CONSTRUCTION COST MANAGEMENT
CONSTRUCTION COST MANAGEMENT
PERBEDAAN COST ENGINEERING DENGAN QUANTITY SURVEY
PRIMARY SKILL
Quantity Surveyor Cost Engineer
• Cost Estimating• Feasibility Studies• Advise on Construction cost planning• Preparing Tender documents• Develop / Manage Cost Control Systems
• Cost Estimating• Cost Analysis• Cost & Schedule Control• Constructability Planning
FIELD OF SPECIALIZATION
Quantity Surveying Cost Engineering
• Preparing Cost Estimates• Project Monitoring Services• Mediation & Arbitration• Life Cycle Costing
• Cost Estimating & Control• Profitability Analysis• Planning & Scheduling• Mediation & Arbitration• Life Cycle Costing
LEVEL OF PROJECT INVOLVEMENT
Quantity Surveying Cost Engineering
• Preliminary Estimating• Controlling cost through the Design stage• Analyze cost effectiveness• Cost checks at various stages of the project
• Estimating• Project Planning & Scheduling• Project Control• Project Closeout
TYPES OF PROJECTS
Quantity Surveying Cost Engineering
• Residential projects• Commercial Projects• Institutional / Public projects
• Commercial• Institutional / Public• Industrial / Manufacturing• Non-Appreciable Projects
COST MANAGEMENT
1. RUANG LINGKUP SESI I
2. PROSES KONSTRUKSI SESI I
3. PERSYARATAN DAN SPESIFIKASI SESI II
4. WBS SESI II
5. PROSES COST ENGINEERING SESI III
6. COST ESTIMATINGRISK SESI IV
7. BUDGETING SESI IV
8. FINANCING SESI V
9. CASHFLOW SESI V
10.COST CONTROL SESI VI
11. PENUTUP SESI VI
12.UJIAN MTS SESI VII
Needs
cost
value
Conf managemen
t
scm
Value& quality
Project budget
Cost estimate
cashflow
Financialmanagemen
t
Projcet cost
control
Cost & value
integrationCost
and value
BUDGETED PROJECT END OF ASSET
CONCEPT PRE FS FS APPRAISE PROCURE OPERATE DECCOM CLOSE
DEFINE PROJECT
DEFINE PROJECT APPROACH
DEVELOP APPROACH/DESIGN
DEVELOP DETAI; APPROACH
PROCURE & TRAIN
NEXT PROJECT
VALUE PLAN VALUE ENGINEERING VALUE REVIEW
HAND OVER POST PROJECT EVALUATAION
UNBUDGETED IMPLEMENTATION OPERATION
PRE INVESTMENT PHASE INVESTMENT PHASE
VALUE MANAGEMENT PROCESS
CONSTRUCTION COST ENGINEERING & MANAGEMENT
KNOWLEDGE
COST ENGINEERING
& MANAGEMENT
COST ENGINEERING
WBS & CODING LEASSON LERANED
COST & VALUE MANAGEMENT
COST ESTIMATING
LIFE CYCLE COST
VALUE ENGINEERING
BUDGETTING & CONTROL
BUDGETTING CASH PLANNING CONTROL
EARNED VALUE MANAGEMENT
REPORTING
COST & VALUE MANAGEMENT
NEED ANALYSIS
COST ESTIMATE
BUDGETING
COST CONTROL
CASH FLOW
VALUE MANAGEMENT
CHANGE
SUPPLY CHAIN
QUALITY
INTEGRATION
NEED ANALYSIS
• Kebutuhan• Persyaratan• Ruang lingkup dan Spesifikasi• WBS
COST ENGINEERING
• WBS• OBS• CODING• CHART OF ACCOUNT• BUDGETING• CONTROL
COST ESTIMATE
• ESTIMASI ITEM PEKERJAAN• KEBUTUHAN ESTIMASI• METODA ESTIMASI• KETELITIAN ESTIMASI• ESTIMASI RINCI• PENGANGGARAN
BUDGETING
• PENGANGGARAN• CHART OF ACCOUNT• DISTRIBUSI DANA TERHADAP WORK
ITEM DAN WKTU• CASHFLOW
CASH FLOW
• SUMBER DANA• PENGGUNAAN DANA• TERHADAP WAKTU
COST CONTROL
• KEMAJUAN PEKERJAAN• PERBANDINGAN BIAYA RENACAN DAN
KENYATAAN• EARNED VALUE METHOD
FINANCE
• PENDANAAN PROYEK• PENDANAAN KONTRAKTOR