8/12/2019 2. Plumbing Calculation for Bmw
1/9
PROJECT: BMW SHOWROOM
SUBJECT: PLUMBING AND FIRE FIGHTING
35 staff
15 Gallons
57 Liters
525 Gallons
1988 L iters
70 pers
5 Gallons
19 Liters
350 Gallons
1325 L iters
875 Gallons
3312 L iters
25 staff
30 Gallons
114 Liters
750 Gallons
2839 L iters
7 Cu.m
792 Gallons
2998 Liters
792 Gallons
3 Cu.m
792 Gallons
2998 Liters
792 Gallons
3 Cu.m
13 Cu.m
Total f low rate for staf f
WATER DEMAND PER DAY
GRAND TOTAL WATER DEMAND
-Water consumption estimated
Total f low rate for staf f
WATER DEMAND PER DAY
III. IRRIGATION
-Water consumption estimated
-Flow rate per staff
Total f low rate for staf f
WATER DEMAND PER DAY
II. WATER DEMAND FOR CAR WASHER
Total f low rate for v is i tor
Flow rate for staf f and vis i tor
1.Work shop
-Number of staff estimated
Total f low rate for staf f
-Number of passenger/visitor
-Flow rate per person
DATE: 23-01-2013
WATER CONSUMPTION DEMAND FOR WATER SUPPLY
I. WATER DEMAND FOR STAFF AND VISITOR
1.FRONT OFFICE
-Number of staff estimated
-Flow rate per staff
Water consumption calculation Page 1 of 9
8/12/2019 2. Plumbing Calculation for Bmw
2/9
10% -
1 day
15 Cu.m /day
10 Cu.m
2 running
0.55 l/s
90 mn
99 l/mn
5.94 Cu/m
Total f low rate for h ose reels
Total f low rate for h ose reels
GRAND TOTAL WATER DEMAND
CHOOSE STAINLESS WATER TANK
WATER CONSUMPTION DEMAND FOR FIRE FIGHTING
-Fire hose reel
-Flow rate per hose reel
-Time reserve
-Safety factor
- Time reserve
Water consumption calculation Page 2 of 9
8/12/2019 2. Plumbing Calculation for Bmw
3/9
PROJECT: BMW SHOWROOM
SUBJECT: PLUMBING AND FIRE FIGHTING
875 Gallons3312 L iters
1782 Gallons
6.8 Cu.m
- Refering from technical data of septic tank
1.5 m
2 m
2.3 m
- The value of L is ony for the length of the digestion chamber. Divide it by 2 then addto the value fo L. Thus,
3.5 m
3.5 m
750 Gallons
2839 L iters
1688 Gallons
6.4 Cu.m
- Refering from technical data of septic tank
1.5 m
2 m
2.2 m
- The value of L is ony for the length of the digestion chamber. Divide it by 2 then add
to the value fo L. Thus,
3.3 m
3.3 m
1625 Gallons
6151 L iters
DATE: 23-01-2013
I. FRONT OFFICE
- Depend on Water consumption
Thus, L=
- The liquid volume of the tank in gallons
V =
- The liquid volume of the tank in gallons
II. WORK SHOP
- Depend on Water consumption
- The liquid volume of the tank in gallons
SIZE OF SEPTIC TANK :
Thus, Total L=
SEPTICA TANK CALCULATION
3.5m(L)x2.0m(W)x1.5m(D)
Thus, L=
Thus, Total L=
3.5m(L)x2.0m(W)x1.5m(D)
III. COMBINED OFFICE AND WORK SHOP
- Depend on Water consumption
V =
Maximum depth for septic tank is
And Assume 2m as the width of tank
Total length of the sept ic tank (L)=
V =
V =
SIZE OF SEPTIC TANK :
And Assume 2m as the width of tank
Maximum depth for septic tank is
Total length of the sept ic tank (L)=
Water consumption calculation Page 3 of 9
8/12/2019 2. Plumbing Calculation for Bmw
4/9
8/12/2019 2. Plumbing Calculation for Bmw
5/9
I. 12th floo r
Item Description Fixture No. U/Flow Rate(l/s) T/Flow Rate(l/s)
1 Water Closet 15 0.10 1.5002 Wash Basin/Lavatory 16 0.10 1.600
3 Urinal 1 0.10 0.100
4 Kitchen sink/Sink(G1/2) 2 0.20 0.400
5 Kitchen sink/Sink(G1) 0 0.30 0.000
6 Bathup (G 3/4) 9 0.35 3.150
7 Bathup (G 1) 0 0.60 0.000
8 Shower 4 0.25 1.000
9 Washing machine 3 0.40 1.200
10 Dish washing machine 3 0.40 1.200
TOTAL 53 10.150
Total Sanitary Fixture : 53
Total Flow Rate : 10.15 l/s
K Facture : 0.139
: 1.41 l/s
: 50 mm DN40mm: 0.8 m/s
: 300 Pa/m
References:
1. Le formulare des installations sanitaires
2. Pipe sizing
- 1997 ASHRAE Fundamentals Handbook (SI)
PROJECT:
SUBJECT: PLUMBING SYSTEM
DATE: 2012
DOMESTIC WATER SUPPLY SYSTEM
MAIN PIPE SIZING
Total cold water flow rate required
Pipe Sizing Calculated ODVelocity
Pressure drop
Page 5 of 9
8/12/2019 2. Plumbing Calculation for Bmw
6/9
Item Description Fixture No. U/Flow Rate(l/s) T/Flow Rate(l/s)
1 Water Closet 9 1.50 13.500
2 Wash Basin/Lavatory 9 0.10 0.900
3 Urinal 6 0.10 0.600
4 Kitchen sink/Sink(G1/2) 3 0.20 0.600
5 Kitchen sink/Sink(G1) 0 0.30 0.000
6 Bathup (G 3/4) 0 0.35 0.000
7 Bathup (G 1) 0 0.60 0.000
8 Shower 0 0.25 0.000
9 Washing machine 0 0.40 0.000
10 Faucet 5 0.40 2.000
TOTAL 32 17.600
Total Sanitary Fixture : 32
Total Flow Rate : 17.6 l/s
K Facture : 0.144
Total water f low rate required : 2.53 l/s 9.108 m3/hr
Pump pressure head required :
- Pressure at highest draw-off point : 13 m
- High from pump to highest draw-off point : 11 m
- Pressure drop : 5 m
Total pressure required : 29 m 2.9 bar
BOOSTER PUMP CAPACITY:
- Water f low rate (K fac tor 10%) : 11 m3/hr
- Water pressure head : 3.2 bar
PROJECT: BMW SHOWROOM
SUBJECT: PLUMBING SYSTEM
DATE: 28-02-2013
BOOSTER PUMP-01&02
Page 6 of 9
8/12/2019 2. Plumbing Calculation for Bmw
7/9
PROJECT: BMW SHOWROOM
SUBJECT: PLUMBING SYSTEM
DATE: 28-02-2013
Fire hose reel system
1- Hose reel system referring to british standard design and installation.- Area identification: Office
- Design density : 0.5 l/s
- Number of instantaneous operation : 3 nos
- Total water flow rate required : 1.5 l/s 6 m3/hr
- Pressure at highest draw-off point : 25 m
Pump pressure head required combine all system :
- Pressure at highest draw-off point : 25 m
- High from pump to highest draw-off point : 10 m
- Pressure drop : 5 m
Total pressure required for f i re pum p : 40 m 4 bar
PRINCIPAL PUMP CAPACITY:
- Water f low rate (140%) : 8.4 m3/hr
- Water pressure head : 4 bar
JOKEY PUMP CAPACITY
- Water f low rate : 3.6 m3/hr
- Water pressure head (Add 10% of main pump) : 4.4 bar
2 garden taps : 0.8 l/sTotal water f low rate required : 0.8 l/s 2.88 m3/hr
Pump pressure head required :
- Pressure at highest draw-off point : 20 m
- High from pump to highest draw-off point : 10 m
- Pressure drop : 4 m
Total pressure required : 34 m 3.4 bar
BOOSTER PUMP CAPACITY:
- Water f low rate : 2.9 m3/hr
- Water pressure head : 3.4 bar
GARDEN PUMP
FIRE FIGHTING PUMP
Page 7 of 9
8/12/2019 2. Plumbing Calculation for Bmw
8/9
Item Description Unit Qty Location
Booster pump, Inverter BP-01&02 (twin pumps, 1 duty, 1 standby) set 1
> Booster pump, Q :11.0 m3/h @ 3.3 bar, for each set 1
> 1 protection panel set 1
> Pressure tank capacity: 55 Liters set 1
> Pressure switch, flow switch set 1
Fire fighting pump system: set 1
> Electrical fire pump(EFP), Q :9.0 m3/h @ 4.0 bar set 1
> Diesel fire pump(DFP), Q :9.0 m3/h @ 4.0 bar set 1
> Jokey pump(JP), Q :.3.0 m3/h @ 4.4 bar set 1
> 1 protection panel for Electrical & Jokey pump set 1
> 1 protection panel for Diesel fire pump set 1
> 1 pressure tank set 1
> Pressure switch, flow switch set 1
Submersible pump set 1
> Submersible pump(SP-01), Q :5.4 m3/h @ 0.8 bar set 1
> 1 protection panel set 1
Submersible pump (twin pumps, 1 duty, 1 standby) set 1
> Submersible pump(SP-02&03), Q :5.4 m3/h @ 0.8 bar for each set 1
> 1 protection panel set 1
4 near oil separator(Ground floor)
DATE: 06-03-2013
PUMP SCHEDULE
2 Pump Room(Ground floor)
3 In water tank(Ground floor)
PROJECT:BMW SHOWROOM
SUBJECT: PLUMBING AND FIRE FIGHTING SYSTEM
Pump Room(Ground floor)1
Plumbing
8/12/2019 2. Plumbing Calculation for Bmw
9/9
Reference: Calpeda pressure tank volume calculaton
Vt= (Qm/4xZ)x1/1-((P2-2)/P1)
Vt: Total volume of air cushion vessel in m3
Qm: Average pump flow in m3 Qm= (Qmin + Qmax)/2
Qmin: Minimum pump flow in m3
Qmax: Maximum pump flow in m3
P1: Maximum set pressure of pressure switch
P2: Minimum set pressure of pressure switch
Z: Mazimum nuber of starts/hours allowed by the motor
Qmin: m3/h Recommendation
Qmax: m3/h Recommendation
Qm: 11 m3/h
P1: 45 m
P2: 20 m
Z: 21 time Recommendation
Vt= 0.218254
Thus, Pressure tank capacity: 219 Liters
If, Pump is inverter, so, safety factor 25 % Recommendation
Thus, Pressure tank capacity: 55 Liters
PROJECT: BMW
TASK: PLUMBING SYSTEM, PRESSURE TANK
DATE: 27-05-2013
PRESSURE TANK VOLUME SELECTION