    What is SCADA..??y SCADA is Supervisory Control and Data Acquisition real

    time industrial process control systems used to centrally

    monitor and control remote or local industrial equipment such

    as motors, valves, pumps, relays, sensors, etc.

    y SCADA is used to control chemical plant processes, oil and gas

    pipelines, electrical generation and transmission equipment,

    manufacturing facilities, water purification and distribution

    infrastructure, etc.

  • 8/6/2019 1x6 Mw Captive Power Plant Using Scada

    3/12

    Objectivey To study the basic design parameter for 1x6 MW Captive

    power plant using scada.

    y Describe typical architecture of 1x6 MW captive power.

    y To plan & build up adequate capacities in generation,

    transmission and distribution of power through efficient

    and cost effective means.

    y To achieve utilization of existing equipments and assets

    through renovation and modernization.

  • 8/6/2019 1x6 Mw Captive Power Plant Using Scada

    4/12

    List of ActivitiesActivity 1 2 3 4 5 6 7 8 9 10

    Preparation ofproject

    synopsis

  • 8/6/2019 1x6 Mw Captive Power Plant Using Scada

    5/12

    Function of Scada System in Captive Power

    Planty Periodic Monitoring and logging of data such as frequency,

    voltage, current, etc. from electrical auxiliaries

    y Classification of alarms in order of priority and providing

    annunciations at the time of events

    y Displaying status of isolators, breakers and single linediagram of various systems in switch yard

    y Controlling circuit breakers and Isolators in switch yard .

    yData Acquisition

    y Data Transmission

  • 8/6/2019 1x6 Mw Captive Power Plant Using Scada

    6/12

    Features of Scada System in Power Planty Real Time and Historical Trend.y Alarmsy Recipe Managementy

    Secu

    rityy Device Connectivity

  • 8/6/2019 1x6 Mw Captive Power Plant Using Scada

    7/12

    Components of Scada Systemy Man Machine Interface (MMI):

    Man Machine Interface is process and display units from where the data is

    process and displayed to the operator for monitoring and control by

    human. It is also called Human Machine Interface.y Remote Terminal Units (RTU):

    Remote Terminal Units are located at the process side of the plant. They

    are connected to the sensors in process and data is converted from sensor

    signal to digital data and sends to the Supervisory control. In simple, RTU is

    a micro controller and located at the remote side of the process systemtheir objective is to collect data from process side and deliver to

    Supervisory control

  • 8/6/2019 1x6 Mw Captive Power Plant Using Scada

    8/12

    y Programmable Logic Controller (PLCs):

    PLCs are more versatile than RTUs and does the job ofRTUs and also

    control the process when command receive from supervisory control.

    y Communication System:

    These are the software protocols used for transferring the data from the

    supervisory control to RTU and vise-versa.

    y Supervisory Controller:

    This is the master controller of the System which receives the data from

    RTUs and PLCs, monitors the data, process the data display data to

    operator via HMI or MMI and gives command signal to RTUs and PLCs to

    carry out certain operation.

  • 8/6/2019 1x6 Mw Captive Power Plant Using Scada

    9/12

    Communication in Scada System

  • 8/6/2019 1x6 Mw Captive Power Plant Using Scada

    10/12

    SCADASecurityy The industry has generated a large base of relatively insecure

    systems, with chronic and pervasive vulnerabilities that have

    been observed during security assessments.

    y Security for SCADA is typically five to ten years behind typical

    information technology (IT) systems

  • 8/6/2019 1x6 Mw Captive Power Plant Using Scada

    11/12

    Place /equipment and tools requiredy Computer for preparation of reports and searching of

    related study materials from internet.

    yMS excel software to prepare cost module.

    y Design handbook e.g. 'Electrical substation-Engineering & Practice by Sunil S Rao.