Upload
daniel-chiriac
View
341
Download
6
Embed Size (px)
Citation preview
Notice:
The information contained within this document is based on the laboratrial experiment. The use of the information contained within this document is at reader’s risk and no warranty is implied or expressed by JFE Steel Corporation with respects to the use of information herein.
JFE Steel Corporation
Design Feature of JFEBEAR
Contoured
Metal to Metal Seal
JFEBEAR Thread Profile (1)
-5° 25°
Coupling
Pipe
Optimized Gap
Optimized Gap Concept
×○Anti Galling
Capability
○×Compression Capability
Narrow
Gap
○
○
Optimized
Gap
Wide
Gap
-5° 25°
Coupling
Pipe
Gap
JFEBEAR Compression resistance
Seal
Optimized G ap
Stab Flank absorbsCompression
Reduced NoseDeformation
No Leak
DesignMake-up
Compression
Tension
Seal
Thread
KSBEAR Thread Profile (2)
PIPE
Coupling
Pipe
Negative load flank
-5° 25°
Different Corner Radius on Load Flanks on Pipe and Coupling Threads
Excellent Thread Galling Resistance
JFEBEAR Seal Profile
Coupling
Pipe
ContouredMetal to Metal Seal
Reduced Local Stress Concentration
Excellent Seal Galling Resistance
Summary of Design Features
Optimized Gap Between Stabbing Flanks on Pipe and Coupling Threads
Different Corner Radius on Load Flanks of Pipe and Coupling Threads
Excellent Compression Capability
Excellent Galling Resistance
Contoured Metal to Metal
Results in high compression capability while maintaining excellent galling resistance
- Benefit -- Design -
Specimen #1 #2 #3 #4 #5 #6 #7 #8
Thd/ Seal H / L L / L H / H L / H H / L H / L L / H L / HTaper PS BF PS BF Nom Nom PF BS PS BF PS BF PF BS PF BS
Make&Break MU(A) MU(A) MU(A) MU(A) MU(A) MU(A) MU(A) MU(A)H / L H / H H / H H / H H / L H / H H / L H / L
dope/ torqueRRG(B) RRG(B) RRG(B) RRG(B)L / H L / H L / H L / H
MBG(B) MBG(B) MBG(B) MBG(B)L / H L / H L / H L / H
FMU(B) FMU(B) FMU(B) FMU(B) FMU(B) FMU(B) FMU(B) FMU(B)H / L H / H H / H H / H H / L H / H H / L H / L
Bake Bake Bake Bake Bake Bake Bake Bake Bake
Series A T/ C T/ C T/ C T/ C pi/ po pi/ po pi/ po pi/ po
Series B T/ C pi T/ C pi T/ C pi T/ C piw Bend w Bend w Bend w Bend
Series C Thermal Thermal Thermal Thermal cycle cycle cycle cycle
ISO-13679 CAL4 Test Program
Galling Resistance on Make & Break Test
Specimen #2 #3 #4 #5 #6 #7 #8
Thd/ Seal L / L H / H L / H H / L H / L L / H L / HTaper PS BF Nom Nom PF BS PS BF PS BF PF BS PF BS
Make&Break RRG(B) RRG(B) RRG(B) RRG(B)L / H L / H L / H L / H
dope/ torqueMBG(B) MBG(B) MBG(B) MBG(B)L / H L / H L / H L / H
Make & Break test on ISO-13679 CAL IV
4
9
Number of Make&Break
Specimen #3B : Totally 13 times Makes & Breaks
Specimen #3B after 13th Make&Break test (HP2-110 4-1/2”x15.1#)
HP2-13CR-110ksi 4-1/2"x15.1# KSBEARVME Pipe and Connection Service Envelope
-20 00 0
-15 00 0
-10 00 0
-5 00 0
0
5 00 0
10 00 0
15 00 0
20 00 0
-8 00 00 0 -6 00 00 0 -4 00 00 0 -2 00 00 0 0 2 00 00 0 4 00 00 0 6 00 00 0
Compression Load lb (F) x 1000 Te nsion
Exte
rnal
Pres
sure
(ps
i)
In
tern
al
10 0% Pipe Bo dy VME AP I Co llapse 9 5% Pipe Bo dy VME ISO 9 5% Co nn ection Lo ad Env elop e
JFEBEAR Connection Physical Envelopeproved on ISO-13679 CAL4 Test
HP2-13CR 110ksi 4-1/2”x15.1#
ISO VME VS XOM VME JFE has prided them self's on testing to the most strenuous environments and
conditions No de-rated of any size or weight full Envelope
Exxon Load points
ISO Load Points
Exxon 50% Compression Limit
ISO 80% Compression Limit
13
JFEBEAR Test progress
Customer Procedure Size Grade ProgressProduct line testExxonMobil ExxonMobil spec. 6 sizes 3 1/ 2" 7"( ~ ) HP2-95 67%Shell Independent& NAM TEO spec. 3 sizes 5 1/ 2" 7"( ~ ) 13CR-80 100%Shell Independent& ISO 13679 CAL4 4 sizes 3 1/ 2", 4 1/ 2"( ) HP2-110 50%Spot testCOP/ Magnolia ISO 13679 CAL4 3 1/ 2"x9.2#, 4 1/ 2"x15.5# HP2-110 100%COP/ UK ISO 13679 CAL4 5 1/ 2"x23# HP2-110 100%Tarim/ China ISO 13679 CAL4 3 1/ 2"x9.2# HP1-110 100%Gazprom/ Russia Gazprom spec. 5 1/ 2"x17# 110L 100%ADCO/ UAE ADCO spec. 2 7/ 8" 7"~ L80 100%XOM/ Hibernia ExxonMobil spec. 7"x29# 13CR80 100%EPMI ExxonMobil spec. 3 1/ 2"x9.2# 13CR80 100%
Design and data reviewChevron Design and data review 2 7/ 8" 7"~ N/ A 100%SNEPCO/ Shell Design and data review 5 1/ 2"x20# 13CR-80 100%BP Design and data review 2 7/ 8" 7"~ N/ A 100%
Notice: The information contained within this document is based on the laboratorial experiment. The use of the information contained within this document is at reader's risk and no warranty is implied or expressed by JFE Steel Corporation with respects to the use of information herein.
Confidential
14
JFEBEAR Test progress
Notice: The information contained within this document is based on the laboratorial experiment. The use of the information contained within this document is at reader's risk and no warranty is implied or expressed by JFE Steel Corporation with respects to the use of information herein.
ConfidentialBEAR test status # OF rev 2 2008.03.18
Category Size Grade Test procedure sample# Comments
ISO 3 1/2" 9.2# HP2-110 ISO 13679 CAL4 80% compression 8 Initially tested for COP MagnoliaISO 3 1/2" 14.3# HP2-110 ISO 13679 CAL4 80% compression 8 Starting 09/08
ISO 4 1/2" 12.6# HP2-110 ISO 13679 with Shell modification 80%
compression
8 Combined procedure approved by
both Shell USA and UK was applied
ISO 4 1/2" 15.1# HP2-110 ISO 13679 CAL4 80% compression
8 Spot test for COP Magnolia
ISO 4 1/2" 18.9# HP2-110 ISO 13679 CAL4 80% compression
8 Starting 08/08
ISO 5 1/2" 23# HP2-110 ISO 13679 CAL4 80% compression
8
NAM 5 1/2" 23# 13CR80 NAM/TEO/3 with modification 80% compression
8 Spot test for COP UK, Clear Plate
+API mod was applied
NAM 7" 29# 13CR80 NAM/TEO/3 with modification 80%
compression
8
NAM 7" 35# 13CR80 NAM/TEO/3 with modification 80%
compression
8
ExxonMobil 3 1/2" 7.7# HP2-95 ExxonMobil spec. 7 On Going
ExxonMobil 3 1/2" 14.3# HP2-95 ExxonMobil spec. 7 Completed
ExxonMobil 5 1/2" 17# HP2-95 ExxonMobil spec. 7 Completed
ExxonMobil 5 1/2" 23# HP2-95 ExxonMobil spec. 7 Completed
ExxonMobil 7" 26# HP2-95 ExxonMobil spec. 7 Completed
ExxonMobil 7" 32# HP2-95 ExxonMobil spec. 7 Completed
ExxonMobil 7" 29# 13CR80 ExxonMobil spec. 7 Spot test for Hibernia
ExxonMobil 3 1/2" 9.2# 13CR80 ExxonMobil spec. 7 Spot test for EPMI
Clear Run 5 1/2" 23# HP2-110 Abbreviated ISO 13679 80% compression
2 HL, LH were tested with ISO A
Clear Run 2 7/8" 7.8# HP1-110 Abbreviated ISO 13679 80% compression
1 HL was tested with ISO A
Clear Run 2 3/8" 4.6# 13CR80 Abbreviated ISO 13679 80% compression
1 HL was tested with ISO B
15
JFEBEAR Test progress
Notice: The information contained within this document is based on the laboratorial experiment. The use of the information contained within this document is at reader's risk and no warranty is implied or expressed by JFE Steel Corporation with respects to the use of information herein.
Confidential
; Done
; To be done
Category Size Grade Test procedure sample# Comments
Clear Run 5 1/2" 23# HP2-110 Abbreviated ISO 13679 80% compression
2 HL, LH were tested with ISO A
Clear Run 2 7/8" 7.8# HP1-110 Abbreviated ISO 13679 100% compression
1 HL was tested with ISO A
Clear Run 2 3/8" 4.6# 13CR80 Abbreviated ISO 13679 80% compression
1 HL was tested with ISO B
Clear Run 4 1/2" 12.6# HP2-110 Abbreviated ISO 13679 80% compression
1 HL was tested with new ISO A, B elevated temp. B ambient temp. and C
Clear Run 3 1/2" 9.2# 13CR80 ExxonMobil spec. 1 HL was tested with XOM sample #5&6 conditions.