2 Anr Sard by Tmatsuo 19feb2016

Embed Size (px)

Citation preview

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    1/16

    7th ADB Business Opportunities Fair 

    16 March 2016

    Environment, Natural Resourcesand Agriculture  – South Asia

    By: Takashi Matsuo

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    2/16

    Country Strategy

    BANGLADESH

    Country Partnership Strategy, 2011-2015 

    Country Operations Business Plan, 2016-2018 

    -- supporting the government's Seventh Five-Year Plan (FY2016-2020)

    * climate resilience through support for integrated water resource management

    * rural infrastructure development

    * flood control and riverbank erosion mitigation

    * crop and value chain infrastructure

    * irrigation system infrastructure

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    3/16

    Country Strategy

    INDIA

    Country Partnership Strategy, 2013-2017 

    Country Operations Business Plan, 2016-2018 

    -- supporting the government's Twelfth Five-Year Plan

    * agribusiness

    * agricultural policy, institutional reforms, and capacity development

    * surface and groundwater irrigation

    * irrigation systems management

    * flood-risk management

    * marine ecosystem and coastal resources

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    4/16

    Country Strategy

    NEPAL

    Country Partnership Strategy, 2013-2017 

    Country Operations Business Plan, 2016-2018 

    -- supporting the government's Three-Year Plan* irrigation and drainage

    * water-based natural resource management

    * agricultural policy, institutional reforms, and capacity development

    * flood protection

    * public-private partnerships

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    5/16

    Country Strategy

    SRI LANKA

    Country Partnership Strategy, 2012-2016 

    Interim Country Partnership Strategy, 2015-2016 

    Country Operations Business Plan, 2016-2018 

    -- supporting the government's development policy framework

    * new, rehabilitated, and modernized irrigation schemes

    * water resources management

    * fisheries production

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    6/16

     Active Loan & Grant Portfolio

    Bangladesh$444M 40%

    India $295M26%

    Nepal $230M21%

    Sri Lanka$151M 13%

     As of 16 March 2016

    Total of 39 loans and grants

    49% of projects administered by

     ADB Resident Missions

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    7/16

    Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are

    subject to change.

    2016 Lending Pipeline

    Country Project NameAmount

    ($M)Source

    Firm1 BAN Rural Infrastructure Maintenance Program (PDA) 2.0 ADF

    2 BAN Crop Diversification and Value Chain Infrastructure Development

    (PDA)

    2.0 ADF

    3 IND Assam Integrated Flood and River Erosion Management (Tranche 2) 70.1 OCR

    4 IND Climate Adaptation in Vennar Sub-basin in Cauvery Delta 101.0 OCR

    5 IND Sustainable Coastal Protection & Management Investment Program(Tranche 2) 75.0 OCR

    6 SRI Mahaweli Water Security Investment Program (Tranche 2) 80.0 OCR

    50.0 ADF

    Standby6 IND National Water Use Efficiency Improvement Project (TA loan) 15.0 OCR

    7 IND Agribusiness Infrastructure Development Investment Program

    (Tranche 3)

    15.0 OCR

    8 NEP Agriculture Sector Development Program 50.0 ADF

    9 NEP Bagmati River Basin Improvement (Additional Financing) 40.0 ADF

    Total 2016 (excluding standby) 380.1

    Total 2016 (including standby) 500.1

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    8/16

    2017 Lending Pipeline

    Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines

    are subject to change.

    Country Project NameAmount

    ($M)Source

    1 BAN Rural Infrastructure Maintenance Program 130.0 OCR

    50.0 ADF

    2 BANFlood and Riverbank Erosion Risk Management Investment Program

    (Tranche 2) 100.0 ADF

    3 BHU Amochhu River Training and Flood Protection 15.0 ADF

    45.0 OCR

    4 IND Agribusiness Infrastructure Development Investment Program

    (Tranche 3)15.0 OCR

    5 INDKarnataka Integrated and Sustainable Water Resource Management

    Investment Program (Tranche 2) 119.0 OCR

    6 IND Madhya Pradesh Irrigation Efficiency Investment Program (Tranche 1) 315.0 OCR

    7 MLD Laamu Gan-Fonadhoo Community Connectivity Project 15.7 ADF

    8 NEP Bagmati River Basin Improvement (Additional Financing) 40.0 ADF

    9 NEP Large Scale Irrigation Scheme in Terai (PDA) 2.0 ADF

    Total 2017 846.7

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    9/16

    2016 Non-Lending Pipeline

    Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are

    subject to change.

    Country Project NameAmount

    ($M)Source

    1 BAN PPTA: Preparing Ganges-Kobadak and Teesta Barrage 0.2 TASF-V

    2 BHU CDTA: Improving Agribusiness (One Village One Product) 0.5 TASF-V

    3 BHU PPTA: Amochhu River Training and Flood Prevention Project 0.5 TASF-V

    4 NEP CDTA: Implementation of Water Resource Commission Act 0.5 TASF-V

    Total 2015 1.7

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    10/16

     Areas of Business Opportunities

    CONSULTING SERVICES

    * project preparation

    * project design

    * institutional reforms and capacity building

    * project implementation and management support

    PHYSICAL WORKS

    * irrigation facilities

    * river training

    * flood protection* dam and channels

    * coastal protection

    * rural roads

    * agribusiness infrastructure

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    11/16

    Opportunities

    Estimate

    ($ million)Method

    BangladeshIrrigation Management Improvement Project

      3.1 NCB

      13.5 ICB

    (3 packages)

      4.0 NCB

    Flood and Riverbank Erosion Risk Management Investment Program (Tranche1)  6.0 ICB

      5.2 NCB

      12.4 NCB

    (5 packages)

      3.6 NCB

    (2 packages)

    Southwest Area Integrated Water Resource Planning and Management Project - Additional Financin

      6.6 NCB

      1.3 NCB

      2.6 NCB

      4.8 NCB

      1.6 NCB

    Riverbank protection works

    Works Packages

    Embankment construction or resectioning

    Khal (canal) re-excavation

    Construction of PMP, SMO and WMO office buildings

    Embankment construction/rehabilitation

    Emergency riverbank protection

    Construction and/or rehabilitation of water management structures

    Local riverbank protection works

    Upgrading of electrical distribution

    Farmer distribution, pumps and prepayment meters-stage 2: 5,000 ha

    New structures, rehabilitation of structures, rehabilitation of BWDB buildings

    Geobags

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    12/16

    Opportunities

    Estimate($ million)

    Method

    India

    Orissa Integrated Irrigated Agriculture& Water Management Project - Tranche 2

     Various NCB

    Sustainable Coastal Protection and Management - Tranche 2

     Various ICB / NCB

    Nepal

    Bagmati River Basin Improvement Project

    17.2 ICB

    Works Packages

    Civil works packages for rehabilitation, extension and modernization of canal

    embankments

    Construction of Upper Bagmati River Environment Improvement Works

    For approval in 2016; civil works on shoreline protection and management

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    13/16

    Opportunities

    Estimate

    ($ million)

    Method

    Sri Lanka

    Mahaweli Water Security Investment Program - Tranche 1

    5.6 ICB

    1.3 NCB

    24.8 ICB21.4 ICB

    5.6 NCB

    48.0 NCB

    5.2 NCB

    2.4 NCB

    1.4 ICB

    Heightening of Minipe Anicut Including Water Control & Measurement

    Facilities for LB & RB Canals

    Rehabilitation of Minipe LB Canal from 30+140 km to 49+820 km - stage 2

    Construction of Upper Elahera Canal From 0+100 km to 6+226 kmConstruction of Main Canal from Nebadagahawatta Wewa to Mahakitula

    Wewa

    Works Packages

    Construction of Mahakithula Inlet Tunnel, Mahakithula & Mahakirula

    Reservoirs, Feeder Canal Length 3.66 km from Mahakithula to Mahakirula

    Reservoir

    Rehabilitation of Minipe LB Canal from 49+820 km to 63+650 km - stage 3

    Rehabilitation of Minipe LB Canal from 63+650 to 73+960km - stage 4

    Irrigation Control Gates

    Wemedilla LBMC from 0+000 Km to 5+250 km & New Sluice and Tail Canal

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    14/16

    Opportunities

    Estimate

    ($ million) Method

    Bhutan

    Amochhu River Training and Flood Prevention Project

    Improving Agribusiness (One VillageOne Product)

    Nepal

    Water Resources Project Preparatory Facility

    0.4 QCBS

    Sri Lanka

    Mahaweli Water Security Investment Program - Tranche 1

    1.4 QCBSImproving System Efficiencies and Water Productivity Consultants

    Consulting Services Packages

    Preparing Flood Risk Management Projects

    For approval in 2016; consulting services packages to be determined.

    For approval in 2016; consulting services packages to be determined.

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    15/16

    Contact Us

    ENVIRONMENT, NATURAL RESOURCES

    AND AGRICULTURE DIVISION (SAER)

    SOUTH ASIA DEPARTMENT

    INDIA RESIDENT MISSION

    M. Teresa Kho

    Country [email protected]

    L. Boenwanan Sondjaja

    Deputy Country Director

    [email protected]

    Takashi Matsuo

    Director

    [email protected]

    Cindy Malvicini

    Principal Portfolio Management Specialist

    [email protected] RESIDENT MISSION

    BANGLADESH RESIDENT MISSION   Kenichi YokoyamaCountry Director

    [email protected]

    Tika Limbu

    Portfolio Management Specialist

    [email protected]

    Kazuhiko Higuchi

    Country Director

    [email protected]

    Oleg Tonkonjenkov

    Deputy Country Director

    [email protected] SRI LANKA RESIDENT MISSION

    BHUTAN RESIDENT MISSION   Sri WidowatiCountry Director

    [email protected]

    Taisuke Miyao

    Senior Portfolio Management Specialist

    [email protected]

    Tshewang Norbu

    Senior Country Coordination Officer

    [email protected]

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]

  • 8/19/2019 2 Anr Sard by Tmatsuo 19feb2016

    16/16

    THANK YOU