Upload
rajeev-reddy
View
216
Download
0
Embed Size (px)
Citation preview
7/23/2019 2005 Act
1/72
Frmat. 4 (1) b (ii)
ORIGIN OF DEPARTMENT
Under the Ministry of Tribal Welfare, a separate engineering Wing has been established
and functioning with effect from 1-3-198, e!clusi"ely for tribal Welfare #epartment to
attend to the wor$ in tribal areas% With the creation of separate &ngineering Wing, theerstwhile Tribal &ngineering 'ectors functioning under (iri)an *o-operati"e *orporation
and integrated Tribal #e"elopment +gencies, ha"e been reorganied and merged with
Tribal welfare &ngineering Wing by transferring all posts carried by these sectors as perthe +nne!ure appended to the (%%Ms%.o%/9, dt% 19-3-8%
0or speedy and effecti"e e!ecution of wor$s in Tribal +reas in the 'tate% (o"ernment
ha"e sanctioned the following posts "ide (%%Ms%.o%8, dt% 2/-/-8/%
1% 1 ost of *hief &ngineer with supporting office staff
2% 2 osts of 'uperintending &ngineers with supporting office staff
3% 4 osts of &!ecuti"e &ngineers with supporting office 'taff%/% 14 osts #y%&!e%&ngineers with supporting office staff
% / osts +sst% &!ecuti"e &ngineers5+ssistant &ngineers
'ubse6uently with added programmes, the department has been strengthened by certain
additional staff from time to time as follows%
(%%Ms% .o%12, dt% 24-4-198 1 'uperintending &ngineer, post with supporting
office staff%
7 / #y%&!ecuti"e &ngineers with supporting officestaff
(%%Ms%.o%22, dt%2-1-8 1 #i"ision with 2 sub-di"isions for 'ri$a$ulam #ist, with supporting office staff as indicated in the
+nne!ure%
1 #i"ision with 1 sub-di"ision with supportingoffice and field staff as per the anne!ure%
The Tribal Welfare &ngineering #epartment has been functioning with the
following total staff under "arious catewgories%
'%.o% #esignation .o% of posts%
1 *hief &ngineer :ead of the #epartment% 1 .o%
2 'uperintending &ngineer ;ncharge of *ircle< 3 including one post of #y%*hief &ngineer in ffice
of the *hief &ngineer, TW%
3 &!ecuti"e &ngineer ;ncharge of di"ision< 9 .os%
/ #eputy &!ecuti"e &ngineer incharge of sub-
di"isionoth 'tate and *entral
(o"ernment and also for administration of theentire department%
2% #eputy *hief &ngineer% Wor$s in the *hief &ngineers office under the
direct control of the *hief &ngineer and e!ercisepowers delegated to him on administrati"e matters
pertaining to office staff% :e also assists the *hief&ngineer on all technical and administrati"e
matters%
3% 'uperintending &ngineer% :e is incharge of administrati"e *ircle of the
#epartment, answerable to the *hief &ngineer in
+dministrati"e and Technical controls of wor$s and
incharge of the offices of the department with in hiscircle%
/% &!ecuti"e &ngineer% ;s incharge of the &!ecuti"e Unit #i"ision< of thedepartment and answerable to the 'uperintending
&ngineer for e!ecution and management of all
wor$s with in his di"ision%
% #eputy &!ecuti"e &ngineer% ;s incharge of &ngineering 'ub-di"ision, answerable
to the &!ecuti"e &ngineer of the #i"ision for
management and e!ecution of wor$s within the sub- di"ision%
4% +sst%&!e%&ngineer 5 ;s incharge of the wor$s assigned for in"estigation+ssistant &ngineer preparation, e!ecution and recording measurements
in M%>oo$s, preparationof wor$s5firm bills etc%, for
the wor$s grounded and supplies made% :e wor$sunder the #y%&!e%&ngineer% :e e!ercises control
o"er the wor$ inspectors for close super"ision of
wor$s and maintenance of field records%
7/23/2019 2005 Act
4/72
.4.
Format 4(i) b (ii)
1< Chie E!"i!eerB
1% owers B-
*hief &ngineer is the +dministrati"e and Technical head of the Tribal Welfare
&ngineering #epartment and professional ad"isor to (o"ernment in all
matters relating to the Tribal Welfare &ngineering #epartment% :e co-ordinates with the commissioner, tribal Welfare at 'tate le"el in planning
e!ecution and monitoring of &ngineering wor$s%%
The *hief &ngineer prepares annual budgetary plan of wor$s andestablishment under his control, obtains (o"ernment appro"al and incur
e!penditure accordingly%
:e shall e!ercise control o"er functioning of subordinate offices and monitorsthe progress of de"elopmental wor$s in Tribal areas in the 'tate%
:e shall re"iew and monitor the progress of wor$s and underta$es field
inspection of wor$s and conducts periodical re"iew meetings with his sub-
ordinates and apprise the (o"ernment%
The *hief &ngineer submit proposals to the (o"ernment with regards to the
transfers and postings of 'uperintending &ngineers and &!ecuti"e &ngineers%
The *hief &ngineer will conduct annual inspection of circle offices under his
control%
#) $%&eri!te!'i!" E!"i!eer
owersB
The +dministrati"e unit of Tribal Welfare &ngineering #epartment at the
regional le"el is the *ircle and each *ircle is headed by the 'uperintending
&ngineer% There are two full-fledged *ircles in TW in addition to one postof 'uperintending &ngineer &!-fficio< The 'uperintending &ngineer reports
to the *hief &ngineer on all +dministrati"e and Technical matters%
:e e!ercised control o"er sub-ordinate offices in regard to e!ecution and
monitoring of de"elopmental wor$s in Tribal areas under his )urisdiction%
;t is the duty of the '%&% to inspect the important wor$s in his circle, to satisfy
himself that the system of management in e!ecution of wor$s is efficient,
economical and that the regulations on 6uality and 6uantity of wor$s, st4c$
and accounts are strictly obser"ed%
7/23/2019 2005 Act
5/72
%%
:e should re"iew and monitor the progress of wor$s by underta$ing field
inspections of important wor$s, conducting periodical re"iew meetings withhis sub-ordinates and appraising the superiors%
:e should maintain all necessary records and registers prescribed and conductannual inspection of di"ision offices%
:e should $eep a confidential record of performance of the contractorse!ecuting the wor$s in the di"ision and ta$es suitable steps while entrusting
the wor$s%
:e is responsible for scrutiniing the estimates recei"ed from sub-ordinateoffices and accord technical sanction to the estimates with in his powers and
submit to the higher office for obtaining technical sanction to the estimates
beyond his powers%
3. Ee%ti*e E!"i!eer
:e is answerable to the 'uperintending &ngineer for the e!ecution andmanagement of all wor$s within his di"ision% :e reports to the
'yuperintending &ngineer5ro)ect fficer of ;T#+5#istrict *ollector as the
case may be on administrati"e matters and also for financial sanction of thewor$s% :e is responsible for implementation of wor$s programme and
maintenance of accounts according to the standing instructions of the
department% The &!ecuti"e &ngineer will submit his accounts regularly to the
audit office under the rules in force and will e!ercise full and efficient controlo"er his #i"isional +ccounts fficer%
:e e!ercises control o"er sub-ordinate offices and responsible for e!ecutionand monitoring of de"elopmental wor$s in Tribal area under his )urisdiction%
:e is responsible to underta$e proper measures to e!ecute infrastructuralde"elopment wor$s in Tribal sub-plan T'< area of ;T#+ @ .on ;t#+ in his
di"ision%
:e is prohibited from allowing any sub-ordinate officer to start5ground anywor$ without obtaining proper administrati"e and technical sanction from the
competent authority%
;t is the duty of the &!ecuti"e &ngineer to see that the accounts of a wor$ are
closed and a completion report is prepared @ appro"ed by the competent
authority immediately after the completion of the wor$%
:e is the primary disbursing office of the di"ision and is thus responsible not
only for the financial regularities and the transactions but also for the proper
maintenance of accounts as per rules%
7/23/2019 2005 Act
6/72
%4%
The &!ecuti"e &ngineer is responsible for the correctness of the original
records of cash and stores, receipts and e!penditure and submission ofcomplete "ouchers in proper way to the audit agencies concerned :e should
prepare monthly accounts regularly and maintain as per rules and produce to
the audit party whene"er they "isit the di"ision for audit%
:e should see that the accounts of the di"ision do not fall into arrears and he
should maintain all the prescribed registers on the accounts side% ;f anycomplication arises, on the ad"ice of the #+ W< he should see$ the
assistance and ad"ice of the +(50inancial +d"isor% :e has a right to see$ the
ad"ise of respecti"e authorities in all matters connected with the di"isional
accounts and in the application of financial5accounts rules%
:e is primarily responsible for reporting to higher authority without delay,
supported if necessary by a wor$ slip, the probability of any e!cess o"er the
estimates, all important liabilities not brought on the accounts and promptre"ision of the estimates where e"er necessary%
:e is responsible to see that machinery, sur"eying, mathematical and
scientific instruments of the di"ision are properly maintained and should
report their condition to the 'uperintending &ngineer periodically%
:e is responsible for all the stores re6uired in his di"ision and he should
conduct annual physical "erification of store as on 31stMarch, e"ery year%
The &!ecuti"e &ngineer is responsible for the &ngineering features of the
design of the wor$s and the rates adopted in the respecti"e estimates proposed
and appro"ed by him%
:e is fully responsible for obser"ing standards of financial proprietor and for
the ad)ustment of ad"ances gi"en to his subordinates5others%
The &!ecuti"e &ngineer should inspect all wor$ spots or sites before technical
sanction is accorded for the detailed estimates%
The &!ecuti"e &ngineer primarily responsible for watching the progress of
e!penditure of all the wor$s against appropriation and is re6uired to ta$e
necessary steps for obtaining grants by way of re-appropriation orsurrendering probable sa"ings%
:e should maintain all rele"ant records and registers prescribed to the di"ision
:e should $eep a confidential record containing the performance of the
contractors e!ecuting the wor$s in the di"ision and he refers the record to the
authorities concerned before awarding wor$s to them for e!ecution%
7/23/2019 2005 Act
7/72
%%
:e is responsible for scrutiniing the estimates recei"ed from subordinate
offices and accord technical sanction to the estimates under his powers orsubmits to the higher office for obtaining technical sanction to the estimates
beyond his powers as per codal pro"isions%
:e should conduct annual inspection of sub-di"ision offices regularly and
should chec$ measure /8 wor$s and super chec$ /8 wor$s in a financial year
;t shall be the responsibility of &!ecuti"e &ngineer to continuously assess there6uirement of wor$ charged staff and see that the e!penditure does not
e!ceed the annual accrual of petty super"ision charges pro"ided in the
estimate%
4. De&%t+ Ee%ti*e E!"i!eer
:e e!ercises control o"er sub-di"isional staff, materials and e!ecution of all
wor$s in his )urisdiction%
:e ta$es care of the (o"ernment properties under his control and see thatsuitable and remedial actions are ta$en for proper up-$eeping of them
regularly and also arrange for proper protection, in case of natural calamities
etc%,
:e is responsible for spending grants in time properly%
:e super"ises the e!ecution of wor$s ta$en up by the department fore!ecution through "oluntary agencies5contractors5Mahila Mandals5Cillage
#e"elopment *ommitties C#*7s< etc%, in accordance with the sanctioned
estimates, +greements concluded in case of wor$s e!ecuted throughagencies< as per +#'', +ndhra radesh ublic Wor$s #epartment code, and
other instructions of the superiors under his )urisdiction @ by his subordinates
and timely chec$ measure the wor$s recorded by the +&&5+& wor$ing underhim%
:e will scrutinie the estimates recei"ed from sub-ordinates and accord
technical sanction to the estimates under his powers and submit to the higheroffice the estimates beyond his powers for obtaining technical sanction% :e
will scrutinie the wor$ bills for the wor$s complained or partly completed
and arrange payment or submit to the higher office for arranging payment% :ewill arrange the payment of salaries to all the staff wor$ing under him on the
1stof succeeding month%
:e should close all the maintenance estimates before 31stof March e"ery year
and special repairs estimates before closure of "alidity period%
7/23/2019 2005 Act
8/72
%8%
:e should appraise the progress in e!ecution of wor$s to the superiors
periodically through progress reports and in the meetings held by them andalso report to the superiors the problems faced in e!ecution of wor$s, if any,
for ta$ing remedial measures or actions according to the codal rules and
instructions of superiors%
:e should dispose references at the earliest and should tour bris$ly and
purposefully and also inspect the wor$s fre6uently%
:e is responsible for timely ad)ustment of ad"ances ta$en for the efficient
functioning of all the machinery under his control% :e is responsible for
up$eep of wor$s5+ccounts records and for producing at the time of audit andfor preparing and submitting replies to the audit paras%
:e will maintain the prescribed registers in the sub-di"ision both in technical
and accounts wing and send the prescribed returns to the superiors%
:e should $eep himself abreast of the latest de"elopment in his field, dulyreading the )ournals, periodicals, etc%, :e will discharge all official functions
entrusted to him by the superior officers% :e should conduct half-yearly
physical "erification of stores and conduct annual inspection of sectionoffices under him%
When posted as + or T+ to *hief &ngineer or 'uperintending &ngineer, in
the office he will loo$ after the wor$ of section allotted to him and he isresponsible to the *& or '& respecti"ely in carrying out his duties such as
ad"ice and correspondence on technical matters, scrutiny of estimates and
putting up for technical appro"al5sanction for onward submission to higheroffice in case of '&s offices< for obtaining the same, scrutiny of bills,
preparation of designs preparation of notes @ reports for the meetings,
preparation of progress reports, loo$ing after the maintenance of "ehicles,loo$ing after the maintenance and operation of computers etc%,
,. A--i-ta!t Ee%ti*e E!"i!eer-A--i-ta!t E!"i!eer-.
+ sub-di"ision is di"ided into sections at field le"el and each section is
headed by an +ssistant &!ecuti"e &ngineer5+ssistant &ngineer and he is the
first le"el functionary and e!ecuti"e sub-ordinate head to the sub-di"ision i%e%#eputy &!ecuti"e &ngineer% :e is responsible for management of wor$
charged establishment, materials at stores5site and e!ecution of
de"elopmental wor$s in Tribal areas% :is role is pi"otal to the department heis the officer at the cutting edge le"el%
7/23/2019 2005 Act
9/72
%9%
:e will super"ise the e!ecution of wor$s entrusted to department or
agencies5contractors5Mahila Mandal5Cillage #e"elopment *ommitteesC#*7s< etc% by superiors in accordance with the sanctioned estimates%
+greements concluded in case of wor$s e!ecuted through agencies< as per
+#'' +ndhra radesh ublic Wor$s #epartment code +W#*< underthe )urisdiction and timely record measurements in the M%>oo$s of the wor$s
e!ecuted and submit to higher office for chec$measurement%
:e is the custodian of the (o"ernment properties under his )urisdiction and
ta$e suitable remedial actions for their proper up$eep regularly and ma$e
arrangements for protecting them incase of natural calamities%
:e will prepare the estimate after sanction of wor$s ans submit to higher
office for obtaining technical sanction% :e will prepare the wor$ bills for the
wor$s completed or e!ecuted up to an acceptable le"el and submit to higher
office for arranging payment% :e will maintain the muster rolls of wor$charged establishment and submit the same to higher office on 1 stof e"ery
month for arranging payment%
:e should appraise the progress in e!ecution of wor$s to the superiors
periodically through progress reports and in the meetings held by them% :eshould appraise or report o them the problems faced, de"iations obser"ed in
e!ecution of wor$s, remedial measures to be underta$en according to the
codal rules @ instructions of superiors and ta$e up the same as per
instructions of the superiors%
:e will maintain the prescribed registers in the section relating to wor$s,
accounts, stores, materials, at site machinery and T@ etc%,
:e should $eep himself abreast of the latest de"elopment in engineering field
by reading )ournals and periodicals% :e will discharge any other officialsfunctions entrusted to him by the superior officers%
When posted in the office posts, he will loo$ after the section allotted to him
and report to #&& in carrying out his duties, such as correspondence ontechnical matters, scrutiny of estimates @ putting up for technical
appro"al5sanction for on ward submitting them to higher office in case of
#&&s,&es and '&s ffices< for obtaining the same, scrutiny of bills,preparation of designs, preparation of notes @ reports for the meetings,
preparation of progress reports, loo$ing after the maintenance of machinery
and T@ loo$ing after the maintenance and operation of computers etc%
7/23/2019 2005 Act
10/72
%1%
Oie E-tab/i-hme!t
De&%t+ Chie E!"i!eer0
The post of the #eputy *hief &ngineer is of the ran$ of 'uperintending&ngineer, which is created in the office of the *hief &ngineer to assist the
*hief &ngineer in discharging his official functions% :e will be in o"er all
control of office administration and is responsible for correctness of alltransactions ta$en place in all wings of *hief &ngineers office and is
responsible for maintenance of all re6uired registers in all the wings% :e
should watch the release, ad)ustment and utiliation of grants and re"iew the
progress reports and ad"ises the *hief &ngineer on the steps re6uired to beta$en from time to time% :e is responsible for obtaining Utilisation
*ertificates and clearing the audit paras and conduct of timely annual
inspections% :e can call for and submit any factual information and is
responsible for obtaining and timely disposal of estimates and tender% :e isresponsible for maintaining office discipline and for chec$ing of personal
registers ?s< of all the office staff and maintain good wor$ing en"ironment%:e will represent the *hief &ngineer in all meetings when *hief &ngineer is
not in head 6uarters%
PA TA- to Chie E!"i!eer
They wor$ under he direct control of #eputy *hief &ngineer and report him
in the matters relating to the sections entrusted to them%
PA TA- to $%&eri!te!'i!" E!"i!eer
They wor$ under the control of 'uperintending &ngineer and report to him
in the matters relating to the 'ection entrusted to them%
Di*i-io!a/ Ao%!t- Oier 2or- a!' other ra!he
#i"ision office mainly consists of three sections 1< +ccounts 'ection 2oo$s%
/% reparation of annual >udget for all staff in the di"ision and all wor$sprogramme in his )urisdiction to be submitted to %% ;T'+, and
'uperintending &ngineer%
/1% 'ubmission of Utilisation certificates for the grants recei"ed%/2% 'ubmission of +nnual +dministrati"e ?eport of the di"ision%
/3% ayment of pay and allowances to staff wor$ing in his di"ision%
//% 'anction of annual increments to the staff in his office and up to #eputy&!ecuti"e &ngineer le"el%
/% :e is responsible for all payments including wor$ bills%
/4% :e is technical ad"isor to the ro)ect fficer, ;T#+, concerned%
/% To prepare plan of action to be included in fi"e year plan and annual plans inrespect of all types of wor$s being e!ecuted by the di"ision%%
/8% The &!ecuti"e &ngineer is prohibited from commencing any wor$ or
incurring e!penditure of any public funds without the sanction by the
competent authority or from ma$ing any de"iations from sanctioned designsin the course of e!ecution, e!cept in case of emergency%
/9% 'ending proposals to the competent authority and obtaining e!tension of timeon the agreements of wor$s whichare not completed within the prescribed
time%
% The following course of action is to be followed in case of surplus materials tobe reco"ered from the contractors or any outstanding reco"eries tobe effected
for fraud%
i< ;nitiate action as contemplated at art ;; of (%%21, dt%1-12-198/
of ;rrigation #ept on the contractor%ii< Aoading olice complaint for loss%
iii< +ddress sister-engineering department to reco"er from
bills5deposits due to them% ;n case of non reco"ery, addressing?e"enue #epartment for reco"ery under ?%?%+ct%
1% :e is responsible for sending reply in 1 days to the notices gi"en by the
contractor%2% Unit officer for ministerial staff for all the posts below the ran$ of
'r%+ssistants in di"isional office @ 'ub-ordinate offices (%%Ms%.o%11/,
dt%3-12-99 of '%W% TW%'er-;;< #ept%
) $tat%tor+ F%!tio!-.
1% ?egistration of class ;;; contractors (%%Ms%.o%4, dt%3--99 of '%W%2% +ccording technical sanction to original estimates, re"ised estimates and
wor$ing estimates costing up to ?s%1% la$hs (%%Ms%.o%4, dt%3--99 of
'%W%3% *alling Tenders of wor$s costing up to ?s%1% la$hs% (%%Ms%.o%4, dt%3-
-99 of '%W%
%2/%
7/23/2019 2005 Act
24/72
/% +ccepting the tenders up to 1E e!cess o"er estimated rates for the wor$s
costing up to ?s%1% la$hs (%%Ms%.o%4, dt%3--99 of '%W%
% assing e!cess e!penditure up to E abo"e the technical sanction amount ofthe wor$ sub)ect to the limit of technical sanction powers (%%Ms%.o%83,
dt%1-/-8 of '%W%. consolidation, >lac$ topping of >%T%
?oads, etc%, and he is responsible for timely e!ecution and for maintaining the
6uality in the e!ecution of wor$s%
4. 0or all ma)or wor$s costing beyond ?s%1,,5- he should personally chec$
the mar$ out%
b) De- F%!tio!-
1% :e will manage the e!ecution of wor$s efficiently in the sub-di"ision%
2% :e will e!ercise administrati"e control o"er the staff in the sub-
di"ision
3% :e will scrutinie the final wor$ bill recei"ed from +&&s5+es for thewor$s completed and submit to higher office for arranging final
payment along with the completion reports% 0or the wor$s completedup to an acceptable stage, he has to scrutinie part bills recei"ed from
the +&&s5+es and submit to higher office for arranging part payment%
/% reparation of time schedule co"ering all acti"ities of the wor$, for itse!ecution within the time stipulated in the agreement for completion of
wor$ and enforcing item%
% :e has to monitor the progress of wor$s and issue notices to
contractors with reference to the clauses and conditions of theagreement and clause 4 of +#'', if the contractor fails to start the
wor$ with in the stipulated time or fails to maintain the stipulated rate
of progress and report to &!ecuti"e &ngineer% :e should promptlyreply to the notices from the contractors%
4% :e is responsible for correctness and proper maintenance of ?oad
Metal ?ate boo$s @ Duarry charts%% :e is responsible for e!tracting the wor$ from the Wor$-charged
establishment%
8% :e will get the maintenance estimates prepared by +&&5+& for all the
departmental assets under his )urisdiction and submit to the higheroffice &&< e"ery year for necessary appro"als and sanctions%
9% :e will appraise the progress in e!ecution of wor$s to the && and '&
periodically through progress reports, in the meetings con"ened, andduring field "isits% :e has to bring out field problems, if any in the
e!ecution of wor$s during the field "isits of && and '&%
1% 'ubmission of information re6uired by *hief &ngineer, 'uperintending&ngineer, &!ecuti"e &ngineer and ro)ect fficer from time to time%
%24%
7/23/2019 2005 Act
26/72
11% :e is responsible for the proper maintenance of accounts li$e material
at site account, 0 account, etc%, and for submission of basic periodical
returns relating to the accounts, progress of wor$s, etc%,12% :e is responsible to bring to the notice of the &%&% about the materials
that are not in use for the last 4 months%
13% :e will arrange the supply of materials that are supplied bythedepartment to the contractors%
1/% :e is responsible for reporting the unutilied5surplus material if any in
the sub-di"ision to his &!ecuti"e &ngineer% :e is responsible forutiliing the material recei"ed by him with in 3 months in his sub-
di"ision% :e is responsible for assessing the re6uirements of materials
well in ad"ance and submitting to &!ecuti"e &ngineer%
1% :e will furnish the re6uired records to the +udit authorities as andwhen they are re6uested by the +udit party during audit inspection of
'ub-di"ision5#i"ision%
14% :e will maintain registers indicated in subse6uent chapter-11
1% :e should discharge any Maintenance of #A?7s and monthly returnsof Tools and lants under his control
18% other official duty entrusted by his superior officers19% 'ubmission of proposals to the &!ecuti"e &ngineer for e!tension of
time to the agreements of wor$s which are not completed with in the
prescribed time%2% To recommend reco"eries for the departmental materials, hire charges
from his wor$ bills and other reco"eries due to the (o"ernment to be
effected from the contractors bills
21% To submit reports on A+Ds, A'D, ?'D @ +ssurances on the floor ofthe legislati"e +ssembly%
22% To prepare plan of action to be included in 0i"e Iear lan5+nnual
lans in respect of all types of wor$s being e!ecuted in his sub-di"ison%
23% reparation of >udget for the staff and wor$s programme in his
)urisdiction and submit to &%&%2/% :e has to $eep a watch on ad"ances gi"en to the 'ection officers in his
sub-di"ison%
2% +fter the competent authority accord administrati"e sanction, the #&&
has to get the #esigns, #rawings @ the detailed estimates prepared by+&&5+& chec$ them and submit to the higher office with in the
stipulated time for according technical sanction by competent
authority%24% The sub di"isional officer can grant lea"e other than special disability
lea"e< to wor$ charged estt% Up to one month at a time as para of
+ W# code%2% :e is responsible for spending all the grants allotted to him and to
spend the estimated cost on each wor$ before the lapsable date%
%2%
7/23/2019 2005 Act
27/72
28% :e is responsible for reporting to the &!ecuti"e &ngineer, any
de"iations5re"isions needed in the sanctioned estimates during
e!ecution based on local conditions for his orders% :e prepares andsubmits wor$ing estimate to the &!ecuti"e &ngineer for the same%
29% :e should conduct physical "erification of the store e"ery 6uarter :e
is responsible to obtain and submit M+' accounts to the &!ecuti"e&ngineer, before thof e"ery month%
3% :e should dispose off references recei"ed by the sub-di"ision in 1
days%31% :e should $eep himself abreast of "arious new de"elopments in his
field and regularly study &ngineering boo$s, )ouirnels, magaines,
codes and the "arious technical papers%
32% :e should ta$e initiati"e in all matters and de"elop a spirit of self-confidence and be in a position to instruct and guide his subordinate
boldly, correctly and unhesitatingly%
33% *onducting monthly re"iews with sub-ordinates and issue instructions
for timely completion of schemes%3/% To guide the 'ection fficers on the matters of wor$s programme%
3% reparation of annual account of profit and loss of T@34% To initiate pension and gratuity papers for wor$ charged establishment
3% ayment of salaries to staff wor$ing in his sub di"ision, including
wor$ charged establishment%38% To attend meetings of &&, '& @ % ;T#+
39% :e is responsible for optimum utilistaion of machinery and tools @
plants under his control%
/%
C) $tat%tor+ %!tio!-.
1% :e will chec$ measure the measurements recorded by +&&5+& inM%>oo$ promptly, after the wor$ reaches a desired le"el or is
completed% :e has to chec$ measure the pre-measurements for
reinforcement of ?** wor$s recorded by +&&5+& in M%>oo$s beforelaying concrete%
2% :e will submit the M%>oo$s of the wor$s to &!ecuti"e &ngineer after
the chec$ measurements and also whene"er re6uired by the &!ecuti"e
&ngineer%
,. A--i-ta!t Ee%ti*e E!"i!eerA--i-ta!t E!"i!eer.
a) Fie/' F%!tio!-.
1 +fter the competent authority accorded administrati"e sanction, the
+&&5+& has to inspect the site, conduct in"estigation and preparedesigns, drawings @ detailed estimate and submit to the higher office
within the stipulated time for according technical sanction%
%28%
7/23/2019 2005 Act
28/72
1% :e will gi"e mar$-out, super"ise the e!ecution of wor$s in accordance
with the sanctioned estimate, agreement concluded, +#'', + W#
code and other circular instructions issued by :igher fficers and(o"ernment from time to time% :e has to ensure 6uality of raw
materials used and good wor$manship in e!ecution of wor$% :e is
primarily responsible for timely e!ecution and for maintaining the6uality in the wor$s programme%
2% To ta$e wor$ing le"els at the time of e!ecution to confirm the
alignment of pipelines proposed in the sanctioned estimate and >ridge0oundations, fi!ing of foundation le"els with respect to ground le"els
in construction of buildings, etc%
3% ;n case of breach of roads it is the duty of +&&5+& to form di"ersion
roads to a"oid hindrernce to the traffic%/% :e is responsible for remo"ing the re)ected materials from the site in
case the contractors fail to remo"e with in 2/ hours in compliance to
the written instructions of &!ecuti"e &ngineer concerned at
constructors e!penses %'%ara 2 of +#''oo$s with reference to sur"ey records
and drawings%
% :andling drawing materials, custody of drawing materials and propermaintenance of their account%
4% +ny other wor$ that may be assigned by an appropriate authority%% +ll the duties of #%M%-; when he wor$s in di"ision%
8) Dra%"ht-ma!. Gra'e9III
a) De- F%!tio!-
1. +ll the estimates with data will be scrutinied when he wor$s in sub- di"ision%
#. +rithmetical chec$ing of calculations, details of 6uantities etc%, using
computers if a"ailable%
3. Maintenance of drawing records, original plans of schemes etc%,
4. +rithmetical chec$ing of estimates%
6. *omparing typed matter, estimates%
,. *opying of estimates, statements, analysis of rates etcl
7. reparation of simple drawings from s$etches%
8. +ny other wor$ that may be assigned by an appropriate authority%
:) Traer0
b)De- F%!tio!-0
1%%Tracing of the drawings assigned to him by the appropriate authority
and assists in preparing copies of tender schedules%
2 %+ny other wor$ that may be assigned by an appropriate authority
%31%
7/23/2019 2005 Act
31/72
1;) /%e Pri!t O&erator
a) De- F%!tio!-0
1%peration and proper up$eep of the >lue rint Machine for ta$ing out
>lue prints of the drawings assigned to him by appropriate authority and
assist in preparing copies of tender schedules%2% +ny other wor$ that may be assigned by an appropriate authority%
11) $%&eri!te!'e!t%
a) De- F%!tio!-0
1% &!ercise control o"er 'enior +ssistant, =unior +ssistant and Typist%
2% +ssist the head of the office in all financial and ser"ice matters ofemployees scrutinies their application for lea"es, ad"ances,
deputations, promotions etc%,
3% Maintenance of the 'er"ice ?egisters%
/% To watch receipt of Utilisation *ertificates by maintaining registers ofbudget @ releases%
% To assist the #i"isional +ccounts fficer in maintenance of accounts%4% +ny other wor$ that may be assigned by an appropriate authority%
1#) $e!ior A--i-ta!t
7/23/2019 2005 Act
32/72
162athma!
a) $tat%tor+ %!tio!-.
1% Keeping watch and ward on the office building, files and in"entories
2% during the night time and pre"enting from any theft or loss or fireduring the night time%
1,) Dri*er.
a) $tat%tor+ %!tio!-.
1% ;t is the duty of the dri"er attached to the (o"ernment "ehicles to get
the entries in the log boo$ filled in%
2% (o"ernment "ehicles shall be dri"en only by the dri"ers attached tothem% Under no circumstances the "ehicle shall be dri"en by officers
using them, pro"ided that in the absence of a dri"er for any car and in
an emergency, the officer-in-charge may nominate a member of the
staff to dri"e the "ehicle% The member so nominated should posses a"alid dri"ing license%
ro"ided that where the :ead of a #epartment accords permission interms of rule 1 b< of abo"e (%% an officer pro"ided with a
(o"ernment "ehicle may dri"e the "ehicle either by himself or utilie
the ser"ices of an +ttender-cum-dri"er possessing "alid dri"ing licensefor dri"ing the "ehicle%
3% Motor "ehicle dri"es shall on no account dri"e the "ehicle at a speed
of more than Kms per hour or at the notified mileage, whiche"er is
less% ;n the city and municipal limits and built-up areas and in hea"ytraffic, they should in"ariably dri"e safely with low speeds% The
"ehicle should ne"er be o"er-loaded%
/% The life of a motor "ehicle depends on the regular and systematicattention being gi"en to it% The dri"er should see that the "ehicle
allotted to him is properly cleaned daily% :e should also e!amine daily
the water le"el in the radiator, oil le"el in the cran$ case, tyre pressureschec$ up petrol and distilled water le"els in the battery% The dri"er
concerned will be primarily responsible for any damage that may be
caused to a "ehicle and its cost will be reco"ered from him unless he is
able to gi"e satisfactory e!planation for it%% Tyres should be got retreated before they go bald and re6uire
replacement%
4% ?eport the repairs needed immediately as soon as he notices it%% #uring the "ehicle repairs, the dri"er is responsible for all
replacements and repairs, +ll unser"iceable articles should be ta$en
bac$ by him after the repairs are o"er% :e should hand o"er theunser"iceable articles in the office stores% :e should ac$nowledge the
receipt of bills in to$en of certificate that the repairs are carried out
satisfactorily%
%33%
7/23/2019 2005 Act
33/72
17)Di*i-io!a/ Ao%!t- Oier (2or-)
a) $tat%tor+ %!tio!-.
1% :e should comptle accounts of the #i"ision in accordance with the
prescribed rules ara 89 a 1< J+ J code ara 33, of #-*ode
7/23/2019 2005 Act
34/72
12% :e is responsible for prompt submission of all periodicals and
maintenance of prescribed registers and records at di"ision le"el%
13% :e is responsible for o"erall administration of di"ision office and forall establishment and accounts matter (o"t5 #%.o%2393-
+53145w+15+1588, dt%23-9-98 of 0in% @ lg% #ept< and ara 1 of
+-*ode
7/23/2019 2005 Act
35/72
Format 4 (i) b (iii)
ADMINI$TRATI=E ACCO>NTAILIT?
'%
.o
%
0unctionary +ccountable to whom
+uthority competent to ta$e
action in case of omission @
commissions%
1 *hief &ngineer (o"ernment of +ndhraradesh%
(o"ernment of +ndhra radesh,'ocial Welfare #epartment%
2 #eputy *hief&ngineer
*hief &ngineer (o"ernment of +ndhra radesh,'ocial Welfare #epartment
3 'uperintending
&ngineer
*hief &ngineer @
(o"ernment
(o"ernment of +ndhra radesh,
'ocial Welfare #epartment
/ &!ecuti"e &ngineer 'uperintending &ngineer
*hief &ngineerro)ect fficer%
(o"ernment of +ndhra radesh,
'ocial Welfare #epartment
#i"isional
+ccounts fficerWor$soo$s%
83% :e is responsible for timely ad)ustment of releases under "arious schemes and
proper accounting of grants and their re"alidation% :e should spend all grants
released to his di"ision before lapsing date and submit Utilisation *ertificatespromptly%
8/% To refund the deposits to the eligible contractors%
8% To submit reports on A+Ds5A'Ds5?'D and +ssurances on the floor of the+ssembly%
84% *onducting monthly re"iews with the #&&s@+&&s5+es @ ta$e suitable
measures for timely completion of schemes%8% 'ubmission of information re6uired by (o"ernment, *hief &ngineers,
'uperintending &ngineer and %% ;T#+, from time to time%
88% :e has to attend meetings con"ened by the #istrict +uthorities%
89% :e has to attend the meetings con"ened by ro)ect fficer, ;T#+,'uperintending &ngineer and *hief &ngineer%
9% ;ssue of inspection reports on the wor$s inspected during the field "isits%
91% To maintain 6uarry charts and ?oad Metal ?ate >oo$s%92% reparation of annual >udget for all staff in the di"ision and all wor$s
programme in his )urisdiction to be submitted to %% ;T'+, and
'uperintending &ngineer%93% 'ubmission of Utilisation certificates for the grants recei"ed%
9/% 'ubmission of +nnual +dministrati"e ?eport of the di"ision%
9% ayment of pay and allowances to staff wor$ing in his di"ision%
%%
7/23/2019 2005 Act
50/72
94% 'anction of annual increments to the staff in his office and up to #eputy
&!ecuti"e &ngineer le"el%
9% :e is responsible for all payments including wor$ bills%98% :e is technical ad"isor to the ro)ect fficer, ;T#+, concerned%
99% To prepare plan of action to be included in fi"e year plan and annual plans in
respect of all types of wor$s being e!ecuted by the di"ision%%1% The &!ecuti"e &ngineer is prohibited from commencing any wor$ or
incurring e!penditure of any public funds without the sanction by the
competent authority or from ma$ing any de"iations from sanctioned designsin the course of e!ecution, e!cept in case of emergency%
11% 'ending proposals to the competent authority and obtaining e!tension of
time on the agreements of wor$s whichare not completed within the
prescribed time%12% The following course of action is to be followed in case of surplus
materials to be reco"ered from the contractors or any outstanding reco"eries
tobe effected for fraud%
i< ;nitiate action as contemplated at art ;; of (%%21, dt%1-12-198/of ;rrigation #ept on the contractor%
ii< Aoading olice complaint for loss%iii< +ddress sister-engineering department to reco"er from
bills5deposits due to them% ;n case of non reco"ery, addressing
?e"enue #epartment for reco"ery under ?%?%+ct%13% :e is responsible for sending reply in 1 days to the notices gi"en by the
contractor%
1/% Unit officer for ministerial staff for all the posts below the ran$ of
'r%+ssistants in di"isional office @ 'ub-ordinate offices (%%Ms%.o%11/,dt%3-12-99 of '%W% TW%'er-;;< #ept%
) $tat%tor+ F%!tio!-.
1/% ?egistration of class ;;; contractors (%%Ms%.o%4, dt%3--99 of '%W%
1% +ccording technical sanction to original estimates, re"ised estimates andwor$ing estimates costing up to ?s%1% la$hs (%%Ms%.o%4, dt%3--99 of
'%W%
14% *alling Tenders of wor$s costing up to ?s%1% la$hs% (%%Ms%.o%4, dt%3-
-99 of '%W%1% +ccepting the tenders up to 1E e!cess o"er estimated rates for the wor$s
costing up to ?s%1% la$hs (%%Ms%.o%4, dt%3--99 of '%W%
18% assing e!cess e!penditure up to E abo"e the technical sanction amount ofthe wor$ sub)ect to the limit of technical sanction powers (%%Ms%.o%83,
dt%1-/-8 of '%W%. consolidation, >lac$ topping of >%T%?oads, etc%, and he is responsible for timely e!ecution and for maintaining the
6uality in the e!ecution of wor$s%
%2%
7/23/2019 2005 Act
52/72
8. 0or all ma)or wor$s costing beyond ?s%1,,5- he should personally chec$
the mar$ out%
b) De- F%!tio!-
/1% :e will manage the e!ecution of wor$s efficiently in the sub-di"ision%
/2% :e will e!ercise administrati"e control o"er the staff in the sub-di"ision
/3% :e will scrutinie the final wor$ bill recei"ed from +&&s5+es for the
wor$s completed and submit to higher office for arranging finalpayment along with the completion reports% 0or the wor$s completed
up to an acceptable stage, he has to scrutinie part bills recei"ed from
the +&&s5+es and submit to higher office for arranging part payment%
//% reparation of time schedule co"ering all acti"ities of the wor$, for itse!ecution within the time stipulated in the agreement for completion of
wor$ and enforcing item%
/% :e has to monitor the progress of wor$s and issue notices to
contractors with reference to the clauses and conditions of theagreement and clause 4 of +#'', if the contractor fails to start the
wor$ with in the stipulated time or fails to maintain the stipulated rateof progress and report to &!ecuti"e &ngineer% :e should promptly
reply to the notices from the contractors%
/4% :e is responsible for correctness and proper maintenance of ?oadMetal ?ate boo$s @ Duarry charts%
/% :e is responsible for e!tracting the wor$ from the Wor$-charged
establishment%
/8% :e will get the maintenance estimates prepared by +&&5+& for all thedepartmental assets under his )urisdiction and submit to the higher
office &&< e"ery year for necessary appro"als and sanctions%
/9% :e will appraise the progress in e!ecution of wor$s to the && and '&periodically through progress reports, in the meetings con"ened, and
during field "isits% :e has to bring out field problems, if any in the
e!ecution of wor$s during the field "isits of && and '&%% 'ubmission of information re6uired by *hief &ngineer, 'uperintending
&ngineer, &!ecuti"e &ngineer and ro)ect fficer from time to time%
1% :e is responsible for the proper maintenance of accounts li$e material
at site account, 0 account, etc%, and for submission of basic periodicalreturns relating to the accounts, progress of wor$s, etc%,
2% :e is responsible to bring to the notice of the &%&% about the materials
that are not in use for the last 4 months%3% :e will arrange the supply of materials that are supplied bythe
department to the contractors%
/% :e is responsible for reporting the unutilied5surplus material if any inthe sub-di"ision to his &!ecuti"e &ngineer% :e is responsible for
utiliing the material recei"ed by him with in 3 months in his sub-
%3%
7/23/2019 2005 Act
53/72
% di"ision% :e is responsible for assessing the re6uirements of materials
well in ad"ance and submitting to &!ecuti"e &ngineer%
4% :e will furnish the re6uired records to the +udit authorities as andwhen they are re6uested by the +udit party during audit inspection of
'ub-di"ision5#i"ision%
% :e will maintain registers indicated in subse6uent chapter-118% :e should discharge any Maintenance of #A?7s and monthly returns
of Tools and lants under his control
9% other official duty entrusted by his superior officers4% 'ubmission of proposals to the &!ecuti"e &ngineer for e!tension of
time to the agreements of wor$s which are not completed with in the
prescribed time%
41% To recommend reco"eries for the departmental materials, hire chargesfrom his wor$ bills and other reco"eries due to the (o"ernment to be
effected from the contractors bills
42% To submit reports on A+Ds, A'D, ?'D @ +ssurances on the floor of
the legislati"e +ssembly%43% To prepare plan of action to be included in 0i"e Iear lan5+nnual
lans in respect of all types of wor$s being e!ecuted in his sub-di"ison%
4/% reparation of >udget for the staff and wor$s programme in his
)urisdiction and submit to &%&%4% :e has to $eep a watch on ad"ances gi"en to the 'ection officers in his
sub-di"ison%
44% +fter the competent authority accord administrati"e sanction, the #&&
has to get the #esigns, #rawings @ the detailed estimates prepared by+&&5+& chec$ them and submit to the higher office with in the
stipulated time for according technical sanction by competent
authority%4% The sub di"isional officer can grant lea"e other than special disability
lea"e< to wor$ charged estt% Up to one month at a time as para of
+ W# code%48% :e is responsible for spending all the grants allotted to him and to
spend the estimated cost on each wor$ before the lapsable date%
49% :e is responsible for reporting to the &!ecuti"e &ngineer, any
de"iations5re"isions needed in the sanctioned estimates duringe!ecution based on local conditions for his orders% :e prepares and
submits wor$ing estimate to the &!ecuti"e &ngineer for the same%
% :e should conduct physical "erification of the store e"ery 6uarter :eis responsible to obtain and submit M+' accounts to the &!ecuti"e
&ngineer, before thof e"ery month%
1% :e should dispose off references recei"ed by the sub-di"ision in 1days%
%/%
7/23/2019 2005 Act
54/72
2% :e should $eep himself abreast of "arious new de"elopments in his
field and regularly study &ngineering boo$s, )ouirnels, magaines,
codes and the "arious technical papers%3% :e should ta$e initiati"e in all matters and de"elop a spirit of self-
confidence and be in a position to instruct and guide his subordinate
boldly, correctly and unhesitatingly%/% *onducting monthly re"iews with sub-ordinates and issue instructions
for timely completion of schemes%
% To guide the 'ection fficers on the matters of wor$s programme%4% reparation of annual account of profit and loss of T@
% To initiate pension and gratuity papers for wor$ charged establishment
8% ayment of salaries to staff wor$ing in his sub di"ision, including
wor$ charged establishment%9% To attend meetings of &&, '& @ % ;T#+
8% :e is responsible for optimum utilistaion of machinery and tools @
plants under his control%
81%C) $tat%tor+ %!tio!-.
1% :e will chec$ measure the measurements recorded by +&&5+& in
M%>oo$ promptly, after the wor$ reaches a desired le"el or is
completed% :e has to chec$ measure the pre-measurements forreinforcement of ?** wor$s recorded by +&&5+& in M%>oo$s before
laying concrete%
2% :e will submit the M%>oo$s of the wor$s to &!ecuti"e &ngineer after
the chec$ measurements and also whene"er re6uired by the &!ecuti"e&ngineer%
,. A--i-ta!t Ee%ti*e E!"i!eerA--i-ta!t E!"i!eer.
a) Fie/' F%!tio!-.
% +fter the competent authority accorded administrati"e sanction, the
+&&5+& has to inspect the site, conduct in"estigation and prepare
designs, drawings @ detailed estimate and submit to the higher office
within the stipulated time for according technical sanction%4% :e will gi"e mar$-out, super"ise the e!ecution of wor$s in accordance
with the sanctioned estimate, agreement concluded, +#'', + W#
code and other circular instructions issued by :igher fficers and(o"ernment from time to time% :e has to ensure 6uality of raw
materials used and good wor$manship in e!ecution of wor$% :e is
primarily responsible for timely e!ecution and for maintaining the6uality in the wor$s programme%
%%
7/23/2019 2005 Act
55/72
% To ta$e wor$ing le"els at the time of e!ecution to confirm the
alignment of pipelines proposed in the sanctioned estimate and >ridge
0oundations, fi!ing of foundation le"els with respect to ground le"elsin construction of buildings, etc%
8% ;n case of breach of roads it is the duty of +&&5+& to form di"ersion
roads to a"oid hindrernce to the traffic%9% :e is responsible for remo"ing the re)ected materials from the site in
case the contractors fail to remo"e with in 2/ hours in compliance to
the written instructions of &!ecuti"e &ngineer concerned atconstructors e!penses %'%ara 2 of +#''oo$s with reference to sur"ey records
and drawings%% :andling drawing materials, custody of drawing materials and proper
maintenance of their account%
4% +ny other wor$ that may be assigned by an appropriate authority%
% +ll the duties of #%M%-; when he wor$s in di"ision%
8) Dra%"ht-ma!. Gra'e9III
a) De- F%!tio!-
1. +ll the estimates with data will be scrutinied when he wor$s in sub- di"ision%
#. +rithmetical chec$ing of calculations, details of 6uantities etc%, using
computers if a"ailable%
3. Maintenance of drawing records, original plans of schemes etc%,
4. +rithmetical chec$ing of estimates%
6. *omparing typed matter, estimates%
,. *opying of estimates, statements, analysis of rates etcl
7. reparation of simple drawings from s$etches%
8. +ny other wor$ that may be assigned by an appropriate authority%
:) Traer0
b)De- F%!tio!-0
1%%Tracing of the drawings assigned to him by the appropriate authority
and assists in preparing copies of tender schedules%
2 %+ny other wor$ that may be assigned by an appropriate authority
1;) /%e Pri!t O&erator
a) De- F%!tio!-0
1%peration and proper up$eep of the >lue rint Machine for ta$ing out
>lue prints of the drawings assigned to him by appropriate authority and assist in preparing copies of tender schedules%
2% +ny other wor$ that may be assigned by an appropriate authority%
%8%
7/23/2019 2005 Act
58/72
11) $%&eri!te!'e!t%
a) De- F%!tio!-0
1% &!ercise control o"er 'enior +ssistant, =unior +ssistant and Typist%
2% +ssist the head of the office in all financial and ser"ice matters ofemployees scrutinies their application for lea"es, ad"ances,
deputations, promotions etc%,
3% Maintenance of the 'er"ice ?egisters%/% To watch receipt of Utilisation *ertificates by maintaining registers of
budget @ releases%
% To assist the #i"isional +ccounts fficer in maintenance of accounts%
4% +ny other wor$ that may be assigned by an appropriate authority%
1#) $e!ior A--i-ta!t
7/23/2019 2005 Act
59/72
132athma!
a) $tat%tor+ %!tio!-.
1%Keeping watch and ward on the office building, files and in"entories
2%during the night time and pre"enting from any theft or loss or fire during
the night time%
13) Dri*er.
a) $tat%tor+ %!tio!-.
1 %;t is the duty of the dri"er attached to the (o"ernment "ehicles to get
the entries in the log boo$ filled in%
2 %(o"ernment "ehicles shall be dri"en only by the dri"ers attached to
them% Under no circumstances the "ehicle shall be dri"en by officers using
them, pro"ided that in the absence of a dri"er for any car and in an
emergency, the officer-in-charge may nominate a member of the staff todri"e the "ehicle% The member so nominated should posses a "alid dri"ing
license%ro"ided that where the :ead of a #epartment accords permission in
terms of rule 1 b< of abo"e (%% an officer pro"ided with a
(o"ernment "ehicle may dri"e the "ehicle either by himself or utiliethe ser"ices of an +ttender-cum-dri"er possessing "alid dri"ing license
for dri"ing the "ehicle%
3 %Motor "ehicle dri"es shall on no account dri"e the "ehicle at a speed
of more than Kms per hour or at the notified mileage, whiche"er is less%;n the city and municipal limits and built-up areas and in hea"y traffic,
they should in"ariably dri"e safely with low speeds% The "ehicle should
ne"er be o"er-loaded%/% The life of a motor "ehicle depends on the regular and systematic
attention being gi"en to it% The dri"er should see that the "ehicle allotted
to him is properly cleaned daily% :e should also e!amine daily the waterle"el in the radiator, oil le"el in the cran$ case, tyre pressures chec$ up
petrol and distilled water le"els in the battery% The dri"er concerned will
be primarily responsible for any damage that may be caused to a "ehicle
and its cost will be reco"ered from him unless he is able to gi"esatisfactory e!planation for it%
% Tyres should be got retreated before they go bald and re6uire
replacement%4 %?eport the repairs needed immediately as soon as he notices it%
%#uring the "ehicle repairs, the dri"er is responsible for all
replacements and repairs, +ll unser"iceable articles should be ta$en bac$by him after the repairs are o"er% :e should hand o"er the unser"iceable
articles in the office stores% :e should ac$nowledge the receipt of bills in
to$en of certificate that the repairs are carried out satisfactorily%
%4%
7/23/2019 2005 Act
60/72
13)Di*i-io!a/ Ao%!t- Oier (2or-)
a) $tat%tor+ %!tio!-.
1%:e should comptle accounts of the #i"ision in accordance with the
prescribed rules ara 89 a 1< J+ J code ara 33, of #-*ode
7/23/2019 2005 Act
61/72
9% :e is responsible for all corrections ad"ised by +%(% are specially
brought to the notice of &!ecuti"e &ngineer ara 9 of +-*ode
7/23/2019 2005 Act
62/72
9% To carry out geophysical sur"eys to estimate the physical properties of
sub surface layers to pin point source for de"elopment%1% To carry out geo-hydrological in"estigations for locating suitable sites
for +rtificial ?echarge structures to augment the #rin$ing Water
'ources%11% To carry out pumping test to arri"e at safe yield, depth of installation,
capacity of pumps and for sustainable drin$ing water sources%
12% To maintain the data base on ground water related parameters%
R%/e- a!' Re"%/atio!-
'%.o% 'ub)ect (%%.o% #epartment @ #ate%
1 &ntrustment of wor$s Technical sanctionpowers J authority to accept the tenders-
&!tension of +greement period-issue of
rental "aluation certificate and issue ofcondemnation certificate%
(%%Ms%.o%83, 'ocial Welfare
C< #epartment, dated% 1-/-
198
'%.o% 'ub)ect (%%.o% #epartment @ #ate%2 +dministrati"e sanction J technical sanction
delegation of powers for purchase of materials
&ntrustment of wor$s benefiting to the tribals in
the tribal and other areas by nomination to the
"illage de"elopment committees5Mahila'angams5'ocieties comprising of the local
tribals%
(%%Ms%.o%3, 'ocial Welfare C'-W#