains run to a changed timetable between Cronulla or Waterfall and Hurstville, and between

Central and Bondi Junction. Customers travelling to the Airport should catch route 87T4 to Wolli Creek or an express bus to

Central, then change for a T8 Airport & South Line train.

Bus routes

Suggested Station Announcements – advance warning Good morning/afternoon/evening customers, Trackwork will affect trains from 8pm Tuesday 24 to 10am Saturday 28 December, with buses replacing all trains between Hurstville and Central. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Suggested Station Announcements – from 8pm 24 to 10am 28 December Good morning/afternoon/evening customers, Due to trackwork until 10am Saturday 28 December, buses replace all trains between Hurstville and Central. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Home

10:00 Saturday 28 December to 02:00 Monday 6 January Reference: STNs 2880, 2883, 0024, 0025, 0028 and 0031 Work: Sydenham Junction + Trains run to a changed timetable, with extra trains running between Hurstville and Bondi Junction. Some trains make extra stops at St Peters and Erskineville. On some nights buses replace trains between Hurstville and Central, see below.

Home

Staff Quick Reference

Page 7: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

Monday 30 December, Wednesday 1, Friday 3, Saturday 4 and Sunday 5 January Nightly from 22:00 until 02:00 Reference: STNs 2880 and 0024 Work: Sydenham Junction + Buses replace all trains between Hurstville and Central. Trains run to a changed timetable between Cronulla, Waterfall and Hurstville, and between

Central and Bondi Junction.

Bus routes

Staff Quick Reference

Home

Friday 27 December to Friday 3 January Reference: STN 2877, 2880, 2883, 0025 Work: Some trains run to a changed timetable. Customers may need to change at Granville to continue their journey.

Home

Monday 23 December From 23:10 until 02:00 Reference: STN 2889 Work: Carlingford Clyde Buses replace trains between Carlingford and Clyde. Bus route 11T6 Clyde, then all stations to Carlingford and return

Home

Monday 23 December From 21:45 until 02:00 Reference: 0396-19V Work: City Outer – Turrella – Flying Jnctns Buses replace trains from Central to Sydenham via the Airport, in that direction only. Trains from the City run to a changed timetable via Sydenham. Trains to the City continue to run via the Airport. Bus routes 60T8 Central, Green Square, all stations to Wolli Creek, then Sydenham (one way only) 62T8 Central, Green Square and Mascot (one way only)

Home

Thursday 2 and Friday 3 January Reference: STN 0025 Work: Some trains run to a changed timetable and stopping pattern.

Home

continued

Page 8: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

02:00 Thursday 26 to 02:00 Tuesday 31 December Reference: STNs 2877 and 2880 Work: Penrith – Valley Heights – Lithgow Buses replace all trains between Bathurst, Lithgow and Penrith. Bathurst trains will be replaced by buses between Bathurst and Central. Trains run between Penrith and Central, some to a changed timetable. Bus routes

Suggested Station Announcements – advance warning Good morning/afternoon/evening customers, Trackwork will affect trains from Thursday 26 to Monday 30 December, with buses replacing trains between Bathurst, Lithgow and Penrith. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Suggested Station Announcements – during trackwork Good morning/afternoon/evening customers, Due to trackwork until Monday 30 December, buses replace trains between Bathurst, Lithgow and Penrith. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Home

Page 9: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

22:00 Wednesday 25 December to 02:00 13 January

Customer flyer

Staff Quick Reference

Suggested Station Announcements LLPA will be scheduled to play at affected stations. The suggested announcement scripts below should be used as a guide for manual announcements. As these are general announcements for the affected line, feel free to add important local information relevant to your station.

Advance warning: Good morning/afternoon/evening customers, Trackwork will affect trains from 10pm 25 December until 12 January, with buses replacing trains between Wyong and Gosford. Some trains will run on New Years Eve and New Years Day. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

From December 26: Good morning/afternoon/evening customers, Due to trackwork until Sunday 12 January, buses replace trains between Wyong and Gosford. Some trains will run on New Years Eve and New Years Day. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

From 12:00 January 1: Good morning/afternoon/evening customers, Due to trackwork until Sunday 12 January, buses replace weekday trains between Wyong and Gosford, and weekend trains between Wyong and Hornsby or Central. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Home

Page 10: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

Wednesday 25 December From 22:00 until 02:00 Reference: STN 2877 Work: Gosford Area Remodelling Buses replace trains between Wyong and Hornsby. Trains run to a changed weekend timetable between Newcastle Interchange and Wyong only. T1 North Shore and T9 Northern Line trains run between Berowra, Hornsby and the City, some to

a changed timetable. The last direct trains leave:

- Central at 20:18, arriving Newcastle Interchange at 23:14 289G - Newcastle Interchange at 19:29, arriving Central at 22:29 240G

Bus routes

These routes will run each night the trackwork extends to Hornsby: 25/12, 30/12 and 3/1

Home

02:00 Thursday 26 to 12:00 Tuesday 31 December Reference: STNs 2877, 2880 and 2883 Work: Gosford Area Remodelling Buses replace all trains between Wyong and Gosford. Express buses also run, stopping at Wyong, Tuggerah, Berowra and Hornsby. Trains run to a changed weekend timetable between Newcastle Interchange and Wyong, and

between Gosford and Central via Strathfield. On Friday, Monday and Tuesday, the following trains will run between Gosford and the City via

the T1 North Shore Line: - 06:20 Gosford to Central, arriving at 07:50 248B (Friday + Monday) 255C (Tuesday) - 16:35 Central to Gosford, arriving at 18:24 248E (On Tuesday this train extends to NI as 207E leaving Central 16:34, arriving Gosford 18:19, Newcastle Interchange at 19:39)

From 23:00 Monday until 04:00 Tuesday, buses replace trains between Wyong and Hornsby (5CN and 6CN will run).

Bus routes

NYE/NYD From 12:00 Tuesday 31 December until 12:00 Wednesday 1 January, trains run to a changed weekend based timetable between Newcastle Interchange and Central.

Home

continued

Page 11: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

12:00 Wednesday 1 to 23:30 Friday 3 January Reference: STNs 0024 and 0025 Work: Gosford Area Remodelling Buses replace all trains between Wyong and Gosford. Express buses also run, stopping at Wyong, Tuggerah, Berowra and Hornsby. Trains run to a changed timetable between Newcastle Interchange and Wyong, and between

Gosford and Central via Strathfield. Some trains leave Gosford up to 10 minutes earlier than the normal timetable.

On Thursday and Friday, trains between Gosford and the City via the T1 North Shore Line run to a reduced frequency.

Bus routes

Home

23:30 Friday 3 to 02:00 Monday 6 January Reference: STNs 0025, 0028 and 0031 Work: Gosford Area Remodelling Buses replace trains between Wyong and Hornsby. Trains run to a changed timetable between Newcastle Interchange and Wyong only. T1 North Shore and T9 Northern Line trains run between Berowra, Hornsby and the City, some to

a changed timetable.

Bus routes Friday night bus timetable

Home

02:00 Monday 6 to 02:00 Saturday 11 January Reference: STN 0032 Work: Gosford Area Remodelling Buses replace all trains between Wyong and Gosford. Express buses also run, stopping at

Wyong, Tuggerah, Berowra and Hornsby. 02:00 Saturday 11 to 02:00 Monday 13 January Reference: STN 0035 Work: Gosford Area Remodelling Buses replace trains between Wyong and Central. Buses also replace T1 North Shore Line trains between Berowra and Hornsby, and

T9 Northern Line trains between Hornsby and Strathfield. Home

continued

Page 12: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

20:00 Tuesday 24 December to 10:00 Saturday 28 December Reference: STN 2889 Work: Sydenham Junction + Buses replace trains between Waterfall and Central. Express buses also run between Wollongong, North Wollongong and Central. Trains run to a changed timetable between South Coast Line stations and Waterfall only. Trackwork also affects trains on the T4 Eastern Suburbs & Illawarra Line, trains run between

Waterfall, Cronulla and Hurstville only.

Bus routes

Staff Quick Reference

Suggested Station Announcements – advance warning Good morning/afternoon/evening customers, Trackwork will affect trains from 8pm Tuesday 24 to 10am Saturday 28 December, with buses replacing South Coast Line trains between Waterfall and Central. Buses also replace T4 Illawarra Line trains between Hurstville and Central. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Suggested Station Announcements – from 8pm 24 to 10am 28 December Good morning/afternoon/evening customers, Due to trackwork until 10am Saturday 28 December buses replace South Coast Line trains between Waterfall and Central. Buses also replace T4 Illawarra Line trains between Hurstville and Central. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Home 10:00 Saturday 28 December to 02:00 Monday 6 January Reference: STNs 2880, 2883, 0024, 0025, 0028 and 0031 Work: Sydenham Junction + Trains run between South Coast Line stations and either Bondi Junction or Sydney Terminal. On some nights buses replace trains between Hurstville and Central, see below.

Home Monday 30 December, Wednesday 1, Friday 3, Saturday 4 and Sunday 5 January Nightly from 22:00 until 02:00 Reference: STNs 0031, 0028 and 0024 Work: Sydenham Junction + Buses replace all trains between Hurstville and Central. Trains run to a changed timetable between South Coast Line stations and Hurstville only.

Bus routes

Home

Page 13: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

Special Events extract Updated Special Event details can be accessed on the Sydney Trains intranet

FROM TO WK LOCATION EVENT CROWD TRAIN PLAN Monday 23/12/19 19:15

Monday 23/12/19 21:15

25 Qudos Bank Arena, Sydney Olympic Park

National Basketball League, Sydney Kings v South East Melbourne

Crowd: 5,000 Rail: Low

No Alterations Required

Monday 23/12/19 20:00

Monday 23/12/19 22:00

25 I Darling Harbour Elton John Concert

Crowd: 9,000 Rail: Low

No Alterations Required

Thursday Thursday 25 Royal Randwick Randwick Races Crowd: 11,000 No Alterations Required 26/12/19 11:00

26/12/19 17:00

Racecourse, Randwick

Rail: 1,500

Thursday 26/12/19 13:00

Thursday 26/12/19 15:00

25 Sydney Harbour Sydney to Hobart Yacht Race

Crowd: 40,000 Rail: 1,000

No Alterations Required

Saturday 28/12/19 00:00

Saturday 28/12/19 23:00

26 Glenworth Valley Lost Paradise Festival

Crowd: 10,000 Rail: 1,000

No Alterations Required

Saturday 28/12/19 11:00

Saturday 28/12/19 18:00

26 Royal Randwick Racecourse, Randwick

Randwick Races

Crowd: 11,000 Rail: 1,500

No Alterations Required

Saturday 28/12/19 17:15

Saturday 28/12/19 19:15

26 Qudos Bank Arena, Sydney Olympic Park

National Basketball League, Sydney Kings v Perth Wildcats

Crowd: 5,000 Rail: Low

No Alterations Required

Saturday 28/12/19 19:10

Saturday 28/12/19 22:10

26 Sydney Cricket Ground, Moore Park

KFC Twenty20 Big Bash, Sydney Sixers v Sydney Thunder

Crowd: 44,000 Rail: 11,000

No Alterations Required

Saturday 28/12/19 19:30

Saturday 28/12/19 21:30

26 McDonald Jones Stadium, Broadmeadow

Hyundai A League, Newcastle Jets v Brisbane Roar

Crowd: 10,000 Rail: 300

No Alterations Required

Sunday 29/12/19 16:00

Sunday 29/12/19 18:00

26 Netstrata Jubilee Stadium, Carlton

Hyundai A League, Sydney FC v Melbourne City FC

Crowd: 15,000 Rail: 3,000

T4 ILLAWARRA LINE All UP and DOWN express Cronulla trains will make an additional stop at Carlton between 1400 and 2000 hours

Tuesday 31/12/19 19:00

Tuesday 31/12/19 21:00

26 Central Coast Stadium, Gosford

Hyundai A League, Central Coast Mariners v Perth Glory

Crowd: 10,000 Rail: 500

No Alterations Required

 

Page 14: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

New Years Eve Celebrations Saturday based timetable with extra services. 24 hour timetable will be in operation.

Crowd: 1,000,000 Rail: 400,000

T1 North Shore Line

BUMP IN: Normal services up to 14:00, increasing to 12 trains p/h until midnight. BUMP OUT: Up to 16 trains p/h on North Shore Line post-midnight; reducing to 12 trains p/h between 02:00 and 03:30, then 8 trains p/h from 03:30.

T1 Western Line

BUMP IN: Normal services up to 14:00. From 14:00 8 trains p/h on the Western Line. BUMP OUT: Up 20 trains p/h from Lower North Shore, Central and Sydney Terminal post-midnight; reducing to 16 trains p/h between 02:00 and 03:30 then to 4 trains p/h.

T2 Inner West Line

BUMP IN: 4 trains p/h until 14:00, departing Liverpool throughout entire day. BUMP OUT: 4 trains p/h from City Circle post-midnight; stopping Ashfield (4), Liverpool (4), reducing to 2 trains p/h from 03:30.

T2 Leppington Line

BUMP IN: 4 trains p/h in operation throughout entire day. BUMP OUT: 8 trains p/h from City Circle post-midnight; reducing to 2 trains p/h after 03:30.

T3 Bankstown Line

BUMP IN: 4 trains p/h in operation between Campsie and Circular Quay (via Lidcombe) throughout entire day. BUMP OUT: 4 trains p/h from City Circle to Campsie (via Lidcombe) post the midnight. This will be maintained until 05:30.

T4 Eastern Suburbs & Illawarra Line

BUMP IN: Normal services (6 p/h) with 3 extra services between Hurstville and Bondi Junction throughout entire day. BUMP OUT: 12 trains p/h from Bondi Junction post-midnight; reducing to 8 trains p/h after 0330.

T5 Cumberland Line Services operating until 14:00 only. T6 Carlingford Line 2 services p/h between 24:00 and 05:30. T7 Olympic Park Line 10 minute frequency until 22:00, then 3 trains p/h between Lidcombe and Olympic Park from 22:00-05:30. T8 Airport & South Line

BUMP IN: 4 trains p/h from Macarthur, 4 trains p/h from Revesby throughout entire day. BUMP OUT: 8 trains p/h from City Circle post-midnight; reducing to 4 p/h after 03:30.

T9 Northern Line

BUMP IN: 8 trains p/h on Northern Line until midnight. BUMP OUT: 4 trains p/h post-midnight until 03:30, departing Sydney Terminal.

Central Coast & Newcastle Line

BUMP IN: All trains arriving Sydney Terminal between 13:00 and 23:00 built up to 8 cars. BUMP OUT: All trains departing Sydney Terminal between 15:00 and 03:00 built up to 8 cars. Additional trains to Newcastle departing Sydney Terminal at 22:18, 00:18, 01:18, 02:18 and 03:18. Additional train to Wyong from Sydney Terminal at 23:18. Additional train from Newcastle to Gosford at 22:30.

Hunter Line BUMP IN: Additional services to Newcastle, departing Telarah 17:50, 18:31 and 19:31. BUMP OUT: Additional services to Telarah, departing Newcastle 21:29, 22:29, 22:59, 00:15, 01:02 and 03:15.

South Coast Line BUMP IN: Build up to 8-cars of selected afternoon services to Sydney and Kiama. BUMP OUT: Additional trains to Kiama depart Sydney Terminal at 01:04, 02:06 and 03:06. 2 supplementary bus coaches on standby at Kiama from 21:00-01:00 Additional train to Bomaderry departs Kiama at 21:30 and 23:10. Bondi Junction service to Dapto, to continue to Kiama. C092 service from Port Kembla to run as 8H service from Wollongong, stopping limited stops to Central Additional bump-out services from Wollongong to Port Kembla, departing 00:06, 00:57. Build-up 00:36 Sydney to Kiama service to 8-cars.

Blue Mountains Line BUMP IN: All trains arriving at Sydney Terminal between 08:00 and 20:00 built up to 8 cars. BUMP OUT: All trains departing Sydney Terminal between 08:00 and 03:00 built up to 8 cars. Additional trains to Lithgow and Mt Victoria depart Sydney Terminal at 00:54, 01:24 and 02:24.

Southern Highlands Line Additional Moss Vale train departs Campbelltown at 23:10.

Page 15: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

FROM TO WK LOCATION EVENT CROWD TRAIN PLAN Wednesday 01/01/20 08:30

Friday 31/01/20 20:31

26, 31

Eastern Creek Raceway

Wet’n’Wild

Shuttle bus operating every day between Blacktown Station and Eastern Creek Raceway, departing every 45 min from 8:30 until 20:30. No Alterations Required

Wednesday 01/01/20 11:00

Wednesday 01/01/20 23:00

26 The Domain, CBD Field Day Music Festival

Crowd: 30,000 Rail: 10,000

BUMP IN All Up Intercity passenger services (arriving Sydney Terminal / ESR between 0900 and 1400 hours) from Newcastle, Central Coast, South Coast and Blue Mountains regions are to be built up 8 car sets. BUMP OUT All Down Intercity passenger services (departing Sydney Terminal / ESR between 2300 and 0200 hours) to Newcastle, Central Coast, South Coast and Blue Mountains regions are to be built up to 8 car sets

Wednesday 01/01/20 11:00

Wednesday 01/01/20 18:00

26 Royal Randwick Racecourse, Randwick

Randwick Races

Crowd: 11,000 Rail: 1,500

No Alterations Required

Wednesday 01/01/20 19:30

Wednesday 01/01/20 21:30

26 Bankwest Stadium, Parramatta

Hyundai A League, Western Sydney Wanderers v Brisbane Roar FC

Crowd: 20,000 Rail: 3,500

No Alterations Required

Thursday 02/01/20 10:00

Thursday 02/01/20 18:00

26 Kembla Grange Racecourse

Kembla Grange Races

Crowd: Low Rail: Low

SOUTH COAST LINE All train services on the Up and Down will make an additional stop at Kembla Grange between 1000 and 1900 hours

Thursday 02/01/20 15:40

Thursday 02/01/20 18:40

26 Sydney Showground, Sydney Olympic Park

KFC Big Bash League, Sydney Thunder v Melbourne Stars

Crowd: 17,000 Rail: 6,000

T7 OLYMPIC PARK LINE BUILD UPS The Lidcombe to Olympic Park Sprint will be built up to 8 cars from the commencement of services STAND BY TRAINS 1 x 8 car train will be placed on stand by, fully crewed at Olympic Park Number 1 Platform between 1815 and 2115

Friday 03/01/20 10:00

Friday 03/01/20 22:00

26, 27

Tennis Centre, Sydney Olympic Park

Sydney Tennis International Day 1

Crowd: 10,000 Rail: 2,000

T7 OLYMPIC PARK LINE LIDCOMBE TO OLYMPIC PARK The Lidcombe to Olympic Park Sprint will operate every 10 minutes until 2430 hours CENTRAL TO OLYMPIC PARK H523, the empty 0858 Sydney Terminal to Flemington MC train will instead operate as a revenue service departing Sydney Terminal at 0858 stopping Strathfield and Olympic Park H223, the empty 0931 Sydney Terminal to Flemington MC train will instead operate as a revenue service departing Sydney Terminal at 0931 stopping Strathfield and Olympic Park CENTRAL TO OLYMPIC PARK 1 x 4 or 8 car train will depart Sydney Terminal at 1515 and stop Redfern, Strathfield and Olympic Park 1 x 4 or 8 car train will depart Sydney Terminal at 1615 and stop Redfern, Strathfield and Olympic Park

Friday 03/01/20 10:30

Tuesday 07/01/20 17:30

26, 27

Sydney Cricket Ground, Moore Park

International Test Cricket, Australia v New Zealand

Crowd: 35,000 per day Rail: 7,000 p/day

No Alterations Required

Page 16: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

FROM TO WK LOCATION EVENT CROWD TRAIN PLAN Saturday 04/01/20 08:00

Saturday 04/01/20 23:00

27 Clyde to Carlingford Stations

Farewell to the Carlingford Line

Crowd: Unknown Rail: Unknown

T1 WESTERN and T2 SOUTH LINES Where possible, all South and Western Line trains are to make an additional stop at Clyde on the UP and DOWN between 0800 and 2300 hours.

Saturday 04/01/20 09:00

Saturday 04/01/20 23:00

27 Tennis Centre, Sydney Olympic Park

Sydney Tennis International Day 2

Crowd: 10,000 Rail: 2,000

T7 OLYMPIC PARK LINE LIDCOMBE TO OLYMPIC PARK The Lidcombe to Olympic Park Sprint will operate every 10 minutes until 2430 hours CENTRAL TO OLYMPIC PARK 1 x 8 car set will depart Sydney Terminal at 0900 stopping at Redfern, Strathfield and Olympic Park 1 x 8 car set will depart Sydney Terminal at 0915 stopping at Redfern, Strathfield and Olympic Park OLYMPIC PARK TO CENTRAL 1 x 8 car train will depart Sydney Terminal at 1600 and stop Redfern, Strathfield and Olympic Park 1 x 8 car train will depart Sydney Terminal at 1615 and stop Redfern, Strathfield and Olympic Park

Saturday 04/01/20 11:00

Saturday 04/01/20 18:00

27 Royal Randwick Racecourse, Randwick

Randwick Races

Crowd: 11,000 Rail: 1,500

No Alterations Required

Saturday 04/01/20 11:00

Saturday 04/01/20 22:00

27 Maitland Showground, maitland

Lunar Electric Music Festival

Crowd: 7,000 Rail: 800

STAND BY TRAINS 1 x 4 car J set will be placed on standby, fully crewed at Newcastle Interchange between 1000 to 1400 hours 1 x 4 car J set will be placed on standby, fully crewed at Maitland between 2100 to 2400 hours

Saturday 04/01/20 19:30

Saturday 04/01/20 21:30

27 Netstrata Jubilee Stadium, Carlton

Hyundai A League, Sydney FC v Adelaide United

Crowd: 15,000 Rail: 3,000

T4 ILLAWARRA LINE All UP and DOWN express Cronulla trains will make an additional stop at Carlton between 1800 and 2300 hours

Saturday 04/01/20 20:00

Saturday 04/01/20 22:00

27 Qudos Bank Arena, Sydney Olympic Park

National Basketball League, Sydney Kings v Adelaide 36's

Crowd: 5,000 Rail: Low

No Alterations Required

Sunday 05/01/20 09:00

Sunday 05/01/20 23:00

27 Tennis Centre, Sydney Olympic Park

Sydney Tennis International Day 3

Crowd: 10,000 Rail: 2,000

TO OLYMPIC PARK: The Lidcombe to Olympic Park Sprint will operate every 10 minutes until 2403 hours CENTRAL TO OLYMPIC PARK: 1 x 8 car set will depart Sydney Terminal at 0900 stopping at Redfern, Strathfield and Olympic Park. 1 x 8 car set will depart Sydney Terminal at 0915 stopping at Redfern, Strathfield and Olympic Park. 1 x 8 car train will depart Sydney Terminal at 1600 and stop Redfern, Strathfield and Olympic Park. 1 x 8 car train will depart Sydney Terminal at 1615 hours and stop Redfern, Strathfield and Olympic Park.

Page 17: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

Scope of work: Christmas and New Year Closedowns

A combination of capital works programs, major periodic and routine maintenance will take place. Some of the work scheduled is as follows:

Sydenham Station and Junction - Sydenham Junction remodelling for Metro South West. - Closure and handover of Sydenham Station Platform 1 and 2 to Sydney Metro. - Slewing of Up and Down Bankstown lines to Sydenham Station platform 3 and 4. - Points, overhead wiring and signal changes to support the newly slewed track to Sydenham Station platform 3 and 4. - New crossover on city side of Sydenham from Down to Up Illawarra Local to enable new turn back functionality. - Changed entry and exit arrangements to the Sydenham Maintenance Centre (XPT Centre). - New Westrace Mark II computer based interlocking system. - ATRICS update to reflect changes. - Overhead wiring, signal and track inspections and other preventative maintenance - Corridor Presentation: vegetation maintenance and graffiti removal at various locations Gosford Area Remodelling - Slewing of the Down Main to address narrow clearance issues and current speeds - Full track reconstruction of the Up and Down Main - Overhead wiring adjustments to accommodate new track alignment and slews - Renewal of various crossovers - Full reconstruction of Down Refuge - Construction of new Perway Siding - Gosford Resignalling works - New Intercity Fleet Maintenance Facility Kangy Angy stage works - Overhead wiring, signal and track inspections and other preventative maintenance - Corridor Presentation: vegetation maintenance and graffiti removal at various locations Blue Mountains Line - Widening of Castlereagh Road by RMS - Renewal of the Castlereagh Road Rail Bridge - RMS Clarence Street Bridge Replacement - Associated rail infrastructure removal and reinstatement over the new bridge - NIF Enabling Works (various Blue Mountains locations) - Shaving tunnel walls (No.1 - 10 Zig Zag Tunnels) - Drainage works at Mount Victoria - Removal of emergency crossovers at Bell - Bridge Refurbishment of James Street UB at Lithgow - Retransoming works at Nepean River UB, Emu Plains - Cutting works at Lapstone, Glenbrook and Woodford - Bridge Renewal stage works at Lawson - Track Reconditioning at Lawson - Overhead wiring, signal and track inspections and other preventative maintenance - Corridor Presentation: vegetation maintenance and graffiti removal at various locations

Home

Page 18: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork Information Team Ph: 57 038

Next fortnight’s trackwork Sydney Metro, Sydney Trains and NSW TrainLink Intercity services Monday 6 to Sunday 12 January

Monday 6 to Thursday 9 January Nightly from 22:00 until 01:30 Trains run around the City Circle in one direction only, from Central first stop Museum.

02:00 Saturday 11 to 02:00 Monday 13 January Buses replace trains between Berowra and Hornsby.

Saturday 11 and Sunday 12 January Penrith trains make an extra stop at Burwood. Richmond trains run between Richmond and Olympic Park only. On Sunday from 06:30 until 10:30, Richmond trains run between Richmond and Granville only.

Nightly from 21:20 until 01:40, buses replace trains between Richmond and Schofields.

Wednesday 8 January Nightly from 23:00 until 01:30 Buses replace the all-stations Homebush trains between Ashfield and Strathfield. Some Leppington and Penrith trains make an extra stop at Homebush.

02:00 Saturday 11 to 02:00 Monday 13 January The Homebush trains run to a changed timetable between Ashfield and the City only. Leppington trains make extra stops at Croydon. Penrith trains make extra stops at Homebush.

Tuesday 7 and Wednesday 8 January Nightly from 23:50 until 02:00 Some trains run to a changed timetable between Richmond and Granville, and between Granville

and Leppington only.

Saturday 11 and Sunday 12 January Nightly from 21:20 until 01:40 Buses replace trains between Richmond and Schofields.

Monday 6 to Thursday 9 January Nightly from 22:00 until 01:30 Trains start and end at Central, platforms 22/23.

02:00 Saturday 11 to 02:00 Monday 13 January Buses replace trains between Hornsby and Strathfield.

Monday 6 to Friday 10 January Buses replace all trains between Wyong and Gosford.

Saturday 11 and Sunday 12 January Buses replace trains between Wyong and Central.

Sunday 12 January From 08:00 until 16:00 At Helensburgh and Otford, trains towards Wollongong leave from platform 1, not platform 2. Some trains run to a changed timetable.

Home

Page 19: 191223 Trackwork Reference Guide 23 December - …...191223 Trackwork Reference Guide 23 December - 5 January Current as of Wednesday, December 18, 2019 Produced by the CIU Trackwork

Feedback form Please use this internal feedback form to advise of any issues in regards to trackwork information advertised internally to staff or externally to our Sydney Metro, Sydney Trains and NSW TrainLink Intercity customers.

Feedback is sought in regards to trackwork signage, Special Train Notices (STN), website information, customer train or bus timetables or alternative transport arrangements.

The purpose of this trackwork debrief is to improve the service we provide to our customers during future track possessions. All staff are encouraged to complete this form when required.

Station/location: ________________________ Date: ________________________

Your name: ______________________________ Phone number: _______________

Feedback Please provide as much information as possible: - what went well, what didn't, how this affected our customers or how you feel we could improve- include STN, bus route number, bus company, trackwork poster/signage details or URL details

Please add additional pages if required.

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________