    ACISeminar on Formwork

    at Chennai

    Dtd 23rd and 24th July 2009

    Seminar Report

    Prepared by

    V. G. Abhyankar

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    2/23

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    3/23

    The program schedule was as shown below

    PROGRAMME

    Thursday, 23rd July 2009

    9.15 10.00 Regis tration and Kit dis tribution

    SESSION - I

    10.00 10.30 Inauguaration

    10.30 11.30 Key Note Address Dr. A. Ramakrishna

    11.30 12.00 Tea Break

    SESSION - II

    12.00 12.45 Technical Paper Presentation Dr. Sivarama Sarma

    (Formwork for SCC Application)

    12.45 13.15 Technical Paper Presentation Dr. C.V. Kand

    (Causes of Centering Failures)

    13.15 14.00 Product Presentation L & T

    14.00 15.00 Lunch

    SESSION - III

    15.00 15.45 Product Presentation DOKA

    15.45 16.30 Product Presentation PERI

    16.30 16.45 Tea Break

    SESSION - IV

    16.45 17.30 Product Presentation GEOPLAST (SPARKONIX)

    17.30 18.00 Technical Paper Presentation Mr. Pradeep Ghumare &

    (Case study on modular Aluminium Formwork) Mr. Purushotham

    DAY-1

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    4/23

    Friday, 24th July 2009

    SESSION - V

    10.00 10.30 Reliability Study of Formwork Sytems Dr. Devdas Menon &Mr. T Prakash, IIT Chennai

    10.30 11.15 Product Presentation NOE

    11.15 12.00 Product Presentation MEVA

    12.00 12.30 Tea Break

    SESSION - VI

    12.30 13.00 Technical Paper Presentation Mr. A B Karnik

    (Staging and shuttering gantry in structural

    steel for PSC Box Girder Bridge)

    13.00 13.30 Technical Paper Presentation Mr. K.V. Srikanth

    (Formwork Applicable Codes, Safety and Failure)

    13.30 14.00 Technical Paper Presentation Mr. Laxmikanta Tripathy

    (Role of Formwork in RCC - A Case Study)

    14.00 15.00 Lunch Break

    SESSION - VII

    15.00 15.30 Technical Paper Presentat ion

    (In Built Ferrocement Structural Formwork) Mr. J.A. Desai

    15.30 16.00 Technical Paper Presentation : (Formwork) Dr. S A Reddi

    16.00 16.30 Tea Break

    DAY-2

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    5/23

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    6/23

    Seminar VenueL&T ECCConvention Center

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    7/23

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    8/23

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    9/23

    Key-Note Address by Dr. A. Ramakrishna

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    10/23

    400+ delegates Inclusive of 125 students

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    11/23

    Key Note address :-

    Cost of formwork / staging reach upto 40% of concrete cost.

    The use of conventional vs. System formwork has to be studied properly in

    this context to get maximum speed, quality, safety and economy. The use of system formwork in various specialty jobs viz. Domes, shells,

    tunnels, cooling towers has now proved that the overall satisfaction can beachieved

    The formwork design of Bahai - lotus temple, Delhi, was extremely difficult.

    It consumed about 5 and half years time, but the end results were extremelysatisfactory.

    The slipform method and Push-Launching operation used for construction ofKonkan Railways highest bridge could complete the project on time andexpected quality and budjet.

    Use of System formwork shall be made as a RULE Preplanning is extremely important to get the EXCELLENTresults.

    A few components which are subjected to rusting need to Galvanized forlong life.

    The options likePurchase, Hire, by-back etc are available with the systemformwork manufacturers.

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    12/23

    Presentation by MEVA Formwork SystemMr. Mark Rose (Austria)

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    13/23

    Aspects that affect the Formworkppt by Mr. Mark Rose (@ Meva)

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    14/23

    Innovative Bridge Launching System discussed by Mr. A. B. Karnik

    during his presentation on Enabling works

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    15/23

    Key points discussed during the Session are as listed below

    Use of Timber from cold countries (Scandinavian) countries is advisable ascompared to the timber from tropical countries.

    The participation of students in such engineering activities shall encouragedand shall be appreciated.

    Dr. Shivaram Sharma (HeadR & DL&T) presented his paper onFormwork for Self compacting concrete which received overwhelmingresponse.

    The use of VMA (viscosity modifying agents) in SCC was discussed indetail

    The latest developments in the filed of SCC (VMA, Rheometer, effect of theformwork etc) were discussed and debated.

    The Q-&-A session followed by each session was also very informative.

    The EFNAARC guidelines, 2005, flow test, V-Funnel test etc. were alsodisused.

    The speech by Mr. C. V. Kand on the failure case studies was liked by everyone. Mr. Kand explained the failure of formwork / staging and variousconstruction practices. Mr. Kand also emphasized on the prayer to be

    oofered after construction of any structure for the goodwill of the people.

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    16/23

    Key points discussed during the Session are as listed below

    The speech by Mr. C. V. Kand on the failure case studies was liked by everyone. Mr. Kand explained the failure of formwork / staging and variousconstruction practices. Mr. Kand also emphasized on the prayer to be offered

    after construction of any structure for the goodwill of the people.

    Staging placed onback filled soilshall be

    discouraged.In one case theformwork jammedin between the pierand the bearing and

    the collapsehappened.

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    17/23

    Key points discussed during the Session are as listed below

    Dr. Menon (IIT-Chennai) and his student Mr. Prakash, presented their paperon Reliability analysis for the Formwork, using Monte-Carlo technique. Thetechnique appears to be bit complex but by the use of tools viz. tables,

    graphs, software it should give more economy in future.

    Mr. V. V. Gadgil (the originator of the Idea of this seminar) addressed theaudience on second day. Explained the importance of the formwork / stagingin Mega projects.

    Bridge failure in Cuttak, 15.07.2009

    India has shown 9% GDP growth inthe recent days of global slow down,hence its very encouraging for theIndustry and investors too.

    Mr. Shrinath (HODFormworkdivision of L&T) discussed varioussafety aspects about the formwork andstaging and the research work done attheir own testing laboratory.

    The draft code IRC-87 (under widecirculation) was noted.

    ildi f l h i

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    18/23

    Building of Unusual Shapein L&T campus

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    19/23

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    20/23

    Building Standing on Single column within the premises of L&T

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    21/23

    Parking Shed

  • 7/28/2019 20) PPT-ACI - Seminar - 23, 24 July09-Outside

    22/23

    Over whelming response received to the event

    Ch i Ai t