Department of the Interior and Local Government CORDILLERA ADMINISTRATIVE REGION
1st Semester, FY 2014 Narrative Report
*LGRRC REPORT IS ON PAGE 17
I. INTRODUCTION
For the 1st semester of FY 2014, activities of DILG-CAR were all geared towards the implementation of the priority programs, projects and activities of the Department.
II. MAJOR ACCOMPLISHMENTS ON THE NATIONAL PROJECTS FOR REGIONAL IMPLEMENTATION
OUTCOME: BUSINESS FRIENDLY AND COMPETITIVE LGUS
Organization of LEIPO/LEDIP Team/LEDIP Office
All six provinces of CAR, two cities and 71 of its 75 municipalities, including the
five target municipalities of the Province of Ifugao, have designated their LEIPO. In
addition, the provinces of Kalinga and Mt. Province, and 30 municipalities from the
different provinces have organized their LEDIP Team. Five of the six provinces, one city
and 47 municipalities have organized their LEDIP Office. The minimum requirement is
the designation of LEIPO.
P/C/M With LEIPO With LEDIP TEAM
With LEDIP Office
Abra : P M
1 25
___ 7
1 17
Apayao : P M
1 7
___ ___
1 7
Baguio City 1 ___ ___
Benguet: P M
1 11
___ 3
___ 1
Ifugao : P M
1 11
___ 3
1 11
Kalinga : P C
M
1 1 7
1 ___
5
1 1 7
Mt. Province: P M
1 10
1 2
1 4
TOTAL: P 6 2 5
Pag
e2
C M
2 71
0 30
1 27
Updating of CDP, Local Revenue Code, LIIC and Schedule of Market Value
In addition, the target municipalities of Banaue, Alfonso Lista, Lagawe, Lamut and
Kiangan in Ifugao Province have updated their CDP. Except Lamut, the above
municipalities have also updated their Local Revenue Code, with Lagawe having updated
LIIC. The municipalities of Lagawe and Banaue have updated Schedule of Market Value.
Above target accomplishments for the CDP updating is five municipalities of
Ifugao.
Representatives of the Municipalities of Banaue and Alfonso Lista attended the
Consultative Dialogue and Technical Assistance on LIIC last June 24-26, 2014 which was
conducted by BLGD and LGA at LGA-TC, Los Baños.
Streamlining of BPLS
Twenty of the 21 target municipalities under this program have successfully
streamlined their BPLS. The remaining municipality of Tanudan, Kalinga is targeted for
the 2nd semester.
Regulatory Simplification for LGUs ( to include Streamlining of Building/Construction
and Occupancy Permitting System)
Target cities of Baguio and Tabuk, and
municipalities of Kabugao, Apayao and La
Trinidad, Benguet have successfully launched
their RS4LGUs. On March 24, 2014 the,
Municipal Government of La Trinidad has
launched their RS4LGUs which was attended
by USEC Austere Panadero and LGA Executive
Director Marivel Sacendoncillo. Also, the two
DILG Officials are signatories to the
Memorandum of Agreement.
Pag
e3
Tabuk City, Kalinga also launched their
RS4LGUs last June 25, 2014.
Municipal Government of
Kabugao, Apayao has successfully
streamlined their Building/Construction
and Occupancy Permitting System. The
Enhanced BPLS/RS4LGUs was launched
last June 24, 2014 at Kabugao.
Notable Accomplishments
DILG-Mt. Province has conducted the BPLS Compliance and E-readiness survey to
all its ten (10) municipalities. Also, they have conducted BPLS Forum on March 21,
2014.
DILG-Baguio City Field Office has provided technical assistance to the City on the
identification of collaborative activities to enhance LGU business-friendly image.
Participation to the ICT Innovations Forum: Key to Accelerating Local Governments’
Competitiveness held June 18, 2014 at Intercontinental Hotel, Makati City.
Special Local Roads Fund (SLRF)
Apayao, Benguet and Mt. Province and Tabuk City are beneficiaries of the SLRF
2013 which were funded in 2014, and Benguet Province was also beneficiary of the SLRF
Ribbon Cutting by RD John
Castaneda assisted by ARD
Usman of DTI-CAR and Hon.
Mayor Ferdinand Tubban.
Pag
e4
2012. All four projects were completed firsts quarter of 2014. Below is the SLRF 2013
project descriptions:
APPROVED CY 2013 SLRF (SARO-BMB-A-14-003279)
OUTCOME: ENVIRONMENT PROTECTIVE, CLIMATE CHANGE ADAPTIVE & DISASTER
RESILIENT LGUS
Enhancing LGU Capacity on Disaster Risk Reduction/ Climate Change Adaptation and
Mitigation
Assessment
All six provinces, two cities and 75 municipalities of CAR have undergone the Disaster
Preparedness Audit and Environment Compliance Audit as part of the Seal of Good Local
Pag
e5
Governance. Results of which are being encoded and uploaded to the LGPMS-SGLG
website.
Capacity Enhancement
The Regional Focal Person has just undergone the ToT on Vulnerability Assessment
last June 9-12 at LGATC, Los Baños.
A total of 14 municipalities and one city from Kalinga and Apayao provinces -- 53
participants, exceeding the target 45 participants, from seven municipalities and one
city from Kalinga and seven municipalities from Apayao have undergone the GIS
Training conducted by DILG-CAR last April 21-25, 2014 in Baguio City.
Last May 19-22, Tinglayan,Kalinga requested the conduct of QGIS Training since they
missed the training conducted by DILG-CAR earlier. Aside from the technical personnel
from the Planning and Development Office, Engineering office, Disaster Risk Reduction
and Management Office, and Local
Government Operations Officers of
Tinglayan attending this training,
heads/staff from all the other
municipal offices and that of the
attached agencies like the PNP, BFP
and DENR also participated bringing
the total participants to 29, almost
double the 15 target participants.
Participants train hands-on on GPS. The participants and trainers with
Mayor Johnny D. Maymaya Sr. (front
row center)
Pag
e6
Continuing Monitoring of DRR/CCA Related Laws and Policies
Below is the percentage of compliance to DRR/CCA Related Laws and Policies of
local governments in the region:
Deliverables LGUs Number Percentage
Calamity Response Protocols
Establishment of Operation Center
Province City
Municipalities
6 2
75
100 100 100
Organization of Emergency Response Rescue & Medical Teams
Province City
Municipalities
6 2
75
100 100 100
Identification of Evacuation Centers
Province City
Municipalities
6 2
75
100 100 100
Institutionalization of Warning and Alarm Systems
Province City
Municipalities
6 2
75
100 100 100
DRR Act Organized DRRM Council Province
City Municipalities
6 2
75
100 100 100
Establishment of DRRM Office Province 3 50 Designated DRRM Officer Province
City Municipalities
6 2
75
100 100 100
Formulated DRRM Plan Province City
Municipalities
6 2
67
100 100
89.34
Note: Please refer to statistical report since many of the above have been delivered earlier.)
Below is the percentage of compliance of barangays to a number of deliverables
required by the Office.
Deliverables Number Percentage
Barangays with
CBDRRM Plan 1,175 100
Contingency Plan 726 61.78 Barangay Readiness Profile 1,175 100
Pag
e7
Organized CBDRRM Structure 1,175 100
Barangays provided with IEC (Family Guide to Action) materials
6 2
75
100 100 100
All 1,175 barangays of CAR were provided with the Family Guide to Action in
2013. Also, many barangays have also complied with the above deliverables in 2013. To
date, 449 barangays have yet to craft their contingency plans.
For this Outcome Area, several related activities were conducted at the regional
level. These are
1. Training on GIS for Climate Change & Disaster Risk & Vulnerability Reduction
2. Iba Na Ang Panahon (INAP) Science for Safer Communities
3. Knowledge Exchange on Disaster Risk Reduction and Management
4. Rapid Damage and Needs Analysis (RDANA)
DRRM Provincial summits were also conducted in all the provinces spearheaded
by OCD in collaboration with DILG, DOST, DSWD and other members of the DRRMCs
from April to June 2014. Participants to these summits were local chief executives,
members of DRRM council, media, CSOs and other stakeholders.
Other provincial activities include BDRRM planning and Training on Mountain
Search and Rescue.
OUTCOME: SOCIALLY-PROTECTIVE AND SAFE LGUS
Pillar 1: Support to the Establishment of Peace Foundations through Policy Reforms
and Development
Regional Campaign on INAP:
Science for Safer
Communities held at
Albergo Hotel, Baguio City
last May 8-9, 2014
Pag
e8
Setting-up of Mediation and Healing Mechanisms
Training on the Setting-Up of Local Healing and Mediation Mechanisms was held
on June 26-27, 2014 at La Breza Hotel, Quezon City and was attended by participants
from the municipalities of Manabo, Abra; Pudtol, Apayao;, Kibungan, Benguet; Asipulo
and Tinoc, Ifugao; and and Pasil, Kalinga. Participants to this Training were LCEs; SB
Chairperson of Peace and Order Committee; MSWDO; Private Sector sitting in the Local
Peace and Order Committee or IP Representatives
Earlier in January 28, DILG-CAR Regional Office led a meeting at Home Stay Diner,
Sagada Mt. Province to discuss the project Setting Up of Mediation and Healing
Mechanisms in Conflict-Affected Areas (CAAs). This project generally aims to help LGUs
which belong to the CAAs to set up functional mediation and healing mechanisms in
their localities to sustain the gains of previous peace and development efforts including
those which have resulted to peace agreements. The meeting resulted in the following:
1. Identification of existing mediation and healing mechanisms in the LGUs or in
the community;
2. From what were identified, the LGU distinguished what works and what does
not work;
3. Provided the persons
and offices involved in
mediation and healing
at the local level, and
4. Data gathered was
utilized and submitted
to LGA for inclusion in
designing the
framework and
training program for
mediation and
healing.
Monitoring the Functionality of Lupons and BHRACS
DILG-CAR personnel with MLGOO Ray
Fiar-od discuss the project with Sagada
Vice-Mayor Ben Capuyan, IPMR Jaime
Dugao, PNP rep and other local officials
and functionaries.
Pag
e9
All Lupons of the 1,175 barangays were already organized and functional by 1st
quarter of 2014.
For the Barangay Human Rights Action Center, a total of 896 barangays or 76.25
percent have functional BHRACs. Below are the details.
Province/HUC Total no. of Barangays
No. of Barangays with BHRACs
Percentage
Abra 303 204 67.33
Apayao 133 133 100
Baguio 128 128 100 Benguet 140 36 27.72
Ifugao 175 175 100
Kalinga 152 76 50
Mt. Province 144 144 100
Total 1175 896 76.25
Pillar 3: PAMANA-DILG Fund
PAMANA-DILG 2012
Eight projects were completed as of 1st semester 2014 bringing to a total of 21
projects or 100 percent completed under PAMANA-DILG 2012.
PAMANA-DILG 2012: Summary of Project Implementation
Pag
e10
Completed projects as of 1st Quarter 2014
1. Improvement of Katalbawan Irrigation System in DALUPA, PASIL, KALINGA
2. Construction of Dangla Footbridge in CAGALUAN, PASIL, KALINGA
3. Construction of Crib Wall along Cagaluan (Lutut Section) in CAGALUAN, PASIL,
KALINGA
4. Improvement of Cagaluan Irrigation Canal in CAGALUAN, PASIL, KALINGA
5. Improvement of Cal-owan FMR in Balbalan, KALINGA
6. Improvement and Construction of Tatakkan- Guimuyo FMR in Tanudan, KALINGA
Completed projects as of 2nd Quarter 2014
7. Dagi-Magdgad Foot bridge rehab in Balbalan, KALINGA
8. Agro-Forestry Livelihood Project in Tinglayan, KALINGA
PAMANA 2013
There are six completed projects under PAMANA 2013 amounting to PhP 85M.
Seven are still on-going. Below is the list of completed projects.
Completed Project Project Cost
Completed 1st Quarter 2014
1. Cabiten-Kamantakki Rd. in Mankayan, Benguet 8.0 M
2. Improvement of Sta. Maria- Balluyan- Malayugan Road, in Flora, Apayao (1.7 Km road opening and gravelling connecting to Lasam, Cagayan and improvement of both approaches)
6.0 M
Completed 2nd Quarter 2014 3. Concreting of Allaguia Rd. from Pinukpuk to Balbalan in Kalinga 20.0 M
4.Road improvement of Bontoc-Besao Rd. (16 Kms) in Mt. Province 20.0 M
5. Improvement of Poblacion Market Marat Rd., Paracelis, Mt. Province 7.0 M
6. Opening of Buneg-Pacqued Rd., Lacub, Abra 24.0 M
TOTAL 85.0 M
Pag
e11
Provision of Potable Water Supply
SALINTUBIG 2012
There are two completed projects for the period 1st sem 2014 bringing to a total
of 13 or 100 percent SALINTUBIG 2012 projects completed.
SALINTUBIG 2012
Waterless Barangays
1. Construction of Water Supply System in Nayon, Lamut, Ifugao
Waterless RHUs
2. Tinglayan RHU in Kalinga Note: All other 11 SALINTUBIG 2012 projects were completed in 2013.
Inauguration and turn over
ceremony – Concreting of
Allaguia Road from
Pinukpuk to Balbalan in
Kalinga last July 18, 2014
Pag
e12
SALINTUBIG 2013 (GPBP)
A total of 85 projects in 19 municipalities in CAR were funded under the
SALINTUBIG 2013 (GPBP), 65 or 76.47 percent of which are already completed by 1st
semester 2014. Twenty projects or 23.52 percent are still on-going. All projects are
regularly monitored by the regional and provincial project monitoring teams.
SALINTUBIG 2014 (GPBP)
A total of 40 projects being implemented in 38 municipalities are all on-going to
date.
Comprehensive Local Integration Program (CLIP)
Orientation-Seminar on CLIP and Former Rebel Information System (FRIS) for
Luzon Cluster was held June 30-July 2, 2014 at Angeles Pampanga. The Regional and
Provincial Focal Persons, Regional Accountants, PNP and PSWDO participated in the
activity. In that activity, ten former rebels were targeted to be provided with financial
subsidy – three from Abra Province and seven from Kalinga Province.
Localization of National Comprehensive Juvenile Intervention Program(CJIP)
Tap stand and water tank of the water
system in Nayon, Lamut, Ifugao
Pag
e13
The program orientation on CJIP which was held at Tacloban City on September
19-20, 2013. La Trinidad Vice-Mayor Romeo Salda and staff, and LGOO VI Bable Adnol
of DILG-CAR participated in the training event.
This region continuously provides technical assistance through coaching and
facilitating the target-municipality – La Trinidad, Benguet.
As for Bangued, Abra, which is a non-target LGU, orientation on NCJIP was held
last June 26-27, 2014 at Bangued.
Localization of Magna Carta for Women
DILG-CAR hosted the Luzon Cluster last May 27-29, 2014 in which participants of
this activity were the RFPs and PFPs of GAD and GPB Prov’l Focal Person of DILG Regions
I, II, III and CAR.
This level has been monitoring the compliance of LGUs to the Magna Carta for
Women. While monitoring efforts shall be done until the end of the year, it was found
out that most municipalities have formulated their GAD Plan. Provinces of Apayao and
Mt. Province have likewise formulated their GAD Plans, as well as Baguio City.
Province Municipalities
Abra (13) Bangued, Bucay, Lacub, Lagangilang, Luba, Pidigan, Pilar, Sallapadan, San Isidro, San Juan, San Quintin, Tubo, Villaviciosa
Apayao (5) Calanasan, Flora, Luna, Pudtol, Santa Marcela
The participants and resource speakers
during the orientation on NCJIP held at
Bangued, Abra last June 26-27, 2014
Pag
e14
Benguet (7) Atok, Bakun, Bokod, Itogon, Mankayan, Tuba, Tublay Ifugao (11) All 11 Municipalities
Kalinga (4) Balbalan, Lubuagan, Pasil, Pinukpuk
Mt. Province (5) Bauko, Besao, Sadanga, Natonin, Tadian
OUTCOME 4: ACCOUNTABLE, TRANSPARENT, PARTICIPATIVE AND EFFECTIVE LOCAL
GOVERNANCE
Performance Challenge Fund
Except for the Province of Benguet, all five provinces, Tabuk City, and 40 municipalities in the region were already provided with the 2013 PCF subsidy.
As of April 12, 2014, Tublay have already completed the improvement of the Tublay
School of Home Industries (TSHI) Extension ground in Benguet, the first project funded under the 2013 Performance Challenge Fund (PCF) to be completed.
All project proposals were reviewed and all projects are closely monitored by project
monitoring teams at the provincial and regional levels.
Full Disclosure Policy (FDP)
Monitoring compliance to the FDP continue at all levels. Posting of all necessary documents at three conspicuous places (3CPs) and at the FDPP portal is 100 percent for provinces, 100 percent for cities, and 84 percent for municipalities or 63 out of the 75 municipalities.
LGUs Posting at 3 CPs Posting at the FDPP
Number Percent Number Percent
Provinces 6 100 6 100
Project inspection at Tublay,Benguet.
Pag
e15
Cities 2 100 2 100 Municipalities 69 92 63 84
Barangay Compliance to FDP. As of 1st semester, a total of 483 barangays have
posted all eight required documents at three conspicuous places.
Seal of Good Local
Governance (SGLG)
All timelines for SGLG were behind schedule and assessments were done June
2014 due to the delay in the release of Final Guidelines. But nonetheless, all LGUs of
CAR were assessed by the RAT by the end of June 2014. Uploading of SGLG
Documentation Reports and encoding into the LGPMS Online DCF is on-going.
Lupon Tagapamayapa Incentive Awards (LTIA)
Province/ Total No. of Barangays
Number Percent
Abra (303) 37 12.21
Apayao (133) 133 100
Baguio (128) --- --
Benguet (140) 82 58.57
Ifugao (175) 95 54.29 Kalinga (152) 3 1.97
Mt. Province (144) 133 92.36
TOTAL 483 41.10
Pag
e16
Regional, Provincial and City Awards Committee were all activated. Assessment
of nominees for each category was conducted up to the Regional level. Regional nominees were submitted to BLGS last April 14, 2014
Volunteer Program
On March 14, 2014, the region has oriented ALL six provinces, two cities and 175 municipalities of CAR.
All 77 target LGUs (2 Cities and 75 Municipalities) of CAR have established
their Volunteer Citizen’s Desk for the 1st semester of 2014. Likewise, 2 provinces namely Apayao and Mt. Province also established their own Volunteer Citizens’ Desk.
OUTCOME: STRENGTHENED INTERNAL ORGANIZATIONAL CAPACITY Improvement of IT Services All DILG field offices underwent the Training workshop on Online Reporting with Cloud Computing and LGA Web-based M &E System
Department –wide Communication and Advocacy
Training on online
reporting with
Cloud Computing
and LGA web-
based M&E System
at the different
DILG-Provincial
Offices
Pag
e17
A regional communication plan has been crafted although PACS have yet to release the Department communication plan. As of 1st semester, four issues of the regional newsletter was released: December 2013 issue, Jan-Feb issue, March issue, and April – May issue. The 2013 Annual report was also published in June.
Local Governance Regional Resource Center The LGRRC have acquired 14 books for the 1st semester. Meetings are done by consortiums. The Regional WATSAN Hub has conducted two meeting this semester. Competency Build-up of Officers and Staff Nineteen (19) out of the 21 LGOO II/III trainees who underwent the 48th Batch LGOO Induction Training graduated last May. The top 1, 2 and 7 were garnered by CAR. Repair, Rehabilitation and Improvement of DILG-CAR Regional Office Phase I was accomplished first semester and further improvements is scheduled anytime this 2nd semester. III. REGIONAL / PROVINCIAL COMMITMENTS
REGIONAL OFFICE COMMITMENT
Commitment (Tatak) 2014 Targets
Accomplishment
(As of June 15,
2014)
2nd Sem Targets
3rd
Qtr 4th
Qtr
Tatak Good
Governance
• 100% of C/M have
streamlined BPLS
2 – Cities
72 - Muns
3 Muns
• 50% of P/C/M are
SGLG passers
Cannot be
ascertained as of
June 15, 2014 as
assessment /
validation by RATs
is still on-going
SGLG passers
depend upon the
national
validation results.
• 50% of Brgys have
adopted the BGPMS
71% of 1,175
barangays
29%
Pag
e18
DILG-APAYAO COMMITMENT
Commitment (Tatak) 2014 Targets Accomplishment
(As of June 15, 2014)
2nd
Sem Targets
3rd
Qtr 4th
Qtr
Tatak Seal of Barangay Good Housekeeping (Excellence Confernment to Barangays on Good Governance)
1) 20% Barangay FDP
100% of 133 barangays posted their brgy FDP
2) 20% BGPMS
100% of the 133 barangays passed their BGPMS
OTHER TARGETS: 3) 20% of barangays
passed the Seal of Barangay Good Housekeeping
P5M was appropriated by Provincial Government of Apayao as barangay PCF
Awarding of barangay PCF to qualified barangays
Implementation of barangay PCF
DILG-ABRA COMMITMENT
Commitment (Tatak) 2014 Targets Accomplishment
(As of June 15, 2014)
2nd
Sem Targets
3rd
Qtr 4th
Qtr
Tatak SGLG 50% of municipalities and the province are SGLG passers
50 % of municipalities and the province are
possible SGLG Passers
50 % of municipalities and the province are possible SGLG Passers
DILG-BENGUET COMMITMENT
Commitment (Tatak)
2014 Targets Accomplishment (As of June 15, 2014)
2nd Sem Targets
3rd Qtr 4th Qtr
Tatak Disaster-Resilient and Climate Change Adaptive
• 50% of municipalities have formulated and are implementing DRRM & CCA Plans
-Municipalities (w/ DRRM Plan): 11/13 (w/o DRMM Plan: Kabayan & Kibungan)
2/13 (Kabayan & Kibungan)
Pag
e19
• 50% of municipalities are capacitated and have developed LCCAP
-Municipalities (w/ CCA Plan): 2/13 (w/ LCCA Plan: Tuba & Tublay)
11/13 (Atok, Bakun, Bokod, Buguias, Itogon, Kabayan, Kapangan, Kibungan, La Trinidad, Mankayan & Sablan)
DILG-IFUGAO COMMITMENT
Commitment (Tatak)
2014 Targets Accomplishment
(As of June 15, 2014)
2nd
Sem Targets
3rd
Qtr 4th
Qtr
Business-Friendly and Competitive LGU
4 municipalities (Banawe, Lamut, Lagawe, Kiangan) have: - Streamlined regulatory
services
Banaue, Lagawe, Lamut, Kiangan
- Formulated/ updated LIIC, LRC, Business Plan
Banaue, Lagawe, Lamut, Kiangan
- Updated Schedule of Market Values
Lagawe Banaue & Lamut Kiangan
Formulated/ updated local policies
Banaue, Lagawe, Lamut, Kiangan
DILG-KALINGA COMMITMENT
Commitment (Tatak)
2014 Targets Accomplishment
(As of June 15, 2014)
2nd
Sem Targets
3rd
Qtr 4th
Qtr
Conflict-Sensitive Friendly LGU
Tabuk City
Institutionalized "Matagoan Bodong Council“in Tabuk City as a way to settle disputes among tribes composed of a representative of all tribal leaders/elders living in Tabuk City.
Lubuagan, Pasil, Tinglayan
Tinglayan, Pinukpuk
Pag
e20
Balbalan, Pinukpuk, Lubuagan, Pasil, Tinglayan
Other Targets
•50% of LGUs have set up mediation and healing mechanism
Coordinated with the Apostolic Vicariate of Tabuk City for victims of crimes and tribal conflict for healing and mediation.
DILG-MT PROVINCE COMMITMENT
Commitment (Tatak)
2014 Targets Accomplishment
(As of June 15, 2014)
2nd
Sem Targets
3rd
Qtr 4th
Qtr
IP/Community Participation in Local Governance
70% of all municipalities , 1 Province, 144
Barangays
1 province, 10 municipalities, 130 Barangays
All municipalities All municipalities
50% of P/M SGLG Passers
(No SGLG results yet)
30% of the Municipalities
have organized IPOs
30% of the Municipalities have organized IPOs
(Sagada, Barlig, Sabangan)
50% of all disputes are settled amicably thru indigenous systems
ongoing
Report to be submitted
Organization of Indigenous People’s Organizations
Report on organized IPOs submitted to RO
IV. DEMAND-DRIVEN PROJECTS / ACTIVITIES
Support to Regional Autonomy through IEC (funded by RDC-CAR)
Thirty-eight municipalities and the Tabuk City have conducted IEC on
regional autonomy this semester.
Pag
e21
Community-based Monitoring System
DILG-CAR continues to provide technical assistance to requesting local
governments in the conduct of their CBMS. At least 51 LGUs were assisted this first
semester.