36
20 20 FLIGHT FLIGHT STANDARDS & STANDARDS & TECHNOLOGY TECHNOLOGY Innovations in flight Innovations in flight C/N/S-ATM in a post 9/11 world C/N/S-ATM in a post 9/11 world Captain Joe Burns Director – Flight Standards & Technology

20 FLIGHT STANDARDS & TECHNOLOGY Innovations in flight C/N/S-ATM in a post 9/11 world Captain Joe Burns Director – Flight Standards & Technology

Embed Size (px)

Citation preview

20

20

FLIGHTFLIGHT STANDARDS & STANDARDS &TECHNOLOGYTECHNOLOGYInnovations in flightInnovations in flight

C/N/S-ATM in a post 9/11 worldC/N/S-ATM in a post 9/11 world

Captain Joe Burns Director – Flight Standards & Technology

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

2

OutlineOutline

• Pre 9-11 activities• The “new” reality and future

planning• Key Aircraft Technologies• United’s new activity plan• Recommendations

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

3

Pre 9/11 activitiesPre 9/11 activities

• CPDLC Build 1 Trials• Airline push for FANS expansion• Strong ADS-B push• Electronic Documents/EFB• “Big” Broadband to Aircraft• Substantial NEXCOM participation• ATM improvements

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

4

The “new” futureThe “new” future• What are the critical activities?

– Keep the airline running– Mandates– Reimbursement potential?

• What are Safety and Security items?

• What are the high payback items?• NPV of all projects to be considered• Slow-down and analyze “knee-jerk”

mandates• JV Activities with Airlines as

minorities

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

5

Future Activity blueprintsFuture Activity blueprints

• NASA• FAA OEP• Industry

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

6

The Vision: Integration & ConvergenceThe Vision: Integration & Convergence

Today Tomorrow2007/10

Future2025

Ground Navaids(VOR, DME)Ground Navaids(VOR, DME)

Analog VoiceAnalog Voice

RadarRadar

Navaids & GPSNavaids & GPS

Digital Voice & Narrowband DatalinkDigital Voice & Narrowband Datalink

Radar & ADS-B (State)Radar & ADS-B (State)

Satellite Based (GPS)Satellite Based (GPS)

•Broadband Communications

• Smart Network

•Broadband Communications

• Smart Network

RadarRadar

Precision Navigation

Voice, Data, Imagery Comm

Interactive Surveillance (Super ADS)

Precision Navigation

Voice, Data, Imagery Comm

Interactive Surveillance (Super ADS)

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

7

NASA’s “Blueprint for the Future”NASA’s “Blueprint for the Future”

• Enhanced Communications• Enhanced Navigation• Enhanced Surveillance• Digital Atmosphere• Digital Airport• Enhanced Air Traffic Management

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

8

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

9

Implementation StrategyImplementation Strategy

0

200

400

600

800

1000

Year

US

Dom

estic

Enp

lane

men

ts

(Mill

ions

)

9/11Implement procedural and airspace changesD

omes

tic

En

pla

nem

ents

Build and instrument select new runways

Equip new aircraft

Equip remaining fleet

Financial recoveryDemand recovery

18 mos.

???

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

10

Arrival / Departure (AD)Arrival / Departure (AD)

SEGMENT GOAL AVIONICSAD-1 Add New Runways None

AD-2 Use Crossing Runways Procedures

None

AD-3 Redesign Terminal Airspace and Routes

GPS, RNP, FMS

Ad-4 Fill Gaps in Arrival and Departure Streams

None

AD-5 Expand Use of 3-Mile Separation Standard

None

AD-6 Coordinate for Efficient Surface Movement

GPS, LAAS, ADS-B TX Only,Transponder

AD-7 Enhance Surface Situational Awareness

GPS, LAASSurface Moving Maps, ADS-B, Transponder, TIS-B, CDTI

Building new runways and using new terminal and surface procedures to improve airport capacity

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

11

AD-3 Reduced Navaids/RNP Arrivals

$39M NPV to UAL

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

12

AD-7 Enhanced Surface Awareness

Final Approach, Runway andTaxiway Occupancy Awareness

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

13

Airport Weather (AW)Airport Weather (AW)

SEGMENT GOAL AVIONICS

AW-1 Maintain Runway Use in Reduced Visibility

GPS, RNPLAAS (opt)

AW-2 Space Closer to Visual Standards

ADS-B, TIS-BCDTI, GPS (opt.)

AW-3 Reconfigure Airport Efficiently

None

Make airport operations less sensitive to weather

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

14

AW-2 Decreased Spacing

2 - 5 Miles

Level 2: pilotuses CDTI toextend visualprocedures

Tough Business Case,However AW-1 is $36M NPV

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

15

En Route Congestion (ER)En Route Congestion (ER)

SEGMENT GOAL AVIONICS

ER-1 Match Airspace Design to Meet Demand

RNP, RVSM, GPS (opt.), FMS (opt.)

ER-2 Collaborate to Manage Congestion

None

ER-3 Reduce Voice Communication VDL-M2, CPDLC-ATC Datalink

ER-4 Reduce Vertical Separation TCAS v.7.0, RVSM

ER-7 Accommodate User Preferred Routing

None

ER-8 Improve Access to Special Use Airspace

None

Increased in-flight flexibility to prevent congestion by increases in physical capacity and decreases in controller workload

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

16

ER-3 CPDLC Datalink vs. Voice

Tough Business Case

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

17

ER-4 US DRVSM

410 __________________________________________________

400 _________________________________________________

390 __________________________________________________

380 __________________________________________________

370 __________________________________________________

360 _________________________________________________

350 __________________________________________________

340 _________________________________________________

330 __________________________________________________

320 _________________________________________________

310 __________________________________________________

300 __________________________________________________

FL 290 _______________________________________________

Six new flightlevels areavailable

$82M NPV to UAL

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

18

En Route Severe Weather (EW)En Route Severe Weather (EW)

SEGMENT GOAL AVIONICS

EW-1 Provide Better Hazardous Weather Data

None

EW-2 Respond Effectively to Hazardous Weather

RNP, RVSM, FMSSurface Moving Map, TCAS v.7.0, GPS (opt.)

Reduce in-flight uncertainty due to weather and optimize related operational procedures

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

19

EW-2 Respond Better to Hazardous WX

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

20

EW-2 Respond Better to Hazardous WX

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

21

Key Technologies to focus on:Key Technologies to focus on:

• GPS• Smart Display• Enhanced Altimetry• Datalink• FMS

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

22

GPSGPS

GPS RNP/RNAV

AD-3 (Terminal Airspace)

FMS LAAS

AW-1 (Reduced Vis. Ops.)

2010 NavAid Phase out

Datalink

ADS-B

Smart Display

ACM

CDTI

GCM

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

23

Smart DisplaySmart Display

SmartDisplay

Cabin Surveillance

Electronic Publications/Charts

Datalink ‘A’

Weather

Pax. Info.

Datalink ‘B’

TIS-B

CDTI

CPDLC

Datalink ‘C(Wireless)’

E-Logging

Gate link

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

24

Enhanced AltimetryEnhanced Altimetry

ER-4 (Domestic US RVSM)

RVSMTCAS

Version 7

International RVSM

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

25

DatalinkDatalink

DatalinkSmart

Display

Weather/Turbulence

CDTI

E-Logbook

CPDLCGate linkE-mail (AOC and Passenger)

DDTCAUTOMET/MDCRS*FIXWeb/VideoNEXCOM

GPS

AD-6 (ADS-B Surface)

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

26

Advanced FMSAdvanced FMS

FMS

CPDLC

Automated Publications

ER-1, EW-2 (RNP/RNAV)

AD-3 (RNP/RNAV)

AW-1 (RNP/RNAV)

FANS

RTA

SmartDisplay

LAAS

Training Reduction

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

27

United’s Activity PlanUnited’s Activity Plan

• Communications• Navigation• Surveillance• ATM• Information• Safety and Security

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

28

Communications activity examples:Communications activity examples:

• CPDLC Domestic US• FANS expansion • Flight Information Services• Broadband• Aircraft Wireless System

Evaluations/EMI Testing• NEXCOM• VDL/2 ACARS

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

29

Navigation activity examples:Navigation activity examples:

• LAAS• Dual GPS MMR's Retrofit• DRVSM• RNP/RNAV enroute/approaches• Standardized Advanced FMS – All

Fleets

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

30

Surveillance activity examples:Surveillance activity examples:

• FANS expansion • Elementary Mode-S• Enhanced Mode-S?• ADS-B Transmit or Full System?• CDTI• Multilateration and Ramp

Management

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

31

ATM activity examples:ATM activity examples:

• SOIA/PRM• LAHSO or SIRO• Boeing & Airbus’ ATM programs• ATC Automation tools and

processes– Enhanced CRDA– URET– RTA– pFAST– Free Flight Phase 2

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

32

Information Systems examples:Information Systems examples:

• AUTOMET/MDCRS• Electronic Documents - EFB• Airline Operating System• Wireless Access/IROPs• Web-Based Distance Learning

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

33

Safety/Security activity examples:Safety/Security activity examples:

• Turbulence Detection/ Prediction/Mitigation (Air and Ground based)

• Oceanic Weather Support

• Cabin Surveillance

• Flight Deck Fortress Doors

• Secondary Barrier Doors

• EGPWS/X-Band Radar

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

34

Finally…RecommendationsFinally…Recommendations• Focus on Mandates

• Incorporate into other projects when able

• Look for high return• Take advantage in traffic “lull” to try new

concepts• Include avionic upgrades in all new a/c

purchases• build-in provisions for avionic upgrades

ahead of major hardware• Actively Engage with all parties timelines

of key programs• Look to partner

C/N/S-ATM in a post 9-11 world – United AirlinesC/N/S-ATM in a post 9-11 world – United Airlines

20

20

FLIGHT STANDARDS &TECHNOLOGYInnovations in flight

35

Thank You!

Captain Joe BurnsDirector – Flight Standards and TechnologyUnited Airlines7401 E. Martin Luther King Blvd.Denver, Colorado, USA 80207DEN (303) 780-5178ORD (847) 700-4166

[email protected]

20

20