 Pekerjaan : REHABILITASI RUANG KELAS RUSAK BERAT SD Luas Bangunan dan Teras : 3X64 m2 Tahun Anggaran : 2012 Lokasi : XX IKK Kabupaten/Kota : XX IKK Nasional : XX : XX : #VALUE! I Rp. 648,000.00 II Rp. 4,962,945.60 III Rp. 0.00 IV Rp. 9,204,427.70 V Rp. 3,892,649.92 VI Rp. 22,681,651.50 VII Rp. #VALUE! VIII Rp. 27,734,740.00 IX Rp. #VALUE! X Rp. 2,452,600.00 XI Rp. #VALUE! XII Rp. #VALUE! Rp. #VALUE! XIII Rp. 15,000,000.00 Rp. #VALUE! PEKERJAAN KUSEN, DAUN PINTU & JENDELA PEKERJAAN RANGKA ATAP & PENUTUP ATAP REHABILITASI MEUBELAIR UNTUK 3 (TIGA) RUANG TOTAL PEKERJAAN LISTRIK PEKERJAAN KUNCI & PENGGANTUNG PEKERJAAN LANTAI/PASANG KERAMIK JUMLAH REKAPITULASI RENCANA ANGGARAN BIAYA NO URAIAN PEKERJAAN JUMLAH HARGA PEKERJAAN LANGIT-LANGIT PEKERJAAN CAT Tingkat Kerusakan Biaya Rehabilitasi Sekolah PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI PEKERJAAN BETON PEKERJAAN PASANGAN & PLESTERAN

2. Laporan Mingguan_4_OK

Embed Size (px)

Citation preview

Page 1: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 1/39

Pekerjaan : REHABILITASI RUANG KELAS RUSAK BERAT SD

Luas Bangunan dan Teras : 3X64 m2

Tahun Anggaran : 2012

Lokasi : XX

IKK Kabupaten/Kota : XX

IKK Nasional : XX

: XX

: #VALUE!

I Rp. 648,000.00

II Rp. 4,962,945.60

III Rp. 0.00

IV Rp. 9,204,427.70V Rp. 3,892,649.92

VI Rp. 22,681,651.50

VII Rp. #VALUE!

VIII Rp. 27,734,740.00

IX Rp. #VALUE!

X Rp. 2,452,600.00

XI Rp. #VALUE!

XII Rp. #VALUE!

Rp. #VALUE!

XIII Rp. 15,000,000.00

Rp. #VALUE!

PEKERJAAN KUSEN, DAUN PINTU & JENDELA

PEKERJAAN RANGKA ATAP & PENUTUP ATAP

REHABILITASI MEUBELAIR UNTUK 3 (TIGA) RUANG

TOTAL

PEKERJAAN LISTRIK

PEKERJAAN KUNCI & PENGGANTUNG

PEKERJAAN LANTAI/PASANG KERAMIK

JUMLAH

REKAPITULASI RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN LANGIT-LANGIT

PEKERJAAN CAT

Tingkat Kerusakan

Biaya Rehabilitasi Sekolah

PEKERJAAN PERSIAPAN

PEKERJAAN TANAH

PEKERJAAN PONDASI

PEKERJAAN BETONPEKERJAAN PASANGAN & PLESTERAN

Page 2: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 2/39

1 Pondasi batu kali/gunung

2 Struktur beton bertulang

3 Dinding batu bata/batako diplester finishing cat

4 Rangka atap kayu kelas II

5 Penutup atap genteng

6 Plafon eternit + list kayu

7 Kosen kayu kelas II

8 Daun pintu kayu kelas II

9 Daun jendela kayu kelas II10 Kaca polos 5 mm

11 Lantai keramik dalam 30x30 KW I (polos)

12 Lantai karamik teras 30x30 KWI (polos)

13 Bangunan anti rayap

SPESIFIKASI BANGUNAN

Page 3: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 3/39

Luas Bangunan : 64 m2 (Ruang Kelas dan Selasar)

Ukuran Bangunan : 7 x 8m (Ruang Kelas)

2 x 8m (Selasar)

Luas Bangunan : 64 m2 (Selasar dihitung 0,5 kalinya)

Metode Pelaks. : Swakelola

Fisik Bangunan :

Meubelair :

Total Biaya :

Jangka Waktu Pelaksanaan: 105 hari kalender

#REF!

#REF!

13,750,000.00Rp

IKK = 100 = 1 (NASIONAL)

REHABILITASI RUANG KELAS RUSAK BERAT SD

RENCANA ANGGARAN BIAYA (RAB)

 KEMENTERIAN PENDIDIKAN DAN KEBUDAYAANDIREKTORAT JENDERAL PENDIDIKAN DASARDIREKTORAT PEMBINAAN SEKOLAH DASAR

Page 4: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 4/39

 

Page 5: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 5/39

Page 6: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 6/39

Page 7: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 7/39

Page 8: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 8/39

Page 9: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 9/39

Page 10: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 10/39

Page 11: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 11/39

Pekerjaan : Rehabilitasi Ruang Kelas Minggu ke : 4

Nama Sekolah : ......................................... Tanggal : 23 s/d 28 April 2

Lokasi : Jl. .................................... Bulan : April

Desa .................. Kec.......

Kab./Kota............ Prov......

Prestasi Rerata Prestasi Rera

(1) (2) (3) (4) (5) (6) (6)/100x(5) (8) (8)/100

I PEKERJAAN PERSIAPAN1 Pengukuran dan pas. Bouwplank m1

2 Pembersihan Lokasi/Bongkaran 216.000 m2 #VALUE! 50.00 #VALUE! 0.00 #VALU

II PEKERJAAN TANAH

1 Gali tanah pondasi induk (0.70X1.00), L=76m m3

2 Gali tanah pondasi teras (0.50X0.60), L=24m m3

3 Urug pasir bawah pondasi, t=10 cm m3

4 Urugan pasir bawah lantai, t=10cm 21.600 m3 #VALUE! 0.00 #VALUE! 0.00 #VALU

5 Urug tanah kembali m3

6 Rabatan bawah lantai, t=5cm 21.600 m2 #VALUE! 0.00 #VALUE! 0.00 #VALU

7 Anti rayap 216.000 m2 #VALUE! 0.00 #VALUE! 0.00 #VALU

III PEKERJAAN PONDASI

1 Pas. Batu kosongan m3

2 Pas. Pondasi batu kali m3

IV PEKERJAAN BETON

1 Pekerjaan Balok Sloof (12x20)cm, L=76

a. Beton m3

b. Bekisting m2

c. Pembesian kg

2 Pek. Balok latei (12x12)cm, L=48m

a. Beton 0.691 m3 #VALUE! 100.00 #VALUE! 0.00 #VALU

b. Bekisting 19.200 m2 #VALUE! 100.00 #VALUE! 0.00 #VALU

c. Pembesian 86.400 kg #VALUE! 100.00 #VALUE! 0.00 #VALU

3 Pek. kolom beton (15x20)cm, h=4.00m, 34bh

a. Beton m3

b. Bekisting m2

c. Pembesian kg

4 Pek. balok ring, gewel & konsol teras (12x20)

a. Beton 1.536 m3 #VALUE! 100.00 #VALUE! 0.00 #VALUb. Bekisting 22.800 m2 #VALUE! 100.00 #VALUE! 0.00 #VALU

c. Pembesian 192.000 kg #VALUE! 100.00 #VALUE! 0.00 #VALU

V PEKERJAAN PASANGAN & PLESTERAN

1 Pas. Dinding 1/2 bata, 1:3, h=30 cm, L=76 m2

2 Pas. Dinding 1/2 bata, 1:6 48.800 m2 #VALUE! 100.00 #VALUE! 0.00 #VALU

3 Plesteran 1 : 3, tebal 15 mm m2

4 Plesteran 1 : 6, tebal 15 mm 73.100 m2 #VALUE! 0.00 #VALUE! 0.00 #VALU

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

No. Jenis Pekerjaan Volume

LAPORAN MINGGUAN

SatuanBobot

Pekerjaan

%

Dana diterima tanggal

Besar Dana:

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

Prestasi pekerjaan

Minggu lalu (%)

Prestasi pekerja

Minggu Ini (%

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

TIDAK DIKERJAKAN

Page 12: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 12/39

VI PEKERJAAN KUSEN, DAUN PINTU & JENDELA

1 Kusen pintu dan jendela 1.473 m3 #VALUE! 100.00 #VALUE! 0.00 #V

2 Pas. pintu panil 7.560 m2 #VALUE! 0.00 #VALUE! 0.00 #V

3 Pas. Jendela kaca 21.591 m2 #VALUE! 0.00 #VALUE! 0.00 #V

4 Pasang kaca 5 mm 29.400 m2 #VALUE! 0.00 #VALUE! 0.00 #V

VII PEKERJAAN RANGKA ATAP & PENUTUP ATAP

Atap genteng

1 Kuda-kuda Kayu 8/12 1.613 m3 #VALUE! 50.00 #VALUE! 50.00 #V

2 Gording Kayu 8/12 1.498 m3 #VALUE! 0.00 #VALUE! 50.00 #V

3 Usuk kayu 5/7, Reng 3/4 330.254 m2 #VALUE! 0.00 #VALUE! 50.00 #V

4 Pasangan Lisplang 2/20 130.000 m' #VALUE! 0.00 #VALUE! 50.00 #V

5 Penutup atap Genting kodok 330.254 m2 #VALUE! 0.00 #VALUE! 0.00 #V

6 Pasang Genting Bubungan bulat 26.000 m' #VALUE! 0.00 #VALUE! 0.00 #V

VIII PEKERJAAN LANGIT-LANGIT

Langit-langit eternit 1.00X1.00

1 Pas. Rangka 1.00X1.00, Kayu 4/6 286.000 m2 #VALUE! 0.00 #VALUE! 0.00 #V

2 Pas. Plafon 286.000 m2 #VALUE! 0.00 #VALUE! 0.00 #V

3 Pas. List plafon 360.000 m1 #VALUE! 0.00 #VALUE! 0.00 #V

IX PEKERJAAN CAT

1 Melabur Kayu Atap dengan residu 330.254 m2 #VALUE! 0.00 #VALUE! 0.00 #V

2 Pengecatan Dinding 73.100 m2 #VALUE! 0.00 #VALUE! 0.00 #V

3 Pengecatan Plafon 286.000 m2 #VALUE! 0.00 #VALUE! 0.00 #V

4 Pengecatan Kayu 96.000 m2 #VALUE! 0.00 #VALUE! 0.00 #V

X PEKERJAAN LISTRIK

1 Pas. Instalasi titik lampu 24.000 Ttk #VALUE! 0.00 #VALUE! 0.00 #V

2 Pas. Instalasi Stop Kontak 3.000 ttk #VALUE! 0.00 #VALUE! 0.00 #V

3 Pas. Sakelar tunggal 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V

4 Pas. sakelar ganda 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V

5 Pas. Lampu TL 20 w 4.000 bh #VALUE! 0.00 #VALUE! 0.00 #V

6 Pas. lampu SL 18 w 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V

XI PEKERJAAN KUNCI & PENGGANTUNG

1 Pas. Kunci tanam 2 xputar 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V2 Pas. Engsel jendela 3" 72.000 bh #VALUE! 0.00 #VALUE! 0.00 #V

3 Pas. engsel pintu 4" 18.000 bh #VALUE! 0.00 #VALUE! 0.00 #V

4 Pas. Grendel pintu 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V

5 Pas. Grendel jendela 36.000 bh #VALUE! 0.00 #VALUE! 0.00 #V

6 Pas. Hak angin 72.000 bh #VALUE! 0.00 #VALUE! 0.00 #V

XII PEKERJAAN LANTAI/PASANG KERAMIK

1 Pas. Keramik lantai 30/30 216.000 m2 #VALUE! 0.00 #VALUE! 0.00 #V

XIII PEKERJAAN MEUBELAIR

1 Rehabilitasi Meubelair 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V

#VALUE! #VALUE! #V

Jaka

Mengetahui Menyetujui Dibu

Kepala Sekolah Pere

ttd

(stempel & ttd)

Nama terang Nama terang Nam

NIP NIP

Ketua Tim Pelaksana

Rehabilitasi Ruang Kelas

Jumlah dana yang digunakan sampai dengan minggu ini (minggu ke 4) 50,000,000.00Rp

JUMLAH

Page 13: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 13/39

 BIDANG B

1 1 m2 Membersihkan Lapangan dan Perataan

0.100 Org Pekerja @ Rp 30,000.00 = 3,000.00Rp

0.100 Org Mandor @ Rp - = -Rp

Jumlah = 3,000.00Rp

2 1 m' Pengukuran dan pemasangan bouwplank

1.2.1 Bahan

0.012 M³ Kayu 5/7 @ Rp 2,740,000.00 = 32,880.00Rp

0.020 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 180.00Rp

0.007 M³ Kayu papan 3/20 @ Rp 3,500,000.00 = 24,500.00Rp

Jumlah (1) = 57,560.00Rp

1.2.2 Tenaga

0.100 Org Pekerja @ Rp 30,000.00 = 3,000.00Rp

0.100 Org Tukang kayu @ Rp 45,000.00 = 4,500.00Rp

0.010 Org Kepala tukang @ Rp 50,000.00 = 500.00Rp

0.010 Org Mandor @ Rp - = -Rp

Jumlah (2) = 5,000.00Rp

Jumlah (1) + (2) = 62,560.00Rp

3 1 m³ Galian tanah keras sedalam 1 meter

2.1.1 Tenaga

0.625 Org Pekerja @ Rp 30,000.00 = 18,750.00Rp

0.062 Org Mandor @ Rp - = -Rp

Jumlah = 18,750.00Rp

4 1 m³ Urugan kembali

2.4.1 Tenaga

0.192 Org Pekerja @ Rp 30,000.00 = 5,760.00Rp

0.019 Org Mandor @ Rp - = -Rp

Jumlah = 5,760.00Rp

5 1 m³ Urugan pasir

2.6.1 Bahan

1.200 M³ Pasir urug @ Rp 75,000.00 = 90,000.00Rp

Jumlah (1) = 90,000.00Rp

2.6.2 Tenaga

0.300 Org Pekerja @ Rp 30,000.00 = 9,000.00Rp

0.010 Org Mandor @ Rp - = -Rp

Jumlah (2) = 9,000.00Rp

Jumlah (1) + (2) = 99,000.00Rp

6 1 m³ Pasang pondasi batu kosong

4.2.1 Bahan

1.200 M³ Batu belah 15/20 cm @ Rp 125,000.00 = 150,000.00Rp

0.300 M³ Pasir urug @ Rp 75,000.00 = 22,500.00Rp

Jumlah (1) 172,500.00Rp

4.2.2 Tenaga

0.780 Org Pekerja @ Rp 30,000.00 = 23,400.00Rp

0.390 Org Tukang batu @ Rp 45,000.00 = 17,550.00Rp

0.039 Org Kepala tukang @ Rp 50,000.00 = 1,950.00Rp

0.039 Org Mandor @ Rp - = -Rp

Jumlah (2) = 42,900.00Rp

Jumlah (1) + (2) = 215,400.00Rp

ANALISA BIAYA KONSTRUKSI

REHABILITASI RUANG KELAS RUSAK BERAT SD

Tahun 2012

Page 14: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 14/39

 BIDANG

7 1 m³ Pasang pondasi batu kali, 1 Pc :4 Ps

4.1.1 Bahan

1.100 M³ Batu belah 15/20 cm @ Rp 125,000.00 = 137,500.00Rp

163.000 Kg Semen portland @ Rp 1,160.00 = 189,080.00Rp

0.520 M³ Pasir pasang @ Rp 85,000.00 = 44,200.00Rp

Jumlah (1) 370,780.00Rp

4.1.2 Tenaga

1.500 Org Pekerja @ Rp 30,000.00 = 45,000.00Rp

0.600 Org Tukang batu @ Rp 45,000.00 = 27,000.00Rp

0.060 Org Kepala tukang batu @ Rp 50,000.00 = 3,000.00Rp

0.075 Org Mandor @ Rp - = -Rp

Jumlah (2) = 75,000.00Rp

Jumlah (1) + (2) = 445,780.00Rp

8 1 m² Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps

3.3.1 Bahan

70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp 350.00 = 24,500.00Rp

14.370 Kg Semen portland @ Rp 1,160.00 = 16,669.20Rp

0.040 M³ Pasir pasang @ Rp 85,000.00 = 3,400.00Rp

Jumlah (1) = 44,569.20Rp

3.3.2 Tenaga

0.320 Org Pekerja @ Rp 30,000.00 = 9,600.00Rp

0.100 Org Tukang batu @ Rp 45,000.00 = 4,500.00Rp

0.010 Org Kepala tukang @ Rp 50,000.00 = 500.00Rp

0.015 Org Mandor @ Rp - = -Rp

Jumlah (2) = 14,600.00Rp

Jumlah (1) + (2) = 59,169.20Rp

9 1 m² Pasangan bata merah tebal ½ bata, 1 Pc : 6Ps

3.4.1 Bahan

70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp 350.00 = 24,500.00Rp11.500 Kg Semen portland @ Rp 1,160.00 = 13,340.00Rp

0.043 M³ Pasir pasang @ Rp 85,000.00 = 3,655.00Rp

Jumlah (1) = 41,495.00Rp

3.4.2 Tenaga

0.320 Org Pekerja @ Rp 30,000.00 = 9,600.00Rp

0.100 Org Tukang batu @ Rp 45,000.00 = 4,500.00Rp

0.010 Org Kepala tukang @ Rp 50,000.00 = 500.00Rp

0.015 Org Mandor @ Rp - = -Rp

Jumlah (2) = 14,600.00Rp

Jumlah (1) + (2) = 56,095.00Rp

10 1 m² Plesteran 1 Pc : 3 Ps, tebal 15 mm7.1.1 Bahan

6.480 Kg Semen portland @ Rp 1,160.00 = 7,516.80Rp

0.019 M³ Pasir pasang @ Rp 85,000.00 = 1,615.00Rp

Jumlah (1) = 9,131.80Rp

7.1.2 Tenaga

0.200 Org Pekerja @ Rp 30,000.00 = 6,000.00Rp

0.150 Org Tukang batu @ Rp 45,000.00 = 6,750.00Rp

0.015 Org Kepala tukang @ Rp 50,000.00 = 750.00Rp

0.010 Org Mandor @ Rp - = -Rp

Jumlah (2) = 13,500.00Rp

Jumlah (1) + (2) = 22,631.80Rp

Page 15: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 15/39

 BIDANG

11 1 m² Plesteran 1 Pc : 6 Ps, tebal 15 mm

7.2.1 Bahan

0.520 Kg Semen portland @ Rp 1,160.00 = 603.20Rp

0.020 M³ Pasir pasang @ Rp 85,000.00 = 1,700.00Rp

Jumlah (1) = 2,303.20Rp

7.2.2 Tenaga

0.200 Org Pekerja @ Rp 30,000.00 = 6,000.00Rp

0.150 Org Tukang batu @ Rp 45,000.00 = 6,750.00Rp

0.015 Org Kepala tukang @ Rp 50,000.00 = 750.00Rp

0.010 Org Mandor @ Rp - = -Rp

Jumlah (2) = 13,500.00Rp

Jumlah (1) + (2) = 15,803.20Rp

12 1 m³ Pasang kusen pintu dan jendela kayu kelas II

5.2.1 Bahan

1.100 M³ Kayu Kelas II, balok @ Rp 5,000,000.00 = 5,500,000.00Rp

Jumlah (1) = 5,500,000.00Rp

5.2.2 Tenaga

6.000 Org Pekerja @ Rp 30,000.00 = 180,000.00Rp

18.000 Org Tukang kayu @ Rp 45,000.00 = 810,000.00Rp2.000 Org Kepala tukang @ Rp 50,000.00 = 100,000.00Rp

0.300 Org Mandor @ Rp - = -Rp

Jumlah (2) = 1,090,000.00Rp

Jumlah (1) + (2) = 6,590,000.00Rp

13 1 m² Pasang pintu panel kayu Kelas II

5.8.1 Bahan

0.040 M³ Kayu kelas II, papan @ Rp 5,500,000.00 = 220,000.00Rp

Jumlah (1) = 220,000.00Rp

5.8.2 Tenaga

1.000 Org Pekerja @ Rp 30,000.00 = 30,000.00Rp

2.500 Org Tukang kayu @ Rp 45,000.00 = 112,500.00Rp

0.250 Org Kepala tukang @ Rp 50,000.00 = 12,500.00Rp

0.050 Org Mandor @ Rp - = -Rp

Jumlah (2) = 155,000.00Rp

Jumlah (1) + (2) = 375,000.00Rp

14 1 m² Pasang jendela kaca kayu kelas II

5.10.1 Bahan

0.035 M³ Kayu kelas II, papan @ Rp 5,500,000.00 = 192,500.00Rp

Jumlah (1) = 192,500.00Rp

5.10.2 Tenaga

0.800 Org Pekerja @ Rp 30,000.00 = 24,000.00Rp2.000 Org Tukang kayu @ Rp 45,000.00 = 90,000.00Rp

0.200 Org Kepala tukang @ Rp 50,000.00 = 10,000.00Rp

0.040 Org Mandor @ Rp - = -Rp

Jumlah (2) = 124,000.00Rp

Jumlah (1) + (2) = 316,500.00Rp

Page 16: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 16/39

 BIDANG

15 1 m³ Pasang konstruksi kuda-kuda kayu kelas II

5.30.1 Bahan

1.100 M³ Kayu kelas II, balok @ Rp 5,000,000.00 = 5,500,000.00Rp

15.000 Kg Besi strip & baut @ Rp 13.300,00 = #VALUE!

0.800 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 7,200.00Rp

Jumlah (1) = #VALUE!

5.30.2 Tenaga

4.000 Org Pekerja @ Rp 30,000.00 = 120,000.00Rp

12.000 Org Tukang kayu @ Rp 45,000.00 = 540,000.00Rp

1.200 Org Kepala tukang @ Rp 50,000.00 = 60,000.00Rp

0.200 Org Mandor @ Rp - = -Rp

Jumlah (2) = 720,000.00Rp

Jumlah (1) + (2) = #VALUE!

16 1 m² Pasang usuk kayu kelas II+reng kayu kelas II

5.31.1 Bahan

0.008 M³ Kayu kelas II Usuk @ Rp 5,000,000.00 = 40,000.00Rp

0.007 M³ Kayu kelas II Reng @ Rp 5,000,000.00 = 35,000.00Rp

0.150 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 1,350.00Rp

Jumlah (1) = 76,350.00Rp

5.31.2 Tenaga

0.100 Org Pekerja @ Rp 30,000.00 = 3,000.00Rp

0.100 Org Tukang kayu @ Rp 45,000.00 = 4,500.00Rp

0.010 Org Kepala tukang @ Rp 50,000.00 = 500.00Rp

0.050 Org Mandor @ Rp - = -Rp

Jumlah (2) = 8,000.00Rp

Jumlah (1) + (2) = 84,350.00Rp

17 1 m² Pasang rangka langit-langit (1.00 x 1.00) m, kayu kelas III

5.40.1 Bahan

0.012 M³ Kayu Kelas III @ Rp 4,250,000.00 = 51,000.00Rp

0.100 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 900.00Rp

Jumlah (1) = 51,900.00Rp

5.40.2 Tenaga

0.150 Org Pekerja @ Rp 30,000.00 = 4,500.00Rp

0.250 Org Tukang kayu @ Rp 45,000.00 = 11,250.00Rp

0.025 Org Kepala tukang @ Rp 50,000.00 = 1,250.00Rp

0.075 Org Mandor @ Rp - = -Rp

Jumlah (2) = 17,000.00Rp

Jumlah (1) + (2) = 68,900.00Rp

18 1 m' Pasang lisplang ukuran (2 x 20) cm, kayu kelas II

5.48.1 Bahan0.0072 M³ Kayu kelas II, papan @ Rp 5,500,000.00 = 39,600.00Rp

0.050 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 450.00Rp

Jumlah (1) = 40,050.00Rp

5.48.2 Tenaga

0.100 Org Pekerja @ Rp 30,000.00 = 3,000.00Rp

0.200 Org Tukang kayu @ Rp 45,000.00 = 9,000.00Rp

0.020 Org Kepala tukang @ Rp 50,000.00 = 1,000.00Rp

0.050 Org Mandor @ Rp - = -Rp

Jumlah (2) = 13,000.00Rp

Jumlah (1) + (2) = 53,050.00Rp

Page 17: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 17/39

 BIDANG B

19 1 m' Pasang list plafon - kayu polos

5.60.1 Bahan

1.050 M' Kayu polos 1/5 @ Rp 9,900.00 = 10,395.00Rp

Jumlah (1) = 10,395.00Rp

5.60.2 Tenaga

0.021 Org Pekerja @ Rp 30,000.00 = 630.00Rp

0.021 Org Tukang kayu @ Rp 45,000.00 = 945.00Rp

0.002 Org Kepala tukang @ Rp 50,000.00 = 100.00Rp

0.001 Org Mandor @ Rp - = -Rp

Jumlah (2) = 1,675.00Rp

Jumlah (1) + (2) = 12,070.00Rp

20 1 m² Pasang atap lokal

6.2.1 Bahan

25.000 Bh Genteng @ Rp 3,000.00 = 75,000.00Rp

Jumlah (1) = 75,000.00Rp

6.2.2 Tenaga

0.150 Org Pekerja @ Rp 30,000.00 = 4,500.00Rp

0.075 Org Tukang kayu @ Rp 45,000.00 = 3,375.00Rp

0.008 Org Kepala tukang @ Rp 50,000.00 = 400.00Rp

0.008 Org Mandor @ Rp - = -RpJumlah (2) = 8,275.00Rp

Jumlah (1) + (2) = 83,275.00Rp

21 1 m' Pasang genteng bubungan

6.4.1 Bahan

3.500 Bh Genteng bubung @ Rp 3,500.00 = 12,250.00Rp

8.000 Kg Semen portland @ Rp 1,160.00 = 9,280.00Rp

0.032 M³ Pasir pasang @ Rp 85,000.00 = 2,720.00Rp

Jumlah (1) = 24,250.00Rp

6.4.2 Tenaga

0.400 Org Pekerja @ Rp 30,000.00 = 12,000.00Rp

0.200 Org Tukang kayu @ Rp 45,000.00 = 9,000.00Rp

0.020 Org Kepala tukang @ Rp 50,000.00 = 1,000.00Rp

0.020 Org Mandor @ Rp - = -Rp

Jumlah (2) = 22,000.00Rp

Jumlah (1) + (2) = 46,250.00Rp

22 1 m² Langit - langit eternit (1,00 x 1,00) m, tebal 3,5 mm

8.4.1 Bahan

1.100 Lbr Eternit tebal 3,5 mm @ Rp 7,000.00 = 7,700.00Rp

0.010 Kg Paku @ Rp 9,000.00 = 90.00Rp

Jumlah (1) = 7,790.00Rp

8.4.2 Tenaga

0.090 Org Pekerja @ Rp 30,000.00 = 2,700.00Rp

0.090 Org Tukang kayu @ Rp 45,000.00 = 4,050.00Rp0.009 Org Kepala tukang @ Rp 50,000.00 = 450.00Rp

0.040 Org Mandor @ Rp - = -Rp

Jumlah (2) = 7,200.00Rp

Jumlah (1) + (2) = 14,990.00Rp

Page 18: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 18/39

 BIDANG

23 1 m' Pasang talang datar, seng bjls 28

11.10.1 Bahan

0.500 m1

Seng plat 3"X6" bjls 28 @ Rp 22,500.00 = 11,250.00Rp

0.015 Kg Paku biasa ½" - 1" @ Rp 9,000.00 = 135.00Rp

0.0096 M³ Kayu Kelas II, papan @ Rp 5,000,000.00 = 48,000.00Rp

Jumlah (1) 59,385.00Rp

11.10.2 Tenaga

0.150 Org Pekerja @ Rp 30,000.00 = 4,500.00Rp

0.400 Org Tukang kayu @ Rp 45,000.00 = 18,000.00Rp

0.040 Org Kepala tukang @ Rp 50,000.00 = 2,000.00Rp

0.075 Org Mandor @ Rp - = -Rp

Jumlah (2) = 24,500.00Rp

Jumlah (1) + (2) = 83,885.00Rp

24 1 bh Pasang kunci tanam

11.1.1 Bahan

1.000 Bh Kunci tanam @ Rp 150,000.00 = 150,000.00Rp

Jumlah (1) = 150,000.00Rp

12.1.2 Tenaga

0.060 Org Pekerja @ Rp 30,000.00 = 1,800.00Rp

0.500 Org Tukang kayu @ Rp 45,000.00 = 22,500.00Rp0.060 Org Kepala tukang @ Rp 50,000.00 = 3,000.00Rp

0.030 Org Mandor @ Rp - = -Rp

Jumlah (2) = 27,300.00Rp

Jumlah (1) + (2) = 177,300.00Rp

25 1 bh Pasang engsel pintu

11.4.1 Bahan

1.000 Bh Engsel pintu @ Rp 12,500.00 = 12,500.00Rp

Jumlah (1) = 12,500.00Rp

11.4.2 Tenaga

0.015 Org Pekerja @ Rp 30,000.00 = 450.00Rp

0.150 Org Tukang kayu @ Rp 45,000.00 = 6,750.00Rp

0.015 Org Kepala tukang @ Rp 50,000.00 = 750.00Rp0.008 Org Mandor @ Rp - = -Rp

Jumlah (2) = 7,950.00Rp

Jumlah (1) + (2) = 20,450.00Rp

26 1 bh Pasang engsel jendela

11.5.1 Bahan

1.000 Bh Engsel jendela @ Rp 7,500.00 = 7,500.00Rp

Jumlah (1) = 7,500.00Rp

11.5.2 Tenaga

0.010 Org Pekerja @ Rp 30,000.00 = 300.00Rp

0.100 Org Tukang kayu @ Rp 45,000.00 = 4,500.00Rp

0.010 Org Kepala tukang @ Rp 50,000.00 = 500.00Rp

0.005 Org Mandor @ Rp - = -Rp

Jumlah (2) = 5,300.00Rp

Jumlah (1) + (2) = 12,800.00Rp

Page 19: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 19/39

 BIDANG

27 1 bh Pasang kait angin

11.8.1 Bahan

1.000 Bh Hak angin @ Rp 8.500,00 = #VALUE!

Jumlah (1) = #VALUE!

11.8.2 Tenaga

0.015 Org Pekerja @ Rp 30,000.00 = 450.00Rp

0.150 Org Tukang kayu @ Rp 45,000.00 = 6,750.00Rp

0.015 Org Kepala tukang @ Rp 50,000.00 = 750.00Rp

0.007 Org Mandor @ Rp - = -Rp

Jumlah (2) = 7,950.00Rp

Jumlah (1) + (2) = #VALUE!

28 1 bh Pasang grendel pintu

11.10.1 Bahan

1.000 Bh grendel @ Rp 12,500.00 = 12,500.00Rp

Jumlah (1) = 12,500.00Rp

11.10.2 Tenaga

0.020 Org Pekerja @ Rp 30,000.00 = 600.00Rp

0.100 Org Tukang kayu @ Rp 45,000.00 = 4,500.00Rp

0.020 Org Kepala tukang @ Rp 50,000.00 = 1,000.00Rp

0.001 Org Mandor @ Rp - = -Rp

Jumlah (2) = 6,100.00Rp

Jumlah (1) + (2) = 18,600.00Rp

29 1 bh Pasang grendel jendela

11.10.1 Bahan

1.000 Bh grendel jendela @ Rp 12,500.00 = 12,500.00Rp

Jumlah (1) = 12,500.00Rp

11.10.2 Tenaga

0.020 Org Pekerja @ Rp 30,000.00 = 600.00Rp

0.100 Org Tukang kayu @ Rp 45,000.00 = 4,500.00Rp

0.020 Org Kepala tukang @ Rp 50,000.00 = 1,000.00Rp

0.001 Org Mandor @ Rp - = -Rp

Jumlah (2) = 6,100.00Rp

Jumlah (1) + (2) = 18,600.00Rp

30 1 m² Pasang kaca, tebal 5 mm

11.15.1 Bahan

1.100 M² Kaca @ Rp 95,000.00 = 104,500.00Rp

Jumlah (1) = 104,500.00Rp

11.15.2 Tenaga

0.015 Org Pekerja @ Rp 30,000.00 = 450.00Rp

0.150 Org Tukang kayu @ Rp 45,000.00 = 6,750.00Rp

0.015 Org Kepala tukang @ Rp 50,000.00 = 750.00Rp

0.008 Org Mandor @ Rp - = -Rp

Jumlah (2) = 7,950.00Rp

Jumlah (1) + (2) = 112,450.00Rp

31 1 m³ Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr12.2.1 Bahan

232.000 Kg Semen portland @ Rp 1,160.00 = 269,120.00Rp

0.520 M³ Pasir beton @ Rp 110,000.00 = 57,200.00Rp

0.780 M³ Koral beton/split @ Rp 150,000.00 = 117,000.00Rp

Jumlah (1) 443,320.00Rp

12.2.2 Tenaga

1.650 Org Pekerja @ Rp 30,000.00 = 49,500.00Rp

0.250 Org Tukang batu @ Rp 45,000.00 = 11,250.00Rp

0.025 Org Kepala tukang @ Rp 50,000.00 = 1,250.00Rp

0.080 Org Mandor @ Rp - = -Rp

Jumlah (2) = 62,000.00Rp

Jumlah (1) + (2) = 505,320.00Rp

Page 20: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 20/39

 BIDANG B

32.0 1 Kg Pembesian dengan besi polos

12.4.1 Bahan

1.050 Kg Besi beton (polos) @ Rp 10,500.00 = 11,025.00Rp

0.015 Kg Kawat beton @ Rp 12,500.00 = 187.50Rp

Jumlah (1) 11,212.50Rp

12.4.2 Tenaga

0.007 Org Pekerja @ Rp 30,000.00 = 210.00Rp

0.007 Org Tukang besi @ Rp 45,000.00 = 315.00Rp

0.0007 Org Kepala tukang @ Rp 50,000.00 = 35.00Rp

0.0004 Org Mandor @ Rp - = -Rp

Jumlah (2) = 560.00Rp

Jumlah (1) + (2) = 11,772.50Rp

33 1 m² Pasang bekisting untuk sloof

12.6.1 Bahan

0.045 M³ Kayu kelas III @ Rp 2,740,000.00 = 123,300.00Rp

0.300 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 2,700.00Rp

0.100 Lt Minyak bekisting @ Rp 9,750.00 = 975.00Rp

Jumlah (1) 126,975.00Rp

12.6.2 Tenaga

0.300 Org Pekerja @ Rp 30,000.00 = 9,000.00Rp

0.260 Org Tukang kayu @ Rp 45,000.00 = 11,700.00Rp

0.026 Org Kepala tukang @ Rp 50,000.00 = 1,300.00Rp0.015 Org Mandor @ Rp - = -Rp

Jumlah (2) = 22,000.00Rp

Jumlah (1) + (2) = 148,975.00Rp

Untuk 2xpakai = 74,487.50Rp

34 1 m² Pasang bekisting untuk kolom

12.7.1 Bahan

0.040 M³ Kayu kelas III @ Rp 2,740,000.00 = 109,600.00Rp

0.400 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 3,600.00Rp

0.200 Lt Minyak bekisting @ Rp 9,750.00 = 1,950.00Rp

0.015 M³ Balok kayu kelas III, begesting @ Rp 3,500,000.00 = 52,500.00Rp

0.028 M³ Kaso 5/7x400 m @ Rp 4,250,000.00 = 119,000.00Rp

Jumlah (1) 286,650.00Rp

12.7.2 Tenaga

0.300 Org Pekerja @ Rp 30,000.00 = 9,000.00Rp

0.330 Org Tukang kayu @ Rp 45,000.00 = 14,850.00Rp

0.033 Org Kepala tukang @ Rp 50,000.00 = 1,650.00Rp

0.015 Org Mandor @ Rp - = -Rp

Jumlah (2) = 25,500.00Rp

Jumlah (1) + (2) = 312,150.00Rp

Untuk2xpakai = 156,075.00Rp

35 1 m² Pasang bekisting untuk balok

12.8.1 Bahan

0.040 M³ Kayu Kelas III @ Rp 2,740,000.00 = 109,600.00Rp

0.400 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 3,600.00Rp

0.200 Lt Minyak bekisting @ Rp 9,750.00 = 1,950.00Rp

0.018 M³ Balok kayu borneo @ Rp 3,500,000.00 = 63,000.00Rp

0.028 M³ Kaso 5/7x400 m @ Rp 4,250,000.00 = 119,000.00RpJumlah (1) 297,150.00Rp

12.38.2 Tenaga

0.320 Org Pekerja @ Rp 30,000.00 = 9,600.00Rp

0.330 Org Tukang kayu @ Rp 45,000.00 = 14,850.00Rp

0.033 Org Kepala tukang @ Rp 50,000.00 = 1,650.00Rp

0.016 Org Mandor @ Rp - = -Rp

Jumlah (2) = 26,100.00Rp

Jumlah (1) + (2) = 323,250.00Rp

Untuk 2xpakai = 161,625.00Rp

Page 21: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 21/39

 BIDANG

36 1 m² Pasang lantai keramik 30 x 30 cm

13.17.1 Bahan

1.000 m2 Ubin keramik 30 x 30 cm @ Rp 45,000.00 = 45,000.00Rp

11.380 Kg Semen portland @ Rp 1,200.00 = 13,656.00Rp

0.042 M³ Pasir pasang @ Rp 85,000.00 = 3,570.00Rp

1.500 Kg Semen putih @ Rp 2.500,00 = #VALUE!

Jumlah (1) #VALUE!

13.17.1 Tenaga

0.150 Org Pekerja @ Rp 30,000.00 = 4,500.00Rp0.160 Org Tukang batu @ Rp 45,000.00 = 7,200.00Rp

0.035 Org Kepala tukang @ Rp 50,000.00 = 1,750.00Rp

0.008 Org Mandor @ Rp - = -Rp

Jumlah (2) = 13,450.00Rp

Jumlah (1) + (2) = #VALUE!

37 1 m² Pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar,

2 lapis cat penutup.

14.6.1 Bahan

0.200 Kg Cat meni @ Rp 22,500.00 = 4,500.00Rp

0.150 Kg Plamir @ Rp 20.800,00 = #VALUE!

0.200 lbr Kertas gosok @ Rp 2,750.00 550.00Rp

0.260 Kg Cat penutup 2 kali @ Rp 45,000.00 = 11,700.00RpJumlah (1) = #VALUE!

14.6.2 Tenaga

0.070 Org Pekerja @ Rp 30,000.00 = 2,100.00Rp

0.090 Org Tukang cat @ Rp 45,000.00 = 4,050.00Rp

0.006 Org Kepala tukang @ Rp 50,000.00 = 300.00Rp

0.004 Org Mandor @ Rp - = -Rp

Jumlah (2) = 6,450.00Rp

Jumlah (1) + (2) = #VALUE!

38 1 m² Pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar,

3 lapis cat penutup.

14.7.1 Bahan

0.200 Kg Cat meni @ Rp 22,500.00 = 4,500.00Rp

0.150 Kg Plamir @ Rp 20.800,00 = #VALUE!

0.200 lbr Ketas gosok @ Rp 2,750.00 550.00Rp0.350 Kg Cat penutup 3 kali @ Rp 45,000.00 = 15,750.00Rp

Jumlah (1) = #VALUE!

14.7.2 Tenaga

0.070 Org Pekerja @ Rp 30,000.00 = 2,100.00Rp

0.105 Org Tukang cat @ Rp 45,000.00 = 4,725.00Rp

0.004 Org Kepala tukang @ Rp 50,000.00 = 200.00Rp

0.003 Org Mandor @ Rp - = -Rp

Jumlah (2) = 7,025.00Rp

Jumlah (1) + (2) = #VALUE!

39 1 m² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis

cat penutup )

14.11.1 Bahan

0.100 Kg Plamir @ Rp 4.800,00 = #VALUE!0.100 Kg Cat dasar @ Rp 15.400,00 = #VALUE!

0.200 lbr Kertas gosok @ Rp 2,750.00 550.00Rp

0.260 Kg Cat penutup 2x @ Rp 15.400,00 = #VALUE!

Jumlah (1) = #VALUE!

14.11.1 Tenaga

0.020 Org Pekerja @ Rp 30,000.00 = 600.00Rp

0.063 Org Tukang cat @ Rp 45,000.00 = 2,835.00Rp

0.0063 Org Kepala tukang @ Rp 50,000.00 = 315.00Rp

0.003 Org Mandor @ Rp - = -Rp

Jumlah (2) 3,750.00Rp

Jumlah (1) + (2) = #VALUE!

Page 22: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 22/39

Page 23: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 23/39

Page 24: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 24/39

Page 25: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 25/39

Page 26: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 26/39

Page 27: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 27/39

Page 28: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 28/39

Page 29: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 29/39

Page 30: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 30/39

Page 31: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 31/39

A. BAHAN BANGUNAN

1 m3 75,000.002 Pasir Pasang m3 85,000.00

3 m3 110,000.00

4 m3 125,000.00

5 Kerikil 2/3 pecah mesin m3 150,000.00

6 bj 350.00

7 Portland Cement (PC) 40 Kg kg 1,160.00

8 Portland Cement (PC) Putih kg 2.500,00

9 Semen Warna kg 7,500.00

10 Besi Beton Polos kg 10,500.00

11 Kawat Beton (bendrat) kg 12,500.00

12 Besi Beugel/dook, angker kg 10,500.00

13 kg 13.300,00

14 ltr 4.300,00

15 Cat Meni Kayu kg 22,500.0016 kg 15.400,00

17 kg 45,000.00

18 Plamur Dinding kg 4.800,00

19 Plamur Kayu kg 20.800,00

20 Kertas Gosok lbr 2,750.00

21 bh 15,000.00

22 Teer/Residu ltr 32,500.00

23 Kaca Bening 5 mm m2 95,000.00

24 Kaca Rayband 5 mm m2 189.500,00

28 Kayu balok/papan begesting m3 2,740,000.00

25 Kayu Papan mutu C m3 3,500,000.00

27 Kayu papan mutu A m3 4,250,000.00

26 Kayu Papan sgl ukuran kelas II m3 5,500,000.00

29 Kayu Balok sgl ukuran kelas II m3 5,000,000.00

26 Kayu Balok sgl ukuran kelas II m3 5,000,000.00

28 List gypsum 8 cm m' 15,000.00

27 Asbes Datar 1x1 lbr 7,000.00

30 Keramik (30x30) kw 1 m2 45,000.00

27 Seng Plat 3"X6" BJLS 28 m' 22,500.00

29 kg 9,000.00

28 Engsel Pintu ukuran 12 Cm bj 12,500.00

31 Engsel Jendela ukuran 6 Cm bj 7,500.00

28 Grendel tanam pintu bj 8.000,00

30 Grendel Jendela bj 12,500.00

29 Hak Angin Sikutan bj 5,500.00

32 Hak Angin Kait bj 8.500,00

29 Pasang instalasi ttk 110,000.00

31 Pasang Stop kontak ttk 25,000.00

30 Saklar Tunggal bj 25,000.00

33 Saklar Ganda bj 35,000.00

30 Lampu TL 20 w lengkap bj 125,000.00

32 Lampu SL 18 w bj 36,000.00

31 Kunci Tanam2 x putar bh 150,000.00

34 Fitting Lampu pijar bj 17,500.00

31 Genteng Lokal Kodok bj 3,000.00

33 Genteng bubungan lokal bj 3,500.00

Kuas 4"

Paku

Besi Strip

Minyak Cat

Cat Kayu

Cat Dinding

DAFTAR HARGA BAHAN BANGUNAN & UPAH KERJA

REHABILITASI RUANG KELAS RUSAK BERAT SD

TAHUN 2012

Jumlah Harga (Rp)No. Sat.JENIS BAHAN

Pasir Urug

Pasir Cor

Batu Belah

Bata Merah

Page 32: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 32/39

B. UPAH TENAGA KERJA

1 Org/Hr 0.00

2 Kepala Tukang Kayu Org/Hr 50,000.00

3 Kepala Tukang batu Org/Hr 50,000.00

4 Tukang Kayu Org/Hr 45,000.00

5 Tukang Batu Org/Hr 45,000.00

6 Org/Hr 45,000.00

7 Org/Hr 30,000.00

No. DAFTAR KEAHLIAN

Mandor

Upah Harian (Rp)Sat.

Pekerja

Tukang Cat

Page 33: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 33/39

4 240 6

4 240 6

4 360 9

3.5 350 10

1.25 170 13

Page 34: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 34/39

Page 35: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 35/39

KF MA

0.05 0.05

0.08 0.06

4 4

125% 75 65000 25000

125% 75 0.016 0.012

125% 112.5 4062500 2083333

125% 125 120% 120%

125% 170 4875000 2500000

3.7

6.5

4.5

Page 36: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 36/39

TERENDAH (Rp)

A BAHAN BANGUNAN

1 Pasir Urug m3 85,000.00

2 Pasir Pasang m3 125,000.00

3 Pasir Cor m3 177,000.00

4 Batu Belah m3 100,280.00

5 Kerikil 2/3 pecah tangan m3 85,000.00

6 Bata Merah bj 350.00

7 Portland Cement (PC) 40 Kg kg 1,087.00

8 Portland Cement (PC) Putih kg 2,300.00

9 Semen Warna kg 6,500.00

10 Besi Beton Polos kg 10,500.00

11 Kawat Beton (bendrat) kg 11,500.00

12 Besi Beugel/dook, angker kg 11,500.00

13 Besi Strip kg 12,500.00

14 Minyak Cat ltr 4,000.00

15 Cat Meni Kayu kg 29,000.00

16 Cat Kayu kg 14,500.00

17 Cat Dinding kg 12,000.00

18 Plamur Dinding kg 4,500.00

19 Plamur Kayu kg 19,600.00

20 Kertas Gosok lbr 2,500.00

21 Kuas bh 11,000.00

22 Teer/Residu ltr 30,000.00

23 Kaca Bening 5 mm m2 85,000.00

24 Kaca Rayband 5 mm m2 178,000.00

25 Kayu Papan meranti B m3 2,650,000.00

26 Kayu Papan sgl ukuran (kampe m3 5,594,000.00

27 Kayu papan meranti A m3 2,950,000.00

28 Kayu Balok sgl ukuran meranti m3 2,750,000.00

29 Kayu Balok sgl ukuran (kamper) m3 6,700,000.00

30 Kayu Balok sgl ukuran (kruing) m3 4,590,000.00

31 List gypsum 8 cm m' 9,000.00

32 Asbes Datar 1x1 lbr 7,500.00

33 Keramik (30x30) kw 1 m2 51,700.00

34 Seng Plat BJLS 30 Ukuran 50 m' 14,000.00

35 Paku kg 15,000.00

36 Engsel Pintu ukuran 12 Cm bj 18,000.00

37 Engsel Jendela ukuran 6 Cm bj 16,000.00

38 Grendel tanam pintu bj 12,500.00

39 Grendel Jendela bj 7,500.00

40 Hak Angin Sikutan bj 4,750.00

41 Hak Angin Kait bj 8,000.00

42 Pasang instalasi ttk 388,000.00

43 Pasang Stop kontak ttk 15,000.00

44 Saklar Tunggal bj 14,500.00

45 Saklar Ganda bj 18,500.00

46 Lampu TL 20 w lengkap bj 40,000.00

NO NAMA BARANG SATUAN

Page 37: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 37/39

47 Lampu SL 18 w bj 24,500.00

48 Kunci Tanam2 x putar bh 113,800.00

49 Fitting Lampu pijar bj 13,500.00

50 Genteng Lokal Kodok bj 1,900.00

51 Genteng bubungan lokal bj 3,300.00

B UPAH TENAGA KERJA

1 Mandor Orang / Hari 50,000.002 Kepala Tukang Kayu Orang / Hari 42,500.00

3 Kepala Tukang batu Orang / Hari 42,500.00

4 Tukang Kayu Orang / Hari 35,000.00

5 Tukang Batu Orang / Hari 35,000.00

6 Tukang Cat Orang / Hari 40,000.00

7 Pekerja Orang / Hari 32,500.00

Page 38: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 38/39

TERTINGGI (Rp) RATA-RATA (Rp)

105,000.00 95,000.00

136,000.00 130,500.00

187,700.00 182,350.00

106,300.00 103,290.00

90,100.00 87,550.00

400.00 375.00

1,200.00 1,143.50

2,500.00 2,400.00

6,900.00 6,700.00

11,200.00 10,850.00

12,200.00 11,850.00

12,200.00 11,850.00

13,300.00 12,900.00

4,300.00 4,150.00

22,100.00 25,550.00

15,400.00 14,950.00

15,600.00 13,800.00

4,800.00 4,650.00

20,800.00 20,200.00

2,700.00 2,600.00

11,700.00 11,350.00

31,800.00 30,900.00

90,100.00 87,550.00

189,500.00 183,750.00

2,809,000.00 2,729,500.00

5,929,000.00 5,761,500.00

3,215,000.00 3,082,500.00

2,915,000.00 2,832,500.00

7,102,000.00 6,901,000.00

4,590,000.00 4,590,000.00

10,800.00 9,900.00

8,000.00 7,750.00

54,900.00 53,300.00

14,900.00 14,450.00

15,900.00 15,450.00

19,100.00 18,550.00

17,000.00 16,500.00

13,300.00 12,900.00

8,000.00 7,750.00

5,100.00 4,925.00

8,500.00 8,250.00

411,300.00 399,650.00

20,500.00 17,750.00

15,100.00 14,800.00

19,400.00 18,950.00

42,400.00 41,200.00

HARGA

Page 39: 2. Laporan Mingguan_4_OK

5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com

http://slidepdf.com/reader/full/2-laporan-mingguan4ok 39/39

26,000.00 25,250.00

120,700.00 117,250.00

14,100.00 13,800.00

2,100.00 2,000.00

3,500.00 3,400.00

53,000.00 52,500.0045,100.00 43,800.00

45,100.00 43,800.00

37,100.00 36,050.00

37,100.00 36,050.00

42,400.00 41,200.00

34,555.00 33,527.50