26
BIRMINGHAM RESILIENCE Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d – April to June 2016 Colin Rimmer Senior Engineer (Atkins) Clean Water Modelling Advisory Group Autumn Conference 5th October 2016

2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

BIRMINGHAM RESILIENCEHighters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d – April to June 2016

Colin RimmerSenior Engineer (Atkins)

Clean Water Modelling Advisory GroupAutumn Conference 5th October 2016

Page 2: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

THE BIRMINGHAM RESILIENCE PROJECT OVERVIEW

Page 3: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

SEVERN TRENT WATER’S STRATEGIC GRIDLadybower Reservoir

Sheffield

Derby

Nottingham

Leicester

CoventryBirmingham

Worcester

CheltenhamGloucestershire 250 pressure loggers

Page 4: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

RECORDED DATA SAMPLE

Page 5: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

MODEL CALIBRATION

Sawley FCV

Sawley FCV

TV’s or Roughness > 40mm

Page 6: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

MODEL CALIBRATION

Page 7: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

MODEL CONFIDENCE RATING & SYSTEM CAPACITY

6

Grid Miser Model   Synergi Model

OPERATIONAL READINESS MODE ‐ MODEL RESULTS

Page 8: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

STRATEGIC GRID DISCOLOURATION RISK – CURRENT VIEW

7

DVA Ambergate to Hallgates

Avon‐Soar Link Hallgates to Oldbury

M2HH and Birmingham Network

Page 9: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

HIGHTERS HEATH TO MERIDEN FLOW INCREASE  ‐ TRIAL PLANNING

Page 10: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL PLANNING ‐ SITE SURVEYS

9

Page 11: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL PLANNING – MERIDEN TO HIGHTERS HEATH CURRENT SETUP

10

Current Peak Flow Rate 26.9 Ml/d (Volume 25 Ml/d) Increase to 40 Ml/d

Pipe Volume & Water Age1200mm = 7.2 km & 900mm 15.8 km (Total Volume 18.98 Ml)

Current daily volume 25 Ml/d (18 Hrs)When increased to 30 Ml/d (15 Hrs)When increased to 35 Ml/d (13 Hrs)When increased to 40 Ml/d (11.5 Hrs)

Reverse flow 80 Ml/d

Birmingham Mid Level

Page 12: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL PLANNING – MERIDEN TO HIGHTERS HEATH CURRENT SETUP

11

Produced to highlight any potential risks & to ensure that a proactive response was completed by operational staff during the 

flow increase period.

Page 13: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL PLANNING – PRESENTATION TO OPERATIONAL STAFF

12To update footer go to 'Insert' Tab > Header &  12

Page 14: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

MERIDEN TO HIGHTERS HEATH – TURBIDITY LOGGER LOCATIONS

1313

Page 15: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL PLANNING – CRIB SHEET

1414

Overall Management of Trial (Conference call prior to each flow 

increase)

Trial Planning / Support 

(Modelling Input)

Network Control

Water Resources

Birmingham Networks Site Operators

Water QualitySpecialist Support Engineer (R&C documents)

Aqueduct Site Operators (Grid)

Page 16: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL REVIEW

Page 17: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL REVIEW – PEAK FLOW RATE TIMES

1616

Page 18: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL REVIEW – CONTROLLING THE FLOW INCREASES

1717

Page 19: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL REVIEW – STRENSHAM OUTAGE

Understanding the risks on the wider network (i.e. the Grid & the Birmingham Network).

Strensham WTW

Meriden DSR

M2HHTrunkMain

Birmingham Network

Page 20: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL REVIEW – BIRMINGHAM DEMAND & MANAGING SR STORAGE

Page 21: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL REVIEW – BIRMINGHAM DEMAND CHANGES

1

2

Page 22: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL REVIEW – TURBIDITY MONITORING

Page 23: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL REVIEW – FLOW INCREASE REVIEW

Benefits;• Improved resilience.• Reduced the customer contact risk.• Operational staffing input has now 

reduced dramatically (6 weeks to 2 days). It should be noted that the flow increase to 40 Ml/d has now been completed in just one day.

• Improved Asset Confidence within the business.

• No need to robust flush the main (i.e. No water losses).

• Removed the need for trunk mains cleaning.

No Customer Contacts

Page 24: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL REVIEW – PUMP CONTROL AND FLOW CHANGE REVIEW

Page 25: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

TRIAL REVIEW – DATA CAPTURE / FUTURE FLOW INCREASES

Documenting the results to ensure that future conditioning of the trunk main can be completed by operational staff.

Page 26: 2. STW Birmingham Resilience Colin Rimmer CwMAG 2016 · 02/02/2017  · Highters Heath to Meriden Flow Increase from 25 Ml/d to 40 Ml/d –April to June 2016 Colin Rimmer Senior Engineer

DO YOU HAVEANY QUESTIONS?

[email protected]