26
- - 1 1C13 COLUMN 1 1 1C13 29'-1 3/4" W10X49 A992 1 aa1 L6X6X1/2 0'-8" 1 pb4 PL1 1/4X16 1'-4" 1 ps12 PL1/2X6 0'-8" 1 ps13 PL1/2X5 1/2 0'-5 1/2" 1 px15 PL1/2X20 1'-9 3/4" SHPT ELEV. GRID LOC. 1 H.1/11.1 28'-8" NTS SCALE: MATERIAL : PAINT NOTE OPEN HOLES: WELDING ELEC : 3/4 A325 TC UNO 13/16 UNO BOLTS: E70XXLH DRAWN BY: SHEET NO. DRWG PROP: DATE: A36 - UNO CHECKED BY: S.O.- JOB NUMBER DWG NUMBER Drawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN ST 1 S/C STD PRIMER GSH FOR FABRICATION DATE REV REVISED DIA BOLT A325N_TC 3/4" 2 1/4" 4 REMARKS PRELIM # LENGTH DESCRIPTION MARK NO. TOTAL QTY SHIP'T 2 2 _ 1 2 4 _ 1 4 4 _ 1 4 _ 1 28'-0 4 _ 3 0 28'-3 4 _ 3 28'-6 4 _ 3 28'-9 4 _ 3 12'-7 2 _ 1 0 12'-10 2 _ 1 13'-1 2 _ 1 13'-4 2 _ 1 13'-8 2 _ 1 13'-11 2 _ 1 14'-2 2 _ 1 14'-5 2 _ 1 14'-8 2 _ 1 15'-5 2 _ 1 15'-8 2 _ 1 15'-11 2 _ 1 26'-10 27'-11 4 _ 1 28'-1 4 _ 3 1 2 _ 1 4 2 _ 1 1 2 _ 1 6 2 _ 1 aa1 2 2 3 3 3 3 3 3 3 3 3 3 3 3 pb4 ps12 (ON C/L) ps13 (CTR'D) 29'-3 (W10X49 x 29'-1 4 _ 3 ) 1 4 _1 29'-1 4 _ 3 EL-7 EL28'-8 4 _ 1 4 _ 1 NORTH A A 4 _ 1 4 _ 1 GA=5 2 _ 1 (BS) 2 4 _ 3 2 4 _ 3 11 16 __ _3 1'-0 8 _ 7 pb4 px15 (ON C/) 3 16 __ _ 5 16 __ _ 5 5" 16 __ _ 5 5" 6 2 _1 6 2 _1 8 8 6 2 _ 1 6 2 _ 1 8 8 4-116 __ _ 1 Ø pb4 A - A

1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1C13 COLUMN

1 1 1C13 29'-1 3/4"W10X49 A992 1 aa1 L6X6X1/2 0'-8" 1 pb4 PL1 1/4X16 1'-4" 1 ps12 PL1/2X6 0'-8" 1 ps13 PL1/2X5 1/2 0'-5 1/2" 1 px15 PL1/2X20 1'-9 3/4"

SHPT ELEV.GRID LOC. 1 H.1/11.1 28'-8"

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

WAREHOUSE/OFFICES

6028A

SWISS ARMY

7 VICTORIA DR., MONROE, CT

1C13

05/11/06 COLUMN

ST 1 S/C STD PRIMER GSH

FOR FABRICATION

DATEREV REVISED

DIA BOLTA325N_TC3/4" 2 1/4"4

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

2 2_12 4_1

4

4_1

4_1

28'-04_3

0

28'-34_3

28'-64_3

28'-94_3

12'-72_1

0

12'-102_1

13'-12_1

13'-42_1

13'-82_1

13'-112_1

14'-22_1

14'-52_1

14'-82_1

15'-52_1

15'-82_1

15'-112_1

26'-10

27'-114_1

28'-14_3

12_1 42

_1

1 2_16 2_1

aa1

2 2

33

33

33

33

3

33

3

pb4

ps12 (ON C/L)

ps13 (CTR'D)

29'-3

(W10

X49

x 2

9'-1

4_3 )

1 4_129

'-14_3

EL-

7E

L28'

-8

4_1

4_1

NORTH

A A

4_1

4_1

GA=52_1 (BS) 24

_3 24_3

1116___3

1'-08_7

pb4

px15 (ON C/)

3

16___5 16

___5 5"16___5 5"

6 2_16 2_1

88

62_1 62

_1

8 8

4-116___1 Ø

pb4

A - A

Page 2: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1B1 BEAM

1 1 1B1 28'-10 1/4"W16X31 A992 3 a3a L4X3-1/2X3/8 0'-8 1/2" 11 a24 L6X4X3/8 0'-6"

SHPT ELEV.GRID LOC. 1 19/U-R.3 12'-10"3/4

DATEREV REVISED

DIA BOLTA325N_TC3/4" 1 3/4"9 DIA BOLTA325N_TC3/4" 2"22

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

1B1

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

a24 (TYP)

A

A

12_1 12

_1

(TYP)

12

616___15

(TYP)

NO PAINT TOP FLANGEAND WITHIN 6" OF BOTH ENDS

24_1

12_1

1 16___15 1 16___15

1 16___71 16___7

GOL 24_3

HOLES-NS ONLY

a3a (FS-TYP)G0L=24

_3

(-48_7)

W16X31 x 28'-104_1

(-48_7)

15'-04_3

14'-6

2_1

16'-1

1 2_1

33

3 3

12_1

12_1

12_1

8'-04_3RD

18_7

112_10

1'-2

2_1

3'-7

2_1

3'-1

0 2_1

6'-3

2_1

6'-6

2_1

8'-1

1 2_1

9'-2

2_1

11'-7

2_1

11'-1

0 2_1

14'-3

2_1

EL1

2'-1

0 4_3

33

33

22'-04_3 28'-88

_3

17'-2

2_1

19'-7

2_1

19'-1

0 2_1

22'-3

2_1

22'-6

2_1

24'-1

1 2_1

25'-2

2_1

27'-7

2_1

27'-1

0 2_1

33

3

18_3

6

4 2 2

(16___13x12

_1)

a24 (TYP)

A - A

Page 3: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1C10 COLUMN

1 1 1C10 29'-4 3/4"W10X49 A992 1 pb4 PL1 1/4X16 1'-4" 1 pc10 PL1/2X10 1'-4" 1 pg2 PL1/2X22 7/8 2'-2 9/16" 2 pg5 PL1/2X6 1'-0"

SHPT ELEV.GRID LOC. 1 I/12 28'-11"

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

WAREHOUSE/OFFICES

6028A

SWISS ARMY

7 VICTORIA DR., MONROE, CT

1C10

05/11/06 COLUMN

ST 1 S/C STD PRIMER GSH

FOR FABRICATION

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

A A

NORTH

4_1

4_1TYP

1 2_14 2_1

pg5 (BS-ON C/L)

1'-416___11

0

13'-104_3

14'-14_3

14'-44_3

14'-74_3

27'-104_1

4_1

4_1

4_1

4_1

4_1

14_3 14

_3

5 5pc10

2 2

3

1'-016___15

33

3

pg2 (ON C/L)

29'-6

2_1 (W10

X49

x 2

9'-4

4_3 )

1 4_129

'-44_3

2_1

EL-

7E

L28'

-11 2_1

14'-02_1

0

14'-42_1

14'-82_1

13'-32_1

0

13'-62_1

13'-92_1

14'-02_1

14'-32_1

14'-62_1

15'-82_1

15'-112_1

16'-22_1

16'-52_1

28'-2

28'-5

28'-8

28'-11

29'-2

(BS)

GA=52_1 (BS) 24

_3 24_3

pg5

pg5

1016___11 1016

___11

62_1 62

_1

8 8

pc10

pb4

16___5 16

___5 5"16___5 5"

6 2_16 2_1

88

62_1 62

_1

8 8

pb4

4-116___1 Ø

A - A

Page 4: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1C6 COLUMN

1 1 1C6 30'-5 3/4"W10X39 A992 1 a20 L3-1/2X3X5/16 0'-7" 1 a21 L3-1/2X3X5/16 0'-7"

1 1 mb1 8'-7 1/8"W16X26 A992 1 pb11 PL1 1/4X14 1'-4"B/BAR 2 pm1 PL3/8X1 0'-6 7/8" 1 ps6 PL3/8X7 1/2 1'-2 7/8" 2 ps11 PL1/2X4 0'-8 13/16"

SHPT ELEV.GRID LOC. 1 I/9 30'-0"

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

WAREHOUSE/OFFICES

6028A

SWISS ARMY

7 VICTORIA DR., MONROE, CT

1C6

05/11/06 COLUMN

ST 1 S/C STD PRIMER GSH

FOR FABRICATION

DATEREV REVISED

DIA BOLTA325N_TC3/4" 2 1/4"2

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

18'-114_3

22'-54_3

28'-104_3

29'-14_3

29'-44_3

29'-74_3

29'-104_3

30'-14_3

33

33

3

A A

NORTH

4_1

4_1

4_1

4_1TYP

2 2

pb11

30'-7

(W10

X39

x 3

0'-5

4_3 )E

L-7

EL3

0'-0

1 4_130

'-54_3

13'-32_1

0

13'-62_1

13'-92_1

14'-02_1

14'-32_1

14'-62_1

17'-34_3

33

33

3

4_1

4_1

T&B

GA=52_1 (NS) 24

_3 24_3

14'-7

mb1 (ON C/L)ps6 (N0 PAINT)

ps11 (N0 PAINT)

ps11 (N0 PAINT)

KEEP

28_7

4" C/CGOL 14

_3a21 (FS)a20 (NS)

6 16___9

1 16___1

3

34 2_1

14_3

2_1

616___3 8'-58

_5

3 8_32 2_1

13'-88_1

0

14'-82_1

14'-11

33

3

3

M

30

TYP

16___5 16

___5 5"16___5 5"

5 2_15 2_1

77

62_1 62

_1

8 8

pb11

4-116___1 Ø

A - A

Page 5: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1C2 COLUMN

1 1 1C2 30'-5 3/4"W10X39 A992 5 a34 L4X4X3/8 1'-10"

1 2 mb4 2'-5 1/2"HSS10X8X.375 A500-GR.B 1 pb11 PL1 1/4X14 1'-4" 4 pc5 PL1/4X8 0'-10" 4 pt6 PL3/4X7 0'-9"

SHPT ELEV.GRID LOC. 1 I/13-13 30'-0"

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

WAREHOUSE/OFFICES

6028A

SWISS ARMY

7 VICTORIA DR., MONROE, CT

1C2

05/11/06 COLUMN

ST 1 S/C STD PRIMER GSH

FOR FABRICATION

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

104_3

84_3

0

1'-104_3

9'-114_3

12'-54_3

13'-44_3

13'-74_3

13'-104_3

14'-14_3

14'-44_3

14'-74_3

16'-104_3

17'-34_3

18'-114_3

22'-54_3

24'-114_3

27'-54_3

28'-104_3

29'-14_3

29'-44_3

29'-74_3

29'-104_3

30'-14_3

pt6 (F/S)pt6 (N/S)

pt6 (F/S)

pt6 (N/S)

C C

GA=52_1 ON C/L (TYP)

NORTH

C C

B B

A A

8

8

2 2

2mb4 (CTR'D)

mb4 (CTR'D)

a34 (TYP)

pb11

30'-7

(W10

X39

x 3

0'-5

4_3 )

1 4_1

33

310

4_33

33

33

30'-5

4_3

EL-

7E

L30'

-0

(TYP)

33

16___5 16

___5 5"16___5 5"

pb11

5 2_15 2_1

77

62_1 62

_1

8 8

4-116___1 Ø

A - A

(3"x16___13)

4_1

4_1TYP

4_1TYP

88

1111

B - B

4_1 3"

pt6 (ON C/L)

pt6 (ON C/L)

95

59

TYP

TYP

4_1TYP

mb4

1'-3

1'-3

4_11'

-24_3

1'-2

4_34_1

pc5

pc5

C - C

Page 6: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 3C11 COLUMN

3 1 3C11 29'-1 3/4"W10X49 A992 1 aa1 L6X6X1/2 0'-8" 1 aa2 L4X4X1/4 0'-7" 1 pb4 PL1 1/4X16 1'-4" 1 ps12 PL1/2X6 0'-8" 1 ps13 PL1/2X5 1/2 0'-5 1/2" 2 px15 PL1/2X20 1'-9 3/4"

SHPT ELEV.GRID LOC. 3 F.1/11.1 28'-8"

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

WAREHOUSE/OFFICES

6028A

SWISS ARMY

7 VICTORIA DR., MONROE, CT

3C11

05/11/06 COLUMN

ST 1 S/C STD PRIMER GSH

FOR FABRICATION

DATEREV REVISED

DIA BOLTA325N_TC3/4" 1 3/4"2 DIA BOLTA325N_TC3/4" 2 1/4"4

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NORTH

A A

pb4

14'-82_1

26'-10

2 2

26'-84_3

33

33

33

33

ps12(ON C/L)

ps13 (CTR'D)

aa2 (F/S)

29'-3

(W10

X49

x 2

9'-1

4_3 )

1 4_129

'-14_3

EL-

7E

L28'

-8

13'-82_1

0

13'-112_1

14'-22_1

14'-52_1

14'-12_1

0

14'-42_1

14'-7

32 2_1

4_1

4_1

4_1

4_1

2 2_12 4_1

27'-114_1

28'-14_3

4

12_1 42

_1

1 2_16 2_1

2 2_1

26'-114_3

27'-24_3

27'-54_3

27'-98_1

28'-14_3

28'-44_3

28'-74_3

28'-104_3

aa1

33

aa1

4_1

4_1TYP

GA=52_1 (BS)24

_3 24_3

1116___5

1'-08_7 1'-08

_7

px15 (ON C/L)

px15 (ON C/L)

3 3

16___5 16

___5 5"16___5 5"

88

6 2_16 2_1

4-116___1 Ø

8 8

62_1 62

_1

A - A

Page 7: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1C6 COLUMN

1 1 1C6 28'-0 3/4"W8X48 A992 1 ST2 PL3/8X4 0'-6" 1 pb1 PL3/4X14 1'-2" 1 pf3 BPL3/8X6 7/8 0'-9"

SHPT ELEV.GRID LOC. 1 9/K 36'-8"1/2

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

RETAIL & OFFICE SPACE

27001

ERIC TOWN SQUARE

120 HEBRON AVE., GLASTONBURY, CT

1C6

01/09/07 COLUMN

ST 1 S/C STD PRIMER HS

FOR FABRICATION

FOR FABRICATION 3/22/07 2FOR APPROVAL 2/7/07 1

DATEREV REVISED

DIA BOLTA325N_TC3/4" 2 1/4"3

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

3 15'-84_3

0

15'-114_3

16'-64_1

2 2

33

33

33

33

3

ST2

pf3

MRKOUTSIDE

A A

pb1

28'-1

2_1 (W8X

48 x

28'

-04_3 )

EL8

'-7E

L36'

-82_1

4_328

'-04_3

44_3

0

74_3

104_3

1'-14_3

2'-44_3

2'-74_3

2'-104_3

3'-14_3

3'-84_1

5'-44_1

8'-104_1

14'-44_3

14'-74_3

14'-104_3

15'-14_3

33

B B

3

33 16'-24

_3

16'-54_3

27'-04_3

27'-34_3

27'-64_3

27'-94_3

17'-84_1

19'-04_1

19'-44_1

20'-84_1

22'-104_1

24'-24_1

26'-114_1

27'-24_1

27'-54_1

33

3

24_3 24

_3GA=52

_1 (BS)

4_1

4_1 4"4_1 4"

77

5 2_15 2_1

52_1 52

_1

7 74-116

___1 Ø

A - A

2 8_1

12

1016___1

2

2 4_3

24_3

8_1

B - B

Page 8: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 2 1C2 COLUMN

1 2 1C2 27'-7"W10X49 A992 2 pb2 PL3/4X14 1'-4" 2 pc13 PL3/4X10 1'-1" 4 ps7 PL3/8X9 3/8 1'-4 1/4" 4 ps33 PL3/8X9 3/8 1'-2 3/8" 12 ps38 PL1 X6 0'-8 7/8"

SHPT ELEV.GRID LOC. 1 11/Q 36'-2"3/4 1 13/Q 36'-2"3/4

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

RETAIL & OFFICE SPACE

27001

ERIC TOWN SQUARE

120 HEBRON AVE., GLASTONBURY, CT

1C2

01/09/07 COLUMN

ST 1 S/C STD PRIMER HS

FOR FABRICATION

FOR FABRICATION 3/22/07 2FOR APPROVAL 2/7/07 1

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

1'-5

pc13 (NO-PAINT)

4_327

'-74_3

16___5

16___5TYP

ps38 (BS-TYP)(NO PAINT)

8_1

16___3

pb2

2

3

3'-84_1

0

5'-44_1

8'-104_1

27'-24_1

27'-54_1

27'-8

2_1 (W10

X49

x 2

7'-7

")E

L8'-7

EL3

6'-3

2_1

OUTSIDEMRK

A A

NO

PA

INT

1'-3

2 4_1

NO

PA

INT

6

4_1

4_1

4_1TYP

816___1

3 8_1

14'-44_3

14'-74_3

14'-104_3

15'-14_3

15'-34_3

26'-74_3

26'-104_3

27'-14_3

27'-44_3

ps7ps7

ps33

ps33

GA=52_1 (BS)24

_3 24_3

816___1

62_1 62

_1

KEEP

KEEP

KEEP5 4_12

33

3

44_3

0

74_3

104_3

1'-14_3

13'-112_1

26'-48_5

4_1

4_1 5"4_1 5"

6 2_16 2_1

88

52_1 52

_1

7 74-116

___1 Ø

A - A

Page 9: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

(TYP)

-- 1 6C10 COLUMN

6 1 6C10 25'-11"HSS12X12X.375 A500-GR.B 7 ST3 PL3/8X4 0'-9" 4 ST4 PL3/8X4 1'-0" 1 a21 L6X4X3/8 0'-9" 1 pb10 PL1 1/2X18 1'-6" 1 pc8 PL1/4X8 0'-8" 1 pc15 PL1 X13 1'-1" 1 ps6 PL1/2X6 0'-6"

6 1 ts2 11'-2 1/4"HSS8X8X.375 A500-GR.B

SHPT ELEV.GRID LOC. 6 5/D 36'-7"1/2

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

RETAIL & OFFICE SPACE

27001

ERIC TOWN SQUARE

120 HEBRON AVE., GLASTONBURY, CT

6C10

01/09/07 COLUMN

ST 1 S/C STD PRIMER HS

FOR FABRICATION

FOR FABRICATION 3/22/07 2FOR APPROVAL 2/7/07 1

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

21'

-46

22_1

37'-0

33

33

3

33

33

3

a21

36'-9

ST4 (TYP-UNO)

WEST

C C

16___5

16___5

B B

pc15 (CTRD)

B B

A A

1 2_137

'-24_1

4_1

4_1

4_1 12

_1 42_1

1 2_14 2_1

36'-1

36'-1

0 16___1

14'-5

0

25'-9

ST3 (BS)

ST3 (BS)

pb10

11'-2

4_125

'-11

1

EL1

0'-7

EL4

7'-1

1

NO PAINT W&E FACES

1'-0

5 4_1

NO

PA

INT

ALL

FA

CE

SN

O P

AIN

T A

LL F

AC

ES

1'-4

pc8

ps6(ON C/L)

ST3

ts2 (ON C/L)

37'-4

(HS

S12

X12

X.3

75 x

25'

-11"

)

16___5

7 2_17 2_1

99

72_1 72

_1

9 94-116

___1 Ø

A - A

4_1

4_1TYP

24_3

8_1

8_1

16___316___3

ST4

ST3

ST3

ST4

B - B

16___3

16___3

16___3

1 4_31 4_3

pc8

ST3

ST3

ST3

C - C

Page 10: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 4B51 BEAM

4 1 4B51 26'-6 1/4"W16X26 A992 8 a2a L4X3-1/2X3/8 0'-5 1/2"BNT 1 pf4 BPL1/4X6 26'-1"

SHPT ELEV.GRID LOC. 4 20-21/R-Q.3 50'-6"5/8

DATEREV REVISED

DIA BOLTA325N_TC3/4" 2 1/4"8

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

4B51

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

5'-04_3RD 10'-44

_3 15'-84_3 21'-04

_3 26'-44_1

A

A

24_1

GOL 24_3 (TYP)

1 4_1

22_1

2

22_1

1 4_1

pf4 a2a (B/S) (TYP)

EL5

0'-6

8_5

33 8_3

33

33

33

33

(-8_7)

W16X26 x 26'-64_1

(-8_7)

9 8_3

12

9 8_3

12

4_1 3"@18"

4_1 3"@18"

STGRD

316

___33 16___322

_1 22_1

pf4

A - A

Page 11: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 4B48 BEAM

4 1 4B48 21'-6 3/4"W16X26 A992

SHPT ELEV.GRID LOC. 4 18-20/R-Q.3 44'-1"

UPDATE TOP FLG HOLES 9/25/06 1DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

16021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

4B48

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

1

4'-98_7

5'-08_7

9'-98_7

10'-08_7

14'-98_7

15'-08_7

33

33

21'-42_1RD

GAGE = 24_3(N/S)E

L44'

-1

3 3

(-8_5)

W16X26 x 21'-64_3

(-8_5)

24_1

5 4_1 5 4_1

24_3 24

_3

Page 12: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

(TYP)

-- 1 4B40 BEAM

4 B2E 1 4B40 22'-5 5/16"W10X12 A992 BNT 1 pf3 PL1/4X4 21'-5"BNT 1 pf13 BPL1/4X4 1/8 21'-5" 2 ph2 PL3/8X5 1/2 0'-9 1/4" 2 ph3 PL3/8X5 1/2 0'-8 5/8"

SHPT ELEV.GRID LOC. 4 21-22/R-Q.3 50'-5"3/8

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

4B40

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

1 16___13

28_7

22'-08_3

22'-12_1RD

12

616___3

4_1

4_1 TYP

1 8_7

1 16___15

12_1

34 _1

22 _1

2 4_13 1

6___9

A

A

316___3 (NS)

316___1 (FS)316

___1316___3

12_1

416

___732 1

6___113 4_1

44_3

38_3

22'-04_1 516

___1

516___1 22'-04

_1

ph3 (FS-TYP)

ph2 (NS-TYP)

(-78_5)

W10X12 x 22'-516___5

(-38_5)

9 8_5

12

8 16___1

12

8 16___1

1228_7

9 8_5

12

14'-112_1

15'-216___11

5'-1116___9

6'-24_3

8'-416___1

8'-78_1

14'-1116___5

15'-28_3RD

ph2pf3

pf13 ph3

ph2

ph3

4_1 3"@18"

4_1 3"@18"

STGRD

12

4 16___13

12

6 4_1

1 2_1

1 2_1

22_1

28_5

4_31 16___1

pf13

pf3

A - A

ph3

1 4_13

88_512

_1

5 2_1

48_7 34

_3

74_3 12

_1

ph2

1 4_13 5 2_1

416___5 416

___15

Page 13: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 4B13 BEAM

4 B2E 1 4B13 11'-9"W8X10 A992

SHPT ELEV.GRID LOC. 4 21-22/R-Q.3 50'-6"1/2

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

4B13

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

11'-2

1 16___9

33

416___15 11'-416

___122

_1

12

98_3

6 4_11 1

6___7

1 8_1

1 16___13

2 16___5

2 4_1

316

___1

3

2 8_32 1

6___7

11'-416___1 416

___15

52_1

38_5 18

_7

18_7

(-116___15)

W8X10 x 11'-9

10

12

1 8_1

98_7

1'-08_7 18

_3

Page 14: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 4B8 BEAM

4 B2E 1 4B8 7'-7 3/8"W8X10 A992 1 pv1 L6X4X3/8 0'-6"

SHPT ELEV.GRID LOC. 4 19/R-Q.3 44'-8"13/16

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

4B8

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

12

98_3

4_1

4_1

7'-18_5

7'-316___3RD

28 _5

22 _1

5

3

7'-116___3 616

___3

2 4_3

4

3 8_3

5 8_7

114_1

74_3

416___9

GAGE = 3pv1 (CTR'D)

W8X10 x 7'-78_3

Page 15: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 2 4B6 BEAM

4 B2E 2 4B6 18'-9 15/16"W8X10 A992 4 a1a L6X6X3/8 0'-2 1/2"

SHPT ELEV.GRID LOC. 4 22-23>/Q 50'-5"9/16 4 22-23>/R 50'-5"9/16

DATEREV REVISED

DIA BOLTA325N_TC3/4" 2 1/4"2

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

4B6

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

5 2_1

18'-44_3

18'-616___13

GOL24_1-22

_1

34_1 216

___9

2 2_1

1 4_3

2 2_1

1 4_3

4 16___5

2_1

1 16___7

4

34 _1

416

___9

416

___13

1 2_1

48 _5

22 _1

18'-48_1 516

___13

58_3 18'-1 316

___9

38_7 116

___7

GAGE = 24_1

a1a (B/S)

12

8

2 16___1

3

(-54_3)

W8X10 x 18'-916___15

15'-24_3RD 16'-44

_3

54_1

Page 16: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 4B1 BEAM

4 1 4B1 29'-2 5/16"W16X31 A992 8 a2a L4X3-1/2X3/8 0'-5 1/2"BNT 1 pf1 PL1/4X6 29'-4"

SHPT ELEV.GRID LOC. 4 22/T-R 50'-6"15/16

DATEREV REVISED

DIA BOLTA325N_TC3/4" 2 1/4"8

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

4B1

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

(TYP)24_1

A

A

a2a (BS-TYP)G0L=24

_3

29'-216___5 416

___7

1 4_1

pf1

(-16___15)

29'-64_3 (W16X31 x 29'-216

___5 )

(-16___5 )

5'-78_7RD 11'-716

___1 17'-64_1 23'-52

_1 29'-016___5

2

EL5

0'-6

16___15

33

33

33

33

33

24_3

4_1 3"@18"

4_1 3"@18"

STGRD

3 322

_1 22_1

1 8_7

pf1

A - A

Page 17: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 2BR1 BRACE

2 1 2BR1 22'-7 3/8"HSS8X8X.250 A500-GR.B

SHPT ELEV.GRID LOC. 2 16/S-R 24'-6"7/8

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

.

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

2BR1

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

22'-28_3

21'-118_3

8

5

44

(-1'-016___11) HSS8X8X.250 x 22'-78

_3 (-2'-216___1 )

NO PAINT WITHIN 1'-6 OF BOTH ENDS

16___9

1'-11'-1

16___11

Page 18: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 2B67 BEAM

2 1 2B67 27'-10 1/2"W18X35 A992 GALV 1 a11 L4X4X5/16 23'-0" 6 a12 L3 1/2X3 1/2X5/16 2'-9 1/2" 6 a13 L3 1/2X3 1/2X5/16 2'-9 1/2" 6 ps1 PL3/8X6 1/2 0'-9" 6 px17 PL1/4X4 0'-4"

SHPT ELEV.GRID LOC. 2 21-23/T 26'-2"3/4

DATEREV REVISED

DIA BOLTA325N_TC3/4" 1 3/4"12 DIA BOLTA325N_TC3/4" 2 1/4"18

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

2B67

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

33

33

33

33

NO PAINT TOP FLANGE

RD

3'-94_1 23'-0 1'-14

_1

A

A

3'-84_1 5'-316

___1 7'-916___7 9'-316

___1 11'-1016___9 13'-316

___1 15'-1116___11 17'-316

___1 20'-016___13 21'-316

___1 24'-2 25'-316___1

1'-32_1

1'-82_1

px17 (FS-TYP)

a11 (GALV)

a12 (NS-TYP)

ps1 (NS-TYP)

a13 (NS-TYP)

EL2

6'-2

4_3

3 3

(-44_3)

W18X35 x 27'-102_1

(-44_3)

27'-82_1RD

13'-32_1

2

5'-32_1

5'-82_1

9'-32_1

9'-82_1

13'-82_1

17'-32_1

17'-82_1

21'-32_1

21'-82_1

33

1 16___15

px17

516___1

4_1

4_1 TYP

EL2

2'-8

3'-6

4_3

4 72_1

28_3

2 2_12'

-02_1

9 4_3ps1

a11 (GALV)

A - A

Page 19: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1C27 COLUMN

1 F2E 1 1C27 11'-11 13/16"HSS8X8X.313 A500-GR.B 6 ST2 PL3/8X4 0'-6" 2 ST3 PL3/8X4 0'-9" 3 ST4 PL3/8X4 1'-0" 4 m1 1_HEAVY_HEX_NUT 0'-1"

1 F2E 3 mc13 1'-2 15/16"HSS8X8X.313 A500-GR.B 1 F2E 1 mc14 12'-0 1/16"HSS8X8X.313 A500-GR.B 1 F2E 1 mc15 11'-5 5/16"HSS8X8X.313 A500-GR.B 1 F2E 1 mc17 8'-9 3/8"HSS8X8X.313 A500-GR.B

1 pb13 PL1 X14 1'-2" 1 pc5 PL1/2X9 1'-0" 6 pm2 PL1/2X9 0'-9" 2 ps4 PL3/8X4 1'-3"

SHPT ELEV.GRID LOC. 1 19/R.3 11'-6"13/16

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

1C27

6/5/06 COLUMN

S.T.1 SHOP COAT GSH

FOR FABRICATION

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

XA

1'-4

ON

C/L

EA

ST&

WE

ST

FAC

E T

O 3

7'-0

(NS)

13'-04_3

0

26'-44_3

39'-2

26'-54_1

28'-11

48'-2

8_3

ps4

ST4 (FS)ST2 (NS)

48'-3

8_7 (HS

S8X

8X.3

13 x

11'

-11 1

6___13)

1'-2

16___151'

-216___15

2_1

KE

EP

KE

EP

SOUTH

(NS)

B B

A A

13'-14_1

0

15'-7

17'-3

1

33

333

33

333

ST2

m1 (ON C/L-TYP)

ps4

ST4 (FS)ST2 (NS)

mc14

pm2

pm2 (CTR'D)(NO PAINT-TYP)

mc13

ST2

mc13

pb13

EL-

6

11'-1

1 16___13 2_1

1'-2

16___152_1

12'-0

16___12_1

KE

EP

EL4

7'-9

8_7

C C

B B

33

8'-9

8_3

B B

(NS)

30'-7

39'-22_1

48'-08_5

2_1

33

33

pc5

mc13

mc17

ST2

ST4 (FS)ST2 (NS)

ST3

mc15

ST3 (FS)

2_111

'-516___5

2_1

15'-0

16___5

4-116___1 Ø

77

5 2_15 2_1

7 7

52_1 52

_1pb13

A - A

(TYP-UNO)

ST4 (N0 PAINT)

4_1

4_1TYP

4_1

4_1TYP

16___38_1

8_1

8_1

24_3pm2

(NO PAINT-TYP)

B - B

4_1

4 2_14 2_1

3 4_13 4_1

8_1

72_1 42

_1

52_1

pc5ST3

C - C

Page 20: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1C12 COLUMN

1 F2E 1 1C12 29'-9 1/8"HSS8X8X.250 A500-GR.B 1 ST2 PL3/8X4 0'-6" 2 ST4 PL3/8X4 1'-0" 1 ST5 PL3/8X4 1'-3" 4 m1 1_HEAVY_HEX_NUT 0'-1" 1 pb10 PL1 1/4X14 1'-2" 1 pc7 PL1/4X8 0'-8" 1 pc9 PL1/4X6 0'-6" 1 ps7 PL1/2X4 1'-0" 2 ps8 PL1/2X4 0'-6" 1 ps9 PL1/2X4 0'-9" 1 px22 PL5/8X16 1'-6 3/4"

1 1 ts1 0'-5 3/4"HSS6X6X.500 A500-GR.B

SHPT ELEV.GRID LOC. 1 16/S 40'-4"3/8

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

1C12

6/5/06 COLUMN

S.T.1 SHOP COAT GSH

FOR FABRICATION

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

16'-32_1

8329

'-10 8_3

C C

B B

EAST

8 8_5

12

6

4_1

4_15 4_3

ps8 (N0 PAINT)

ps7 (N0 PAINT)

ps9 (N0 PAINT)

ps8 (N0 PAINT)

pc7

ts1 (CTR'D) pc9 (CTR'D)

ST2

pb10

ST4 (NS)

ST5

m1 (FS-TYP)

ST4

EL1

0'-6

30'-4

8_5 (HS

S6X

6X.5

00 x

54_3 )

A A

64 16___3

216___7 108

_3

9 16___1

1 4_3 3

4'-64_3

0

6'-24_3

15'-42_1

3

15'-5

33

3

px22

17'-104_3

19'-64_3

29'-68_3

36

33

3

33

33

D D

C C

4-116___9 Ø

16___5

55

77

5 5

7 7

(1"x16___13)

pb10

px22

A - A

4_1

4_1TYP

(TYP-UNO)24_3

8_1

8_116___3

4-116___1 Ø

ST4

ST2ps7

B - B

4_1

2-116___1 Ø

ps8

C - C

3-116___1 Ø

16___3

8_18_1

ST4

ST5

ps9

D - D

Page 21: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

12 XA MAS ANC WIRE TYPE

-- 1 1C8 COLUMN

1 F2E 1 1C8 51'-0"HSS8X8X.250 A500-GR.B 4 ST2 PL3/8X4 0'-6" 2 ST3 PL3/8X4 0'-9" 3 ST4 PL3/8X4 1'-0" 2 ST5 PL3/8X4 1'-3" 2 pa11 PL3/8X3 1/2 0'-5 1/2" 1 pb16 PL3/4X14 1'-2" 1 pc7 PL1/4X8 0'-8"

SHPT ELEV.GRID LOC. 1 22/R 50'-5"3/4

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

1C8

6/5/06 COLUMN

S.T.1 SHOP COAT GSH

FOR FABRICATION

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

26'-6

3

13'-2

2_1

3

pc7

ST4

ST4

ST3 (BS)

ST4

ST5 ST2 (BS)

ST5

ST2 (BS)

pb16

pa11 (BS)

51'-1

(HS

S8X

8X.2

50 x

51'

-0")

EL-

7E

L50'

-6

4_351

'-04_1

B B

A A 1'-1

0

"XA

" @ 1

'-4 O

N C

/L N

OR

TH &

EA

ST

FAC

ES

TO

10'

-0

(FS

)

EAST

13'-2

0

33

33

33

3

D D

C C

B B

2 2_1

39'-34_1

50'-716___3

50'-1016___3

33

33

33

4_1

4-116___1 Ø

77

5 2_15 2_1

7 7

52_1 52

_1pb16

A - A

4_1

4_1TYP

(TYP-UNO)

8_1

8_1

24_3

16___3

ST2

ST2

ST5

B - B

8_1

8_1

8_1

ST4

ST3

ST3

C - C

2 4_12 4_1

8_1 8_1

8_1

8_1

pa11

ST4

pa11

ST4

pc7

D - D

Page 22: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1C2 COLUMN

1 B1E 1 1C2 29'-8"HSS8X8X.250 A500-GR.B 1 ST3 PL3/8X4 0'-9" 1 ST5 PL3/8X4 1'-3" 4 m1 1_HEAVY_HEX_NUT 0'-1" 1 pb15 PL3/4X14 1'-2" 1 pc3 PL3/4X9 1'-5" 2 ps6 PL1/2X4 1'-3" 2 ps8 PL1/2X4 0'-6" 1 px15 PL5/8X14 1'-5 3/16"

SHPT ELEV.GRID LOC. 1 23/T 40'-2"3/4

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

1C2

6/5/06 COLUMN

S.T.1 SHOP COAT GSH

FOR FABRICATION

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

17'-114_1

4_1

B B

C C

C C

B B

NORTH

7 7

52_1 52

_1

29'-2

16___95 1

6___7

A

A

ST5

pb15

ST3

pc3 (ON C/L-GA=32_1)

ps6 (FS-NO PAINT)

ps6 (FS-NO PAINT)

ps8 (FS-NO PAINT)

ps8 (FS-NO PAINT)

2- m1 (ON C/L-TYP)

29'-1

1 (H

SS

8X8X

.250

x 2

9'-8

")E

L10'

-6

4_329

'-82 4_1

4'-74_1

0

6'-34_1

15'-5

16'-4

33

33

3

px15

19'-74_1

26'-44_1

28'-24_1

12

8 16___3

64_1

74_3

74_3

94_1

3

33

33

(1"x16___13)

6 16___5

1 8_3

10 216___11

6 8_1

12

px15 -ON C/L(NO PAINT)

4_1

4_1

4_1

4-116___1 Ø7 7

52_1 52

_1

pb15

A - A

4_1

4_1TYP

ps6

5-116___1 Ø

(TYP)

16___3

24_3

16___3

B - B

2-116___1 Ø

4_1

ps8

C - C

Page 23: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

50'-4

16___11 (H

SS

8X8X

.250

X 5

0'-3

16___5)

-- 1 1C1 COLUMN

1 F2E 1 1C1 50'-3 5/16"HSS8X8X.375 A500-GR.B 4 ST2 PL3/8X4 0'-6" 5 ST3 PL3/8X4 0'-9" 1 ST4 PL3/8X4 1'-0" 2 ST6 PL3/8X4 1'-6" 1 pb13 PL1 X14 1'-2" 1 pc12 PL1/4X8 0'-9" 2 ps7 PL1/2X4 1'-0" 1 ps8 PL1/2X4 0'-6" 5 ps9 PL1/2X4 0'-9" 1 px21 PL5/8X14 1'-4 13/16"

SHPT ELEV.GRID LOC. 1 16/Q 49'-10"5/16

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

1C1

6/5/06 COLUMN

S.T.1 SHOP COAT GSH

FOR FABRICATION

DATEREV REVISED

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

3 31

3

26'-44_3

25'-04_3

26'-54_1

ps9 (NS)

ps7 (NS)

ps9 (NS)

ps9 (NS)

EL-

6

150

'-316___5

33

33

3

33

33

3 3

1'-9

XA

1'-4

ON

C/L

NO

RTH

&S

OU

TH F

AC

E T

O 3

7'-0

SOUTH

13'-04_3

0

11'-84_3

0

13'-14_1

14'-04_3

B B

B B

C C

B B

A

A

7 7

52_1 52

_1

3

pb13

ST2

ST6 (FS)

ST3

px21 (NS)

16___5 E

E

33

33

33

33

3

ST3

pc12

27'-44_3

37'-11

39'-2

49'-1016___5

D D

B B

B B

C C

33

33

ST3 (FS)

ST2 (NS)

ST3

ST2

ST4 (FS)

ST3

ST6 (FS)

ST2

ps9 (NS)

ps8 (NS-NO PAINT)

ps7 (NS)

ps9 (NS)

4_1

4_1

7 4_1

12

44 4_1

7 4_11 1

6___9

216___9 98

_5

16___5

4-116___1 Ø

1'-18_5

7 7

52_1 52

_1

px21 (ON C/L-NO PAINT)

pb13

A - A

4_1

(TY

P-U

NO

)2 4_3

4_1

4_1 TYP

3-116___1 Ø

ps9 (N0 PAINT)

B - B8_18_1

16___3

16___3

4-116___1 Ø

ps7 (N0 PAINT)

ST3

ST6

ST2

C - C

8_18_1

8_1

8_1

3-116___1 Ø

ps9 (N0 PAINT)

ST4

ST2ST3

D - D

16___5

12

4 16___15

3 16___5

pc12

E - E

Page 24: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1B3 BEAM

1 1 1B3 28'-10 1/2"W21X50 A992 5 a3a L4X3-1/2X3/8 0'-8 1/2" 1 a5a L4X3-1/2X3/8 1'-2 1/2"

SHPT ELEV.GRID LOC. 1 18/T-R 12'-10"3/4

DATEREV REVISED

DIA BOLTA325N_TC3/4" 2"20

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

1B3

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

33

33

33

3

NO PAINT TOP FLANGE

(TYP)24_1

a5a (NS)a3a (NS)a3a (NS) a3a (F/S)a3a (F/S)a3aG0L=24

_3(TYP)EL1

2'-1

0 4_3

3 3

(-44_3)

W21X50 x 28'-102_1

(-44_3)

28'-82_16'-48

_7RD 6'-108_3 13'-48

_7 14'-28_7 20'-416

___13 21'-78_7

2

33

33 3

33

Page 25: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

-- 1 1B2 BEAM

1 1 1B2 28'-10 1/4"W16X31 A992 3 a3a L4X3-1/2X3/8 0'-8 1/2" 11 a24 L6X4X3/8 0'-6"

SHPT ELEV.GRID LOC. 1 20/U-R.3 12'-10"3/4

DATEREV REVISED

DIA BOLTA325N_TC3/4" 1 3/4"9 DIA BOLTA325N_TC3/4" 2"22

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

1B2

6/5/06 BEAM

S.T.1 SHOP COAT GSH

FOR FABRICATION

a24 (TYP)

NO PAINT TOP FLANGEAND WITHIN 6" OF BOTH ENDS

A

A

12_1 12

_1

1 16___15

1 16___7

(TYP)

12

616___15

(TYP)24_1

1 16___15

1 16___7

GOL 24_3

HOLES-FS ONLY

a3a (NS-TYP)G0L=24

_3

(-48_7)

W16X31 x 28'-104_1

(-48_7)

15'-04_3

14'-6

4_3

16'-1

1 4_3

33

3

12_1

12_1

12_1 12

_1

8'-04_3RD

18_7

114_30

1'-2

4_3

3'-7

4_3

3'-1

0 4_3

6'-3

4_3

6'-6

4_3

8'-1

1 4_3

9'-2

4_3

11'-7

4_3

11'-1

0 4_3

14'-3

4_3

EL1

2'-1

0 4_3

33

33

22'-04_3 28'-88

_3

17'-2

4_3

19'-7

4_3

19'-1

0 4_3

22'-3

4_3

22'-6

4_3

24'-1

1 4_3

25'-2

4_3

27'-7

4_3

27'-1

0 4_3

112_1

33

33

218

_3

6 (16___13x12

_1)

a24 (TYP)

A - A

Page 26: 1B1 - BEAMDrawing Prepared on 3D-Xsteel WAREHOUSE/OFFICES 6028A TOTAL SWISS ARMY 7 VICTORIA DR., MONROE, CT 1C13 05/11/06 COLUMN 1 S/C STD PRIMER ST GSH QTY NO. SHIP'T 2 1 2 2 1 4

ALL BOLTS FNGR TIGHT

-- 2 L11 LNTLASSEMB

GALV 2 L11 L4X4X5/16 23'-0" 12 a20 L3 1/2X3 1/2X5/16 2'-8 5/16" 12 a21 L3 1/2X3 1/2X5/16 2'-8 5/16" 12 ps1 PL3/8X6 1/2 0'-9"

SHPT ELEV.GRID LOC. 7 21-23/M 36'-4" 7 21-23/M-L 36'-4"

DATEREV REVISED

DIA BOLTA325N_TC3/4" 1 3/4"12 DIA BOLTA325N_TC3/4" 2 1/4"18

REMARKSPRELIM #LENGTHDESCRIPTIONMARK NO.TOTAL

QTYSHIP'T

NTSSCALE:

MATERIAL :

PAINT NOTEOPEN HOLES:

WELDING ELEC :

3/4 A325 TC UNO

13/16 UNO

BOLTS:E70XXLH

DRAWN BY:

SHEET NO.

DRWG PROP:

DATE:

A36 - UNO

CHECKED BY:

S.O.-JOB NUMBER DWG NUMBER

Drawing Prepared on 3D-Xsteel

NEW ELEMENTARY SCHOOL

6021A

C.B. JENNINGS

50 MERCER ST. NEW LONDON, CT.

L11

6/5/06 LNTLASSEMBLY

S.T.GALV GSH

FOR FABRICATION

9'-82_1

13'-32_1

13'-82_1

17'-32_1

17'-82_1

21'-32_1

21'-82_1RD

23'-0

A

A

a20 (TYP)

ps1 (TYP)

a21 (TYP)3

31 2_1

2'-6

16___13

11 2_1

2'-9

16___5

216___5 216

___5

1'-32_1

1'-82_1

5'-32_1

5'-82_1

9'-32_1

4 32_1

16___13X

1 4_1 HR

Z S

LOTS

@a2

0&a2

1

16___13X14

_1 HRZ SLOTS@ps1

1

1

18_3 58

_1

24_1

1 2_12'

-616___13

1 2_13

31 2_1

2'-9

16___5

2 2_1

ps1

A - A