1S & 2S CFT AUDIT CHECKLIST
Doc.No:BALCO/ENABLING/BE/IMS/AO/Doc 002 Rev.No-01 Ver.No-00 Date-30.11.15AREA: first-aid plant-1 DATE: 1/1/2016
AUDITOR: Arun Biswal AUDITEE: VEDPRAKASH
OVERALL SCORE 91
SORT ACTIVITY DESCRIPTIONS- 1S CRITERIA SCOREMAXSl.No. Checkpoints Checkpoint Description
1 10.00
2A 6.00
2B 6.00
3 4.00
4 4.00
5 10.00
6 4.00
7 2.00
8 Electrical 4.00
TOTAL 1S SCORE 50.00
Unnecessary Items/Materials
Rejected Materials, Rework Materials, waste materials, obsolete items, shelf life expired, damaged items are regularly removed from workplace to red tag area and timely disposed off to scrap yard/dump yard.
2 Marks deduction for each deviation
Unnecessary Files,Records,Document
s,Notices,Posters
Old records/files/obsolete documents etc, are regularly removed from place of work and timely disposed off.
2 Marks deduction for each deviation
Out-dated or otherwise unnecessary posters,memos,announcements,reports, notices etc. are removed from the workplace (all visual displays to be updated).
2 Marks deduction for each deviation
Machines, Equipments etc.
Unusable machine parts, motors, Equipment are identified periodically as a system, removed from place of work and disposed off regularly.
2 Marks deduction for each deviation
Tools, Accessories, Fixtures, Furnitures etc.
a.Broken,unecessary or unusable Tools, accessories, fixtures,chairs,shelves, lockers,workbenches,etc. not required to make the current product is removed from the workplace & are timely identified, repaired if possible for reuse or disposed off on regular basis. b.Only the required furniture,tools.fixtures and accessories is present at the workstation.
2 Marks deduction for each deviation
Lockers,Drawers,Shelves,Almirahs,Cabinets and
CupboardsTops & insides of all cupboards,shelves,tables,drawers,almirahs,lockers,cabinets etc are free of unwanted items.
2 Marks deduction for each deviation
Used Items/Surroundings
Empty LPG Cylinders,CO2 Cylinders,O2 Cylinders,Argon Cylinders,N2 Cylinders, Paint tins,Oil drums,Packaging materials,Weld Coils,Thinner,Ecosol,Kerosene and other used items are regularly removed from the plant and disposed off regularly.
2 Marks deduction for each deviation
No Spillages,Overflows & Leakages
All leakage points to be identified & arrested.Oil, coolants, grease, cleaning agents, paints are not allowed to spill. In case happens immediately attended. No leakage from roofs,water taps, air hoses, oil drums etc.No over flowing of sewage, water logging /stagnation in canals,etc. in the work areas.
2 Marks deduction for each deviation
Tripping dangers such as electrical cables, etc. are removed from standing/walking areas. Danger Tags on feeders are updated.All feeders,terminal boxes & panel doors are closed.
2 Marks deduction for each deviation
SET IN ORDER ACTIVITY DESCRIPTIONS -2S CRITERIA SCORE
9A 4.00
9B 4.00
10AStorage Methods
8.00
10B 4.00
11 Tools and Tackles 4.00
12 Location Charts 4.00
13 Emergency 4.00
14 8.00
TOTAL 2S SCORE 40.00
TOTAL (1S+2S) SCORE 90.00
Layout & Dividing Linesa.Dividing lines are clearly drawn with Yellow lines on the floor.Red lines are drawn for storage of rejects/scrap/waste materials.
2 Marks deduction for each deviation
b.Walkways,vehicle paths & exits are unobstructed. 2 Marks deduction for each deviation
a.Components are stored in Bins, pallets and trolleys in shop floor & local stores with appropriate labels.The items are stored based on the frequency of the usage, part number,quantity etc.
2 Marks deduction for each deviation
b.Equipments,Lifting Tools & tackels are clearly identified (numbered, named, coluor coded etc.) 2 Marks deduction for each deviation
a.Tools have a designated storage location that is within reach of the operator. Labelling of tools as per their nomenclature is done. b.Required items are clearly identified and are stored in the departments, Tool crib and Stationary items etc are stored with shadow board concept.
2 Marks deduction for each deviation
Items are earmarked with Tags. Materials under inspection /Rejections are stored in such a way that they are not allowed to get mixed up and clearly identified with stickers.Item wise location charts are displayed prominently in local store and shopfloor.
2 Marks deduction for each deviation
a.Fire Hoses,Hydrants,Extinguishers and other emergency equipments are prominently displayed and are unobstructed. b.The workplace layout accomodates easy exit in case of emergency(Safe Assembly Point,Fire Exits). c.Stop switches and breakers are highly visible and located for easy access in case of emergency.
2 Marks deduction for each deviation
Contents in Lockers,Drawers,Shelves,Almirahs,Cabinets and
Cupboards
Paperwork-Files,Records,Documents,Reports in Cabinets/lockers/shelves/drawers/alimirahs/cupboards are properly labelled and has a clearly defined location and list of items/index/contents to be placed outside cabinets.PEEP(place for everything & everything in its place)is to be strictly followed.
2 Marks deduction for each deviation
OTHER MANDATORY ACTIVITY DESCRIPTIONS CRITERIA SCORE
15 5S Score Board 5S Score Board to be updated. 1.00
16 Training and Awareness 2.00
17 Closure of Last Audit Observations. 3.00
18 2.00
19 Red Tag Register Updation of Red Tag Register of the Red tagging done in a zone. 2.00
TOTAL MANDATORY ACTIVITIES SCORE 10.00
OVERALL SCORE 100.00
Prepared By: Team BE
Compliance:100% for 1 mark , else 0
Regular training programe to be attended/conducted by employees with evidence of training and awareness to be checked on random basis.
Compliance:80% to 90%
to 100%=+2
Compliance to Last Audit Observations
Compliance:0% to 50% to 90% to
100%=+3
No. of Red tags placed/Removed
Unidentified ( whether required / not required ) items are duly Red Tagged & Plan for Removal of Red Tags is decided. No. of Red tags placed/Removed in a month as per due date.
Compliance:80% to 90%
to 100%=+2Compliance 100% for 2
marks , else 0
1S & 2S CFT AUDIT CHECKLIST
Date-30.11.151/1/2016
VEDPRAKASH
91
SCORE REMARKSACTUAL
8
6
6
4
4
8 Check the drawer
4
2
4
46 OVERALL REMARKABLE IMPROVEMENT
SCORE REMARKS
2
4
8
4
4
4
4
6
36
82
Cleaning Tool, Damaged glass frame
SCORE REMARKS
1
1
3
2
2
9
91OVERALL FULLFILL ALL THE REQUIREMENT AS DESCRIBE EARLIER IN MY LAST REPORT.
Approved By: Head BE