2006 Asset Strategy App K - Building Mtce Policy

Embed Size (px)

Citation preview

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    1/58

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    2/58

    Property ServicesBuilding Maintenance Policy

    Contents

    Summary

    Preamble

    1 Building Maintenance Policy

    1.1 Introduction1.2 Objectives1.3 Intent and purpose1.4 Management Process1.5 Scope of Building Maintenance

    2 Policy, Standards and Strategy

    2.1 Maintenance Policy2.2 Maintenance Standards2.3 Maintenance Strategy

    2.3.1 Risk Management Strategy2.3.2 Financial Management Strategy2.3.3 Procurement Strategy2.3.4 Management Strategy and Responsibilities2.3.5 Management Strategy Health and Safety2.3.6 Asset Life Cycle Costing Strategy2.3.7 Technical Strategy

    3 Development of Policy, Strategy and Resources

    3.1 Maintenance Planning3.2 Maintenance Budget3.3 Five Year Resource Plan3.4 Delivery of the Five Year Resource Plan

    4 Strategic Maintenance Plan

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    3/58

    Property ServicesBuilding Maintenance Policy

    Summary

    Objectives of the policy

    To clearly set out the key objectives to ensure a consistent approach to themaintenance of the Councils assets for effective delivery of services

    To encourage the adoption of asset management planning as a means ofdemonstrating value for money in the delivery of repairs and maintenance

    To encourage development, adoption and regular reviews of policies forrepairs and maintenance

    To encourage a focus on the needs of users and the community

    To encourage harmonisation of repairs and maintenance practice andstandards with users expectations

    To encourage the adoption of an efficient and consistent approach in thecollection and recording of the property inventory, condition surveys andstatus information

    To encourage the adoption and regular review of a risk management regimeto determine operational standards and rectification of defects arising fromour own inspections and reports from the public

    To encourage continuing innovation in the repair and maintenance ofbuildings and other assets, whilst complying with the high standards ofcorporate governance

    To develop a rolling programme of Condition Surveys detailing the conditionof the Councils assets that will drive the Planned Maintenance Programmeon a yearly basis

    To develop a 5 year Resource Plan to outline how the capital and revenueresources will be allocated to minimise the backlog of the highest priority

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    4/58

    Preamble

    Building Maintenance PolicyThe policy states the objectives for the maintenance of the Councils building assets andhow this effects the delivery of the service. It reflects the Councils approach tomaintenance and how the approach complies with any legislation.The policy outlines the responsibilities for the strategic and operational management ofmaintenance within the organisation.

    Building Maintenance StrategyThe building maintenance strategy adopts the best approach to undertake maintenanceactivities.

    Scope of Building MaintenanceThe scope of building maintenance establishes a uniform set of guidelines to ensureconsistency of reporting and monitoring

    Strategic Maintenance PlanStrategic maintenance planning determines the future maintenance needs and strategiesfor a building portfolio by reviewing the condition of the assets and the potential future ofthe assets within any business strategies. The plan should be supported by a soundfinancial strategy, to ensure the assets are maintained in the longer term. The plan shouldform the basis on which annual budgets, plans and programmes are developed.

    Asset ManagementThe theme of asset management is strengthened by Government guidance encouragingauthorities to draw up Asset Management Plans (AMP)

    Condition SurveysCondition Surveys have been completed for all the buildings in the Councils portfolio.The surveys are a combination of condition surveys carried out by

    In house staffBuilding Services ManagerBuilding ManagerProperty Asset Inspector

    King Sturge Property Consultants

    DCL Building Services Consultants

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    5/58

    1 Building Maintenance Policy

    1.1 IntroductionSouth Hams District Council has a portfolio of approximately 365 buildings providing over44,000m2 of accommodation from which it delivers services to the community and securesincome to the Authority. The buildings are physical assets which need to be properlymaintained to ensure that they continue to function as efficiently and effectively as possiblein supporting the delivery of a wide range of services.Deterioration of the buildings due to lack of maintenance can lead to future financialbacklogs that can affect service delivery and creation of health and safety issues.The maintenance of the building assets is critical to the management of physical assetsand to provide a good environment for staff and other users of the Councils buildings.

    A policy for the management of maintenance is required to provide a consistent approachto the planning, management and reporting of building maintenance issues.

    1.2 ObjectivesThe key objectives of the Building Maintenance Policy are

    To specify the minimum requirements for the management of maintenance

    To ensure that the buildings are adequately maintained

    To ensure the that the risks to the Council are effectively managed

    To ensure that Health and Safety objectives are met

    To ensure the delivery of effective maintenance at department level

    To ensure that the Council has the necessary information for monitoringmaintenance, condition and performance of building assets

    To ensure there is adequate information at operational level for undertakingmaintenance, including the ability to review policies and strategies, analysing lifecycles, plan for replacement and upgrades and improve the efficiency andeffectiveness of the service

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    6/58

    1.4 Maintenance Management Process

    There are five key elements of the maintenance management process

    Policy and Strategy

    Strategic Planning

    Implementation

    Performance

    Reporting

    1.5 Scope of Building MaintenanceThis policy applies to the maintenance of all Council owned building assets. A building

    asset is any roofed structure and its surrounding site. It includes;

    Offices

    Leisure Centres

    Depots

    Public Toilets

    Industrial Units

    Parks buildings

    Tea Kiosks / Cafes

    Shelters

    Tourist Information Centres

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    7/58

    Investment properties

    Building maintenance activities are defined as: -

    All work on existing building assets, including utility services and externalinfrastructure within the curtilage of the site that is undertaken to achievethe following objectives:

    To retain the asset in a condition in which it can perform its

    required function. To prevent deterioration and failure or extend the life of the asset.

    To restore to correct operation within specified parameters

    To restore physical condition to a specified standard

    To recover from structural and service failure

    To obtain accurate and objective knowledge of physical and

    operating condition including risk and financial impact for the

    purpose of maintenance; and Partial equivalent replacement of components of the asset

    Work excluded from maintenance includes:

    improvements and upgrading to meet new service capacity or function;

    refurbishment to new condition to extend the capacity of the asset;

    capital replacement of major components to extend the capacity or useful lifeof the asset

    upgrading to meet new Statutory requirements;

    operational tasks to enable occupancy and use (e.g. cleaning, security,waste removal);

    supply of utilities (energy, water and telecommunications);

    construction of new assets; and

    major restoration as a result of natural and other disasters.

    For leased / rented buildings, responsibility for maintenance is subject to the terms andconditions of each lease agreement. Advice on maintenance liability in respect of anyleased building is obtained from the Councils Estates Team.

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    8/58

    2 Policy, Standards and Strategy

    The following details the compliance requirements for the effective and efficientmanagement and delivery of building maintenance for the Council

    2.1 Maintenance PolicyThe maintenance of the Councils building assets should be directed towards;

    Meeting individual service delivery needs which are reflected in the standards towhich assets are to be maintained

    Priorities based on the impact of condition on service delivery and risk

    Minimising the whole life costing of the assets

    Optimising capital receipts on disposal of building assets where additional incomeexceeds expenditure

    Ensuring the most effective use of maintenance resources to aim to meet the AuditCommissions benchmark of 70% planned and 30% reactive

    The key outcomes to be achieved from undertaking maintenance are;

    Functional and operational requirements of the working environment are met

    The physical condition and efficient operation of assets is kept to a standard,appropriate to their service function and value to the community

    All statutory and technical requirements are met, to ensure that health, sagety andsecurity responsibilities are met

    2.2 Maintenance Standards

    Maintenance property ratings shall be established to ensure that the building assets aremaintained at an appropriate condition and in efficient operation.

    Each property will be given a Property Rating between 1 and 5 to identify properties that

    are critical for the delivery of services.

    The condition of each the properties is shown in 4 ratings A to D, A being the highest.

    For example, a property graded at 1D, would not be acceptable and significant workswould be required to bring the property up to 1A or 1B.

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    9/58

    Property Rating

    1 Core service, critical or high profile asset to be in the best possibleCondition

    2 Core service, asset to be in good condition

    3 Core service, asset to be in reasonable condition

    4 Non core service, asset to meet minimum operational and statutory

    5 Non core service, non operational property, surplus asset

    Condition Rating

    A Good performing as intended and operating efficiently

    B Satisfactory performing as intended but showing signs of minor deterioration

    C Poor showing major defects and / or not operating as intended

    D Bad life expired and / or serious risk of imminent failure

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    10/58

    2.3 Maintenance Strategy

    The purpose of the strategy is to reflect the Councils approach to maintenance andsupport the strategic maintenance plan and policy established by the Council.

    2.3.1 Risk Management Strategy

    Risk associated with maintenance will be managed in the following order of priority;

    1 Maintenance in respect of health and safety issues

    2 Statutory maintenance requirements

    Security

    Fire

    Gas

    Electrical

    Access systems

    3 Structural maintenance

    4 Building fabric maintenance for all Council owned building assets

    5 Maintenance of unoccupied assets or assets awaiting disposal

    2.3.2 Financial Management Strategy

    A detailed Asset Strategy for the Councils building assets will form the basis of;

    Determining the maintenance budget for planned and responsive maintenanceactivities to achieve the established standards and address the risks above

    Identifying works that are to be considered for capitalisation

    2.3.3 Procurement

    Maintenance services are to be procured in accordance with the Councils Financial

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    11/58

    2.3.6 Asset Life Cycle Costing Strategy

    This is the total costs of ownership, including acquisition, operation and maintenance. Tominimise these costs and achieve best value;

    Clear definition of the Councils requirements leading to a better understanding ofproject priorities

    Reducing over specification

    Effective planning of the design and construction process leading to improved

    construction quality2.3.7 Technical Strategy

    Maintenance activities are to be undertaken as follows

    Maintenance Activities

    Planned Undertaken as a result of the assets condition, used to prevent major

    failure and reduce reactive maintenance over time

    Term Used to comply with any manufacturers requirements for buildingservices

    Reactive Day to day maintenance

    Backlog Maintenance which has been deferred, normally due to a lack of fundingand other priorities

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    12/58

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    13/58

    4 Strategic Maintenance Plan

    The purpose of the plan is to look at the maintenance needs of each services portfolio ofbuilding assets over the immediate, medium and long term.

    The Strategic Maintenance Plan is to incorporate asset management principles and utiliselife cycle planning and asset performance. It will have due regards for service delivery andthe asset strategy, age, condition and value and any other emerging issues which mayimpact on their service potential.

    5 Maintenance Performance

    5.1 Key Performance Indicators

    The KPIs will be reported on the COPROP format.

    5.2 Local Performance Indicators

    Local PIs are collected to compliment the COPROP PIs

    5.3 Customer Satisfaction

    Scored satisfaction forms are sent to customers with a stamped, self addressed envelopefor return.The scores are calculated as a %, with 100% being the highest score.

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    14/58

    6 Major Compliance Requirements

    The following documents should be read in conjunction with this policy

    EU DirectivesBritish StandardsHealth and Safety RegulationsWork Equipment RegulationsLift and hoist regulations

    Pressure vessel regulationsPool water and safety regulationsLegionellaCorgi gas regulationsNICEIC electrical regulationsWater regulationsBuilding RegulationsPlanning and Conservation

    Fire RegulationsFenestration Self Assessment SchemeDisability Discrimination ActAsbestos RegulationsConstruction Design Management regulationsHazardous Waste RegulationsDepartment of Environment, Food and Rural AffairsEnvironment AgencyHighway RegulationsControl of Substances Hazardous to HealthEnvironmental HealthWorking at height regulationsInstitute of Sport and Recreation Management swimmingpools

    Machine Workshop Regulations

    Documents and policies used

    Asset Strategy

    Repairs and Maintenance Policy

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    15/58

    7 Responsibilities

    Below are the key areas of responsibility for the building assets.

    Property Services are responsible for

    The management of this policy

    Review of maintenance standards

    Management of maintenance budgets

    Building Services Team is responsible for

    Delivery and implementation of maintenance services

    Inspection of Public Areas and Buildings

    Develop programmes within budgets available

    Completion of the COPROP indicators

    Updating condition surveys

    Development of planned maintenance programmes

    Maintaining accurate records of energy resources

    Procurement of works using external contractors and consultants

    Certification of invoices

    Liaison with building users to ensure works are satisfactorily completed

    Disaster and emergency responses

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    16/58

    8 Appendices

    8.1 Maintenance Expenditure 5 year plan

    8.2 Capital Programme

    8.3 Condition Survey Sample

    8.4 Condition Survey Collection Sheet

    8.5 Priorities for Reactive Maintenance

    8.6 COPROP Performance Indicators

    8.7 Local Performance Indicators

    8.8 Energy Consumption Data

    8.9 Energy Consumption per Service

    8.10 CO2 Emissions

    8.11 Customer Survey Form

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    17/58

    Appendix 8.1

    8.1 Maintenance Expenditure 5 year plan

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    18/58

    Property Services

    Maintenance Expenditure - 5 Year Resource Plan - April 2006

    5 year Estimated expenditure Remaining

    liability Year 1 Year 2 Year 3 Year 4 Year 5 Total liability

    Revenue000's 2006/7 2006/7 2007/8 2008/9 2009/10 2011/12 expenditure 2012/13

    Budget 872 900 927 954 982 4635 0

    Responsive Maintenance 3749 776 760 747 734 732 3749 0

    Planned Maintenance 1609 96 140 180 220 250 886 -723

    Estimated % of planned work 11 16 19 23 25

    5 year Estimated expenditure Remaining

    liability Year 1 Year 2 Year 3 Year 4 Year 5 Total liability

    Capital000's 2006/7 2006/7 2007/8 2008/9 2009/10 2011/12 expenditure 2012/13

    Budget 3410 670 670 670 700 700 3410 0

    Capital works 3659 782 1304 695 221 657 3659 -249

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    19/58

    Appendix 8.2

    8.2 Capital Programme

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    20/58

    Capital Programme Oct-06

    Start Year

    Service Location Project Design Date 2006/7 2007/8 2008/9 Notes

    HQ

    Follaton Council Chamber A/C unit External Aug-06 15 Complete

    Old building, redecoration, window In house TBA

    repairs, roof repairs 75

    Track to garden workshops on hold

    Lightning protection External TBA 20

    Safety lines on roof External TBA 20

    Back up power supply External TBA 40

    External redecoration of complex In house TBA 250

    Reroofing old house In house TBA 250Car Park repairs TBA Possibly revenue

    Carpet replacement In house TBA 38

    Leisure

    Quayside Replace boiler External TBA 50

    Improvements to alarms External TBA 20 Check

    Replace sports hall floor External TBA 50

    Repair squash court walls External TBA 15

    SDLC Replace sand filter sand, pipe repairs External TBA 50

    pool tile repairs ExternalNew alarm and PA system External TBA 100

    Replace squash court floors External TBA 20

    Flat roofing replacement TBA TBA 60

    Retile ODP and ring beam repairs TBA on hold 160k

    Replace obsolete distribution boards External TBA 15

    Replace boilers and controls External TBA 100

    Replace sports hall floor External TBA 50

    Totnes New alarm and PA system External Jun-06 85 in progress

    Replace boilers External TBA 70

    Replace air handling units External TBA 40

    Public Buildings

    Dartmouth Cor Pk Pavilion Install new external power supply In house on hold 10k

    and demolish building

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    21/58

    In house Start Year

    Service Location Project design Date 2006/7 2007/8 2008/9 Notes

    Toilets

    Hallsands New building In house on hold 20k

    Beesands Tiling n/a TBA 10

    Totnes Civic Hall Major refurbishment In house TBA 80 WK14

    Kingswear The Square Refurbishment In house TBA 40

    Kingsbridge Fore Street Refurbishment In house on hold 20k

    Kingbridge Quay Refurbishment In house on hold 60k Possible development

    E Portlemouth Ferry Steps Sewer connection External TBA 60

    Dartmouth Market Square Refurbishment In house on hold 30k Possible development

    Dartmouth Coronation Park Refurbishment In house on hold 30k Possible development

    East Prawle Refurbishment n/a TBA 15Manor Gardens Sewer connection In house TBA 10

    Estates

    Kingsbridge Garden Mill Replace roofing Ext / in house on hold 60

    Wall cladding and doors Ext / in house on hold 53

    Totnes Wills Road Replace roofing Ext / in house TBA 40

    Civic Hall store Refurbishment / housing In house TBA 30

    Leisure and Parks

    Borough Park Replace temporary storeage In house TBA 20

    Creacombe Cottage Structural repairs Ext TBA 10Steamer Quay caf Replace flooring In house TBA 15

    Bowls Club Kingsbridge Roof and wall repairs etc TBA TBA 60

    Totals 245 1201 490

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    22/58

    In house Start Year

    Service Location Project design Date 2006/7 2007/8 2008/9 Notes

    Infrastructure

    Car Parks Totnes Civic Hall Redesign and resurface In house TBA ???

    Totnes Longmarsh Redesign and resurface In house TBA 50

    Salcombe Shadycombe Retaining wall repairs External TBA 20

    Churchyards South Milton Repairs to church boundary walls External Aug-06 30 in progress

    Public Areas Kingsbrige slipway Surfacing repairs In house TBA 20

    Kingsbridge Town Square Replace defective lighting External Sep-06 10 in progress

    Kingsbridge Recreation Grd Repairs to 2 retaining walls External TBA 40

    Salcombe Footbridge New footpath bridge External Mar-07 25Dartmouth Royal Avenue Gdns New lighting Ext / in house TBA 60

    Totnes Leechwell Structural works Ext / in house TBA 30 Check decked car park

    Passenger Ferry Pontoon Bridge Kingswear Replace decking, electrical upgrade and External PS & spec 40

    redec

    Totals 105 190 30

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    23/58

    In house Start Year

    Service Location Project design Date 2006/7 2007/8 2008/9 Notes

    Refuse Torr Quarry Raise push wall In house on hold 40k

    Reserves

    Ferry Workshops Replace cladding In house TBA 100

    Welfare area refurbishments In house TBA 50

    Replacement lighting External TBA 10

    Slipway rails, winch's etc External TBA 25

    Salcombe Harbour Workshops Rewiring and internal alterations Ext / in house TBA 20 40

    HousingAvondale Refurbishment In house TBA

    Completed works Final cost

    Dartmouth Bandstand roo fing 26

    Dartmouth Replacement street ligh ting 21

    Totnes Booking k iosk roof 13

    Follaton Counc il chamber a/c un it tba

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    24/58

    Appendix 8.3

    8.3 Condition Survey Sample

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    25/58

    Property Data Sheet Building number

    Site Club / Changing Room - Recreation Ground Kingsbridge Survey Date 01 04 06 Floor area

    Repair Responsibility Int Ext Both None Consultants Survey Date tba m2 9339

    Revenue Capital

    % category Years Years

    Element A B C D Sub element Work required 1 2 3 4 5 6 to 10 1 2 3 4 5 6 to 10 DDA

    Roof 100 Covering Replace 30

    Structure Defective Timbers 10

    R W goods

    Other

    Walls ext Finishes

    50 50 Structure

    Other Damp 5

    Windows 100 Frames 5

    Doors 100 Door

    FramesFloors 100 Finishes

    Structure

    Ceilings 50 50 Finishes Asbestos 10

    Walls - int 100 Finishes

    Fixtures 100 Kitchen

    Sanitary ware

    Cubicles

    Other

    Redecoration 100 External 4 4

    Internal

    M & E 100 Heating

    Ventilating

    Air con

    C W System

    H W System

    Elec wiring 5

    Elec fittings

    Lighting

    Gas

    Security

    Fire alarms

    P A system

    Lifts

    Other

    External 100 Drains

    Paths

    Walls / fences

    Car Parks

    Refurbishment 0 0 0 0 Major

    Minor

    DDA Upgrade

    Total Score 0 900 200 0 Total Expenditure - Year 0 0 0 4 0 9 0 0 60 0 0 0 0

    % Score 0 81.82 18.18 0 5 year expenditure

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    26/58

    Appendix 8.4

    8.4 Condition Survey Collection Sheet

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    27/58

    Asset Management All Buildings Live

    Revenue and Capital Expenditure 5 Year Plan

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    28/58

    DDA

    A% B% C% D% yr1 yr2 yr3 yr4 yr5 yr1 yr2 yr3 yr4 yr5 yr1

    Buildings - OperationalProp

    RatingRef

    Condition Category

    Floor

    Area

    GIA

    Overall

    AMP

    Category

    Required Maintenance

    Revenue

    yr6 to 10

    Capital

    yr6 to 10

    Salcombe Cliff House Gardens 9031 A 9 82 14 5 0 0.0 0.0 0.4 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Salcombe Cliff House Gardens (Closed) 9032 C 9 0 23 77 0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Salcombe Creek Gould Road 9033 A 34 100 0 0 0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Salcombe North Sands Cliff Road 9034 A 30 91 0 9 0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.0 0.0 0

    Salcombe South Sands 9036 B 25 27 73 0 0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0Salcombe Whitestrand Quay 9037 A 36 100 0 0 0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Shipley Bridge 9041 A 27 100 0 0 0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Slapton Memorial Car Park 9039 A 31 82 18 0 0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    South Brent Stockbridge Lane 9042 B 27 0 100 0 0 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    South Milton N. Trust Beach 9044 B 14 9 84 7 0 0.0 0.6 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Staverton 9045 B 16 20 70 10 0 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 0.0 0.0 0

    Stoke Fleming School Lane 9046 B 21 18 82 0 0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Stoke Gabriel Gabriel Court 9047 B 10 18 75 7 0 0.0 0.0 0.0 0.3 0.0 1.0 0.0 0.0 0.0 0.0 0.0 5.0 0

    Strete Gate 9051 B 13 18 78 4 0 0.0 0.0 0.0 0.7 1.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Thurlestone Near Golf Club 9052 D 16 0 0 27 73 0.6 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Torcross Tank Car Park 9357 A 39 100 0 0 0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Totnes Borough Park (Closed) 9053 C 14 0 0 100 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0Totnes Civic Hall 9054 C 31 0 25 53 22 1.0 0.0 0.0 0.0 0.0 0.0 0.0 80.0 0.0 0.0 0.0 0.0 0

    Totnes Coronation Road 9055 A 35 86 14 0 0 0.0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Totnes Leechwell Street 9056 C 16 0 25 53 23 0.5 0.0 0.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 0

    Totnes Steamer Quay (Sold) 9057 C 0 0 0 100 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Totnes Steamer Quay (New) 9322 A 50 100 0 0 0 0.0 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Ugborough The Square 9059 A 19 64 36 0 0 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Wembury Beach 9061 A 32 91 9 0 0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Tea Koisks / Cafs *

    Coronation Park Dartmouth (Including putting store) 9091 A 15 100 0 0 0 0.0 0.0 2.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Mayors Avenue Car Park Dartmouth 9106 B 9 0 100 0 0 1.0 0.0 1.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 5.0 0

    Royal Avenue Gardens Dartmouth 9089 A 16 100 0 0 0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0Caf Castle Dartmouth ( Sold) 9080 A 0 0.0 0.0 0.0 0.0 0

    Tea Room Recreation Ground Kingsbridge/ Club 9109 B 100 0 100 0 0 0.0 0.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Colin Horswill

    Property Services 2 30/10/2006

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    29/58

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    30/58

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    31/58

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    32/58

    Asset Management All Buildings Live

    Revenue and Capital Expenditure 5 Year Plan

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    33/58

    DDA

    A% B% C% D% yr1 yr2 yr3 yr4 yr5 yr1 yr2 yr3 yr4 yr5 yr1

    Buildings - OperationalProp

    RatingRef

    Condition Category

    Floor

    Area

    GIA

    Overall

    AMP

    Category

    Required Maintenance

    Revenue

    yr6 to 10

    Capital

    yr6 to 10

    Unit 14, Ermington Workshops, Ermington 9176 B 92 0 64 27 9 4.2 0.0 0.0 0.0 0.0 0.0 26.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 15, Ermington Workshops, Ermington 9177 B 92 0 64 27 9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Toilets, behind 9 and 9A Ermington Workshops 9178 B 4 39 52 9 0 1.7 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0

    Basement, Ermington Mill, Ermington Including DDA 9179 B 82

    Unit 1, Ground Floor, Ermington Mill 9180 C 30 9 34 48 9 0.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0 205.0 0.0 0.0 265.0 0

    Unit 2, Ground Floor, Ermington Mill 9181 C 19

    Unit 3, Ground Floor, Ermington Mill 9182 C 18

    Unit 4, Ground Floor, Ermington Mill 9183 C 21Unit 1, Lower Ground Floor, Ermington Mill 9184 C 27

    Unit 2, Lower Ground Floor, Ermington Mill 9185 C 22

    Unit 3, Lower Ground Floor, Ermington Mill 9186 C 23

    Unit 4, Lower Ground Floor, Ermington Mill 9187 C 23

    Unit 1A, The Annexe, Ermington Mill 9188 C 65

    Unit 2A, The Annexe, Ground Floor, Ermington Mill 9189 C 39

    Unit 2B, The Annexe, Ground Floor, Ermington Mill 9190 C 13

    Upper Ground Floor, Ermington Mill 9191 C 172

    Unit 1, East Way, Lee Mill 9192 D 215 0 36 18 45 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 2, East Way, Lee Mill 9193 D 152 0 36 18 45 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 3, East Way, Lee Mill 9194 D 204 0 36 18 45 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0Unit 5, Room 1, Acorn Centre, Lee Mill 9195 B 83 18 82 0 0 6.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 0

    Unit 5, Room 2, Acorn Centre, Lee Mill 9196 B 46

    Unit 5, Room 3, Acorn Centre, Lee Mill 9197 B 36

    Unit 5, Room 4, Acorn Centre, Lee Mill 9198 B 48

    Unit 5, Room 5, Acorn Centre, Lee Mill 9199 B 56

    Unit 5,Acorn Centre, Lee Mill Kitchen - Shared use 9200 B 20

    Unit 1, Oak Court, Lee Mill 9201 A 75 100 0 0 0 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 2, Oak Court, Lee Mill, 9202 A 75

    Unit 3, Oak Court, Lee Mill 9203 A 75

    Unit 4, Oak Court, Lee Mill 9204 A 75

    Tesco Store & Service Rd, Lee Mill 9205 * 6516

    Unit 1, Ash Court, Lee Mill 9206 A 144 91 9 0 0 5.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0Unit 2, Ash Court, Lee Mill 9207 A 73

    Unit 3, Ash Court, Lee Mill 9208 A 73

    Unit 4, Ash Court, Lee Mill, 9209 A 145

    Unit 5, Ash Court, Lee Mill 9210 A 73

    Colin Horswill

    Property Services 7 30/10/2006

    Asset Management All Buildings Live

    Revenue and Capital Expenditure 5 Year Plan

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    34/58

    DDA

    A% B% C% D% yr1 yr2 yr3 yr4 yr5 yr1 yr2 yr3 yr4 yr5 yr1

    Buildings - OperationalProp

    RatingRef

    Condition Category

    Floor

    Area

    GIA

    Overall

    AMP

    Category

    Required Maintenance

    Revenue

    yr6 to 10

    Capital

    yr6 to 10

    Unit 6, Ash Court, Lee Mill, 9211 A 73

    Unit 7, Ash Court, Lee Mill, 9212 A 73

    Unit 8, Ash Court, Lee Mill 9213 A 73

    Unit 9, Ash Court, Lee Mill 9214 A 73

    Unit 10, Ash Court, Lee Mill 9215 A 105

    Unit 11, Ash Court, Lee Mill 9216 A 105

    Unit 12, Ash Court, Lee Mill 9217 A 70

    Unit 13, Ash Court, Lee Mill 9218 A 70Unit 14, Ash Court, Lee Mill 9219 A 70

    Unit 15, Ash Court, Lee Mill 9220 A 70

    Old Fire Station, Western Rd, Ivybridge 9221 B 97 0 100 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 1, Bridge Court, Ivybridge 9222 A 70 100 0 0 0 0.0 0.0 0.0 0.0 0.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 2, Bridge Court, Ivybridge 9223 A 64

    Unit 3, Bridge Court, Ivybridge 9224 A 70

    Unit 4, Bridge Court, Ivybridge 9225 A 70

    Unit 1, Garden Mill, Kingsbridge 9226 B 37 10 80 10 0 6.5 0.0 0.0 0.0 0.0 6.5 113.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 2, Garden Mill, Kingsbridge 9227 B 37

    Unit 3, Garden Mill, Kingsbridge 9228 B 37

    Unit 4, Garden Mill, Kingsbridge 9229 B 37Unit 5, Garden Mill, Kingsbridge 9230 B 37

    Unit 6, Garden Mill, Kingsbridge 9231 B 28

    Unit 7, Garden Mill, Kingsbridge 9232 B 28

    Unit 8, Garden Mill, Kingsbridge 9233 B 28

    Unit 9, Garden Mill, Kingsbridge 9234 B 28

    Unit 10, Garden Mill, Kingsbridge 9235 B 24

    Unit 11, Garden Mill, Kingsbridge 9236 B 28

    Unit 12, Garden Mill, Kingsbridge 9237 B 28

    Unit 13, Garden Mill, Kingsbridge 9238 B 28

    Unit 14, Garden Mill, Kingsbridge 9239 B 28

    Unit 15, Garden Mill, Kingsbridge 9240 B 28

    Unit 1, The Malthouse, Kingsbridge Including DDA 9241 C 22 0 9 82 9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0Unit 2, The Malthouse, Kingsbridge 9242 C 24

    Unit 3, The Malthouse, Kingsbridge 9243 C 21

    Unit 4, The Malthouse, Kingsbridge 9244 C 31

    Unit 5, The Malthouse, Kingsbridge 9245 C 20

    Colin Horswill

    Property Services 8 30/10/2006

    Asset Management All Buildings Live

    Revenue and Capital Expenditure 5 Year Plan

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    35/58

    DDA

    A% B% C% D% yr1 yr2 yr3 yr4 yr5 yr1 yr2 yr3 yr4 yr5 yr1Buildings - Operational PropRating

    Ref

    Condition Category

    Floor

    Area

    GIA

    Overall

    AMP

    Category

    Required Maintenance

    Revenue

    yr6 to 10

    Capital

    yr6 to 10

    Unit 6, The Malthouse, Kingsbridge 9246 C 27

    Unit 7, The Malthouse, Kingsbridge 9247 C 9

    Unit 8, The Malthouse, Kingsbridge 9248 C 11

    Unit 9, The Malthouse, Kingsbridge 9249 C 25

    Unit10, The Malthouse, Kingsbridge 9250 C 32

    Unit 11, The Malthouse, Kingsbridge 9251 C 31

    Unit 1, New Mills, Modbury 9252 A A 100 0 0 0 0.0 0.0 0.0 10.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 2, New Mills, Modbury 9253 A A

    Unit 3, New Mills, Modbury 9254 A 66

    Unit 4, New Mills, Modbury 9255 A 66Unit 5, New Mills, Modbury 9256 A 66

    Unit 6, New Mills, Modbury 9257 A 66

    Unit 7, New Mills, Modbury 9258 A 66

    Unit 8, New Mills, Modbury 9259 A 66

    Unit 9, New Mills, Modbury 9260 A 66

    Unit 10, New Mills, Modbury 9261 A 390

    Unit 1, Island Street, Salcombe 9262 B 143 9 73 18 0 0.0 4.0 0.0 0.0 18.0 1.0 0.0 102.0 0.0 0.0 18.0 0.0 0

    Unit 2, Island Street, Salcombe 9263 B 133

    Unit 3a, Island Street, Salcombe 9264 B 36

    Unit 3b, Island Street, Salcombe 9265 B 116

    Unit 4, Island Street, Salcombe 9266 B 120Unit 5a, Island Street, Salcombe 9267 B 35

    Unit 5b, Island Street, Salcombe 9268 B 120

    Unit 6, Island Street, Salcombe 9269 B 116

    Unit 2a, Dart Units, Totnes 9270 C 130 0 27 64 9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 2b, Dart Units, Totnes 9271 C 121

    Unit 1, Wills Road, Totnes 9272 B 129 0 82 9 9 3.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 0.0 0.0 0.0 0

    Unit 2, Wills Road Totnes 9273 B 112

    Unit 3, Wills Road Totnes 9274 B 112

    Unit 4, Burke Rd, Totnes 9275 B 119 0 45 45 9 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 5, Burke Road, Totnes 9276 B 112

    Unit 6, Burke Road, Totnes 9277 B 112

    Unit 11, Burke Rd, Totnes 9278 B 30Unit 12, Burke Rd, Totnes 9279 B 29

    Unit 13, Burke Rd, Totnes 9280 B 30

    Unit 14, Burke Rd, Totnes 9281 B 31

    Unit 15, Burke Rd, Totnes 9282 B 13

    Unit 16, Burke Rd, Totnes 9283 B 13

    Unit 17, Burke Rd, Totnes 9284 B 13

    Colin Horswill

    Property Services 9 30/10/2006

    Asset Management All Buildings Live

    Revenue and Capital Expenditure 5 Year Plan

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    36/58

    DDA

    A% B% C% D% yr1 yr2 yr3 yr4 yr5 yr1 yr2 yr3 yr4 yr5 yr1

    Buildings - OperationalProp

    RatingRef

    Condition Category

    Floor

    Area

    GIA

    Overall

    AMP

    Category

    Required Maintenance

    Revenue

    yr6 to 10

    Capital

    yr6 to 10

    Unit 18, Burke Rd, Totnes 9285 B 13

    Unit 19, Burke Rd, Totnes 9286 B 13

    Unit 20, Burke Rd, Totnes 9287 B 13

    Woodford Garage, Babbage Rd, Totnes 9288 B 217 0 100 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    13 Leechwell St, Totnes, Ground & Part 1st Floor 9289 B 167 0 64 36 0 0.0 0.0 0.0 0.0 8.0 17.0 0.0 0.0 0.0 0.0 0.0 35.0 0

    13 Leechwell St, Totnes, 1 room 1st Floor 9290 B 8

    Lower Weston Community Hall, Totnes 9291 A 78 76 24 0 0 0.1 0.1 0.1 0.1 1.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit A1, Dart Marine Park, Steamer Quay, Totnes 9292 A 51 95 5 0 0 7.8 0.0 4.5 0.0 12.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit A2, Dart Marine Park, Steamer Quay, Totnes 9293 A 51

    Unit A3, Dart Marine Park, Steamer Quay, Totnes 9294 A 51

    Unit A4, Dart Marine Park, Steamer Quay, Totnes 9295 A 51

    Unit A5, Dart Marine Park, Steamer Quay, Totnes 9296 A 54

    Unit A6, Dart Marine Park, Steamer Quay, Totnes 9297 A 56

    Unit A6a, Dart Marine Park, Steamer Quay, Totnes 9298 A 56

    Unit A7, Dart Marine Park, Steamer Quay, Totnes 9299 A 56

    Unit A7a, Dart Marine Park, Steamer Quay, Totnes 9300 A 56

    Unit A8, Dart Marine Park, Steamer Quay, Totnes 9301 A 81

    Unit A8a, Dart Marine Park, Steamer Quay, Totnes 9302 A 81

    Unit A9, Dart Marine Park, Steamer Quay, Totnes 9303 A 54Unit A9a, Dart Marine Park, Steamer Quay, Totnes 9304 A 58

    Unit A10, Dart Marine Park, Steamer Quay, Totnes 9305 A 54

    Unit A10a, Dart Marine Park, Steamer Quay, Totnes 9306 A 54

    Building B, Dart Marine Park, Steamer Quay, Totnes 9307 A 413

    Chandlery Bdg B, Dart Marine Pk, Steamer Quay, Totnes9308 A 63

    Building C, Dart Marine Park, Steamer Quay, Totnes 9309 A 312

    Building D, Dart Marine Park, Steamer Quay, Totnes 9310 A 312

    Unit 1 Babbage Court Totnes 9365 A 64 100 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Unit 2 Babbage Court Totnes 9366 A 64

    Unit 3 Babbage Court Totnes 9367 A 64Fishermans Store, 1 Salcombe, 9311 B 12 0 82 18 0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Fishermans Store, 2 Salcombe, 9312 B 12

    Fishermans Store, 3 Salcombe, 9313 B 12

    Toilet Block Fishermans Store Salcombe 9363 B 0 82 18 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

    Colin Horswill

    Property Services 10 30/10/2006

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    37/58

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    38/58

    Appendix 8.5

    8.5 Priorities for Reactive Maintenance

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    39/58

    Property Services

    Priorities for Reactive Maintenance

    Priority TargetCompletiontimes

    Description

    1 Immediate /24hrs

    Immediate, threat to Health and Safety, risk ofinjury, major interruption of service delivery

    2 3 days Urgent, minor interruption of service delivery

    3 7 days Routine repairs, dependant upon materials andresources

    4 14 days Routine repairs, dependant upon materials andresources

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    40/58

    Appendix 8.6

    8.6 COPROP Performance Indicators

    SUGGESTED OPERATIONAL PROPERTY CATEGORIE

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    41/58

    SUGGESTED OPERATIONAL PROPERTY CATEGORIEFOR COPROP PERFORMANCE INDICATORS

    property categories. The aim is to provide Authorities with a comparable list of categories for

    compiling the indicator data. If you find you have a group of properties not listed here, butwhich fit the definition of operational properties, then obviously add that category into your

    list, conversely you may not have property in all of these categories, so simply do not use

    them. Where you have dual-use properties, collate the data against the dominant service if

    it cannot easily be split. Where buildings have been outsourced, but are still providing a

    public service, in the interests of Best Practice the managing body should be required to

    collect PI information, (outsourced buildings is a good example of a property category you

    Inc lus ions:

    Main CIPFA Categor Schools sub-categories:

    None (you can sub-categorise this further to suit your own needs)

    Main CIPFA Category Other (Land and) Buildings sub-categories:

    Cemeteries and Crematoria (buildings only)Community BuildingDepotsEducation Non-Schools(eg, youth centres, residential education centres)Fire Stations (applicable to 'fire authorities')Information CentresLibrariesMulti-Storey Car Parks

    Museums and GalleriesOffices, Administrative BuildingsPark BuildingsPublic ConveniencesResidential Homes and Day Centres (you can sub-categorise this further to suit your own needs)Sports Centres and Pools, including sports pavilions and changing facilitieSurplus Property (non-operational)

    Main CIPFA Category Community Assets sub-categories:Hard landscaping, including paths, boundary fences, play areas, etc, associated with parks, cit is not anticipated that land itself will be captured as part of the performance indicators due

    to several issues, eg, that of comparing hectares with GIA and land not generally having

    energy consumption, or a condition grade, and so on. This obviously does not prevent

    CONDITION PROPERTY PERFORMANCE INDICATOR MATRIX

    Schools: Other Operational Buildings : Community Assets:

    Schools Cemetar ies and

    C t i

    Community

    B ildi

    D ep ot s E du ca ti on No n-

    S h l

    Fire Stations

    ( h 'fi

    Information

    C t

    Libraries Multi -Storey

    C P k

    Museums and

    G ll i

    Offices,

    Ad i i t ti

    P ar k B ui ld in gs P ub li c

    C i

    Residential

    H d D

    Sports Centres

    d P l

    SUB-TOTAL Surplus

    P t

    Hard landscaping inc

    th b d

    SUB-TOTAL TOTAL

    Main CIPFA

    Category:

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    42/58

    Crematoria

    (buildings only)

    Buildings Schools, eg,

    youth centres,

    residential

    education

    centres

    (where 'fire

    authority')

    Centres Car Parks Galleries Administrative

    Buildings

    Conveniences Homes and Day

    Centres

    and Pools Property

    (non-

    operational)

    paths, boundary

    fences, play areas, etc,

    associated with parks,

    cems & crems, etc

    Percentage in A

    Condition Categories B

    A, B, C, D C

    D

    1

    2

    3

    1

    2

    3

    1B iii)

    1C

    1D i)

    1D ii)

    1D iii) P P P P P P P P P P P P P P P P P P P P

    R R R R R R R R R R R R R R R R R R R R

    1B i) Total Cost in Priority Levels

    1A

    Annual % change

    Overall Cost per m2

    1B ii) Priority Levels Percentages

    %split Planned / Responsive

    Spend perm2

    Total Spend

    ENVIRONMENTAL PROPERTY PERFORMANCE INDICATOR - MATRIX * use a formula to calculate per m2figures

    TOTAL GIA m2: 0

    Main CIPFA

    C t i

    Schools: Other Operational Buildings: Community Assets:

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    43/58

    Categories:

    ENERGY SPEND

    & CONSUMPTION

    BY PROPERTY

    CATEGORY

    Schools Cemetaries

    and

    Crematoria

    (buildings

    only)

    Community

    Buildings

    Depots Education Non-

    Schools, eg,

    youth centres,

    residential

    education

    Fire Stations

    (where 'fire

    authority')

    Information

    Centres

    Libraries Mul ti -Storey

    Car Parks

    Museums and

    Galleries

    Offices,

    Administrative

    Buildings

    Park

    Buildings

    Public

    Conveniences

    Residential

    Homes and

    Day Centres

    Sports

    Centres and

    Pools

    SUB-TOTAL Surplus

    Property

    Hard landscaping inc

    paths, boundary

    fences, play areas,

    etc, associated with

    parks, cems &

    SUB-TOTAL TOTAL

    GIA m2:

    Gas:

    total spend 0.00

    total kwh 0

    per m2

    0.00

    kwhper m2

    0

    Elec

    total spend 0.00

    total kwh 0

    per m2

    0.00

    kwhper m2

    0

    Oil

    total spend 0.00

    total kwh 0

    per m2

    0.00

    kwhper m2 0

    Solid Fuel

    total spend 0.00

    total kwh 0

    per m2

    0.00

    kwhper m2 0

    TOTAL 0.00

    TOTAL kwh 0

    Water

    total spend 0.00

    total m3

    0

    per m2 0.00

    m3

    er m2 0

    CO2 total 0

    CO2per m2 0

    SUITABILITY PROPERTY PERFORMANCE INDICATOR - MATRI

    TOTAL GIA m2:

    Main CIPFA Schools: Other Operational Buildings: Community Assets:

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    44/58

    Categories:

    Schools * Cemetaries

    and

    Crematoria

    (buildings

    only)

    Community

    Buildings

    Depots Education Non-

    Schools, eg,

    youth centres,

    residential

    education

    Fire Stations

    (where 'fire

    authority')

    Information

    Centres

    Libraries Mul ti -Storey

    Car Parks

    Museums and

    Galleries

    Offices,

    Administrative

    Buildings

    Park

    Buildings

    Public

    Conveniences

    Residential

    Homes and

    Day Centres

    Sports

    Centres and

    Pools

    SUB-TOTAL Surplu s

    Property

    (non-

    operational)

    Hard landscaping inc

    paths, boundary

    fences, play areas,

    etc, associated with

    parks, cems &

    SUB-TOTAL TOTAL

    GIA: 0 0 #REF!

    Number of Properties: 0 0 #REF!

    A = % of portfolio by GIAm2for

    which Suitability Survey has

    been undertaken

    B = Number of properties for

    which a suitability Survey has

    been undertaken

    Ci = % of properties graded as

    good or satisfactory

    Cii = % of properties for which

    grading has improved since the

    last suitability survey was

    carried out #REF!

    * NB: English authorities work to DfES requirements for schools, Welsh authorities may wish to use this approach for schools (see PMI.3 "Definition")

    ACCESSIBILITY PROPERTY PERFORMANCE INDICATOR - MATRI

    TOTAL GIA m2: 0

    Main CIPFA

    Categories:Schools: OtherOperational Buildings: Community Assets:

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    45/58

    g

    Schools * Cemetaries

    and

    Crematoria

    (buildings

    only)

    Community

    Buildings

    Depots Education Non-

    Schools, eg,

    youth centres,

    residential

    education

    Fire Stations

    (where 'fire

    authority')

    Information

    Centres

    Libraries Multi -S torey

    Car Parks

    Museums and

    Galleries

    Offices,

    Administrative

    Buildings

    Park Build ings Public

    Conveniences

    Residential

    Homes and

    Day Centres

    Sports Centres

    and Pools

    SUB-TOTAL Surplus

    Property (non-

    operational)

    Hard landscaping inc

    paths, boundary

    fences, play areas,

    etc, associated with

    parks, cems & crems,

    SUB-TOTAL TOTAL

    GIA:0 0

    Number of Properties:

    0 0

    A = % of portrolio by

    GIAm2for which an

    Access Audit has been

    undertaken

    B = Number of properties

    for which an Access Audit

    has been undertaken

    C = % of portfolio by

    GIAm2for which there is

    an Accessibility Plan in

    place

    D = Number of properties

    for which there is an

    Accessibility Plan in place

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    46/58

    Appendix 8.7

    8.7 Local Performance Indicators

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    47/58

    Local and Asset Management Performance Indicators

    Actual Target Actual Reporting Responsible

    Indicator 2004/5 2005/6 2005/6 Frequency Source Officer Reason

    Space Utilisation

    Office floor space per member of staff n/a 8m2 Annual JB JB To identify any surplus space available

    Follaton House only for third party organisations or

    (check Audit Commission Standard) shortage of space. Benchmarking

    with similar LA's

    Energy Consumption in units

    Green Electricity Follaton 600806kWh Annual TF TF To identify any significant changes in

    Leisure 1706341kWh Annual TF TF consumption or possible water leaks.

    Depots 102995kWh Annual TF TF Allow Services to identify and increases

    Toilets 226118kWh Annual TF TF or reductions in energy consumption

    Gas Follaton 408383kWh Annual TF TF Monitor CO2 emissions

    Leisure 3929483kWh Annual TF TF Benchmarking with other LA's

    Depots 0 0 Annual TF TF

    Toilets 0 0 Annual TF TF

    Water Follaton 2355 Annual TF TF

    Leisure 16792 Annual TF TF

    Depots 1641 Annual TF TF

    Toilets 23773 Annual TF TFCO2 emissions Follaton .0111t/m2 pa Annual TF TF

    Leisure .0699t/m2 pa Annual TF TF

    Depots 0 Annual TF TF

    Toilets 0 Annual TF TF

    Estate Management

    Income achieved as a % of target for the non 100% 100% Monthly Radius PA Monitor performance and benchmarking

    operational property portfolio

    % Occupancy 97% 90% Monthly Est Man Monitor performance, benchmarkingand indicator for economic activity in

    the district

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    48/58

    Asset Management

    Buildings

    % in categories A / B - Operational 88% 87% Annual AMP TF

    % in categories C / D - Operational 12% 13% Annual AMP TF

    % in categories A / B - Non Operational 95% 94% Annual AMP TF

    % in categories C / D - Non Operational 5% 6% Annual AMP TF

    % of buildings with public access which 43% 75% Annual Prop. Data TF

    are suitable for and accessible to persons

    with disabilities

    Repairs and Maintenance required works ? Annual AMP TF

    Marine and coastal assets

    % in categories A / B n/a Annual AMP WRL

    % in categories C / D n/a Annual AMP WRL

    Number of assets with public access n/a Annual Prop. Data WRL

    Repairs and Maintenance required works n/a Annual AMP WRL

    Property Services Performance

    Customer Survey n/a Annual Survey NH Monitor service delivery to our customers

    Responsive Repairs and Maintenance

    % of Priority 1 jobs completed on time n/a 100% Annual Prop. data TF To monitor service delivery and

    % of Priority 2 jobs completed on time n/a 90% Annual Prop. data TF benchmarking with other LA's% of Priority 3 jobs completed on time n/a 80% Annual Prop. data TF

    % of Priority 4 jobs completed on time n/a 70% Annual Prop. data TF

    % of Priority 5 jobs completed on time n/a 60% Annual Prop. data TF

    % of Priority 6 jobs completed on time n/a 50% Annual Prop. data TF

    R & M revenue expenditure as a % of the ? Annual Radius PB Benchmarking

    property portfolio value

    R & M capital expenditure as a % of the ? Annual Radius PB Benchmarking property portfolio value

    Ratio of planned to responsive maintenance n/a Annual Radius PB Benchmarking

    expenditure

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    49/58

    Actual Actual Actual

    Indicator Unit 2003/4 2004/5 2005/6

    Energy Consumption in units

    Green Electricity Follaton kWh 576892 600806 638318 Leisure kWh 1769486 1706341 1870130

    Depots kWh 44235 102995 86765

    Toilets kWh 199964 226118 tba

    Gas Follaton kWh 354421 408383 445988

    Leisure kWh 4109881 3929483 4161609

    Depots kWh n/a n/a n/a

    Toilets kWh n/a n/a n/a

    Water Follaton m3 2297 2355 2390

    Leisure m3 16490 16792 18971

    Depots m3 n/a 1641 tba

    Toilets m3 26296 23773 26844

    CO2 emissions Follaton t/m2 0.0097 0.0111 0.0122

    Leisure t/m2 0.0731 0.0699 0.074

    Depots t/m2 n/a n/a n/a

    Toilets t/m2 n/a n/a n/a

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    50/58

    Appendix 8.8

    8.8 Energy Consumption Data

    Energy Consumption 2006/7

    Electric kWh Gas kWh Water m3

    Grn /

    Service Site Exp code CCL 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total

    Car Parks Batson Boat/Car Pk Salcombe

    Civic Hall Totnes 2761

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    51/58

    Control Tower Park & Ride 0

    Glanville Mill Ivybridge

    Heaths Nursery Totnes

    Leechwell Lane Totnes

    Leonards Road Lighting

    Lower Quay K'B

    North Embankment C/P hut 1533Shadycombe Salcombe

    Steamer Quay

    Stoppipe tap Quay Car park K'B 32

    Umetered

    Unmetered Leonards Road

    Unmetered Bigbury 526

    unmetered Ivybridge 812

    Unmetered Salcombe 1271

    Unmetered Totnes 2411

    Depots Dartmouth

    Ivybridge 2897

    Tor Quarry 5014 197

    Stand Pipe Transfer Station 0

    Transfer Station 1811 0

    Totnes 12693

    Estates Malt House L/L 64

    1 Malt House 33

    2 Malt House 0

    3 Malt House 2

    4 Malt House 0

    5 Malt House 33

    6 Malt House 64

    7 Malt House 0

    8 Malt House 21

    9 Malt House 0

    10 Malt House 0

    11 Malt House 92

    7 Admirals Ct

    8 Admirals Ct

    9 Admirals CtAcorn Centre 11303 7810 42

    Ancor House 182

    Unit 9 Ash Court Lee MILL 273

    Babbage CT

    Babbage Ct Unmetered

    Caravan Site Steamer Quay 189

    Dart Bridge Dec The plains Totnes

    17 Ebrington St 0

    Erme Workshops

    Erme Mill L/L Supply 896

    Ermington Workshops 1748

    Ermington Mill

    Ermington Mill unit 1a

    Floodgate Dartmouth 131

    Garden mil

    Garden Mill unit 11 10

    Garden mill Toilets 14Gateway Pump Station Dartmout 2761

    11 Higer St Dartmouth 2436 2

    13 Leechwell st 1

    Lighting Unit B Steamer Quay R

    New Millls Pumping Station

    Public Tap Bayards cove 1

    Sewage Pump castle point Dartmout 3580

    Pump Depot Ivybridg 1002

    Tic Ivybridge 2276

    Unit 1 Nelson Road Dartmout

    Yachtmans Showers Totne

    Ferry Off ice 2853 2761

    Workshops old mill 44

    Lower slipway lighting Kingswear 331

    Old Mill Dartmouth

    Ferry Pontoon Kingswear 886

    Follaton Main Building 44819 216 188

    EU Mtr (1) 2018361301

    EU Mtr (2) 1474462901

    EU Mtr (3) 2018356001 0

    Energy Consumption 2006/7

    Electric kWh Gas kWh Water m3

    Grn /

    Service Site Exp code CCL 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total

    Harbour Harbour office fish Quay Salcombe

    Harbour office whitestrand Salcombe

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    52/58

    Harbour office whitestrand Salcombe

    Harbour Workshops Island St Salcombe

    Boat park Hut Batson

    Toilets Fishermans Quay lower Batson 176

    856

    Housing Avondale 229

    Leisure & Parks DartmouthKiosk adj to bandstand Royal Ave Gdns

    Kingsbridge Greenhouse Embankment Rd

    Kingsbridge Rec Ground Cottage

    Totnes Club House BoroughPark 106

    Totnes Longmarsh

    Totnes Pump House Borough Park 2843

    Bowling Green Dartmouth 24

    Dartmouth Greenhouse 4090

    Dartmouth Pavilion Coronation Park 2

    Dartmouth Royal Avenue Gardens 27

    Dartmouth Vault Coronation Park 1

    Kingsbridge Tennis Court

    Wembury Marine Centre 2720 208

    Toilets The Hard Noss Mayo 2761

    Beesands

    Bigbury 4030

    Bittaford

    Bridge Road Kingswear

    Bowcombe Creek 196

    Challaborough

    Dartmouth Castle Drive 61

    Dartmouth Coronation Park 120 32

    Dartmouth Market Sq 186

    Dartmouth North Embankment 1359

    Dartmouth Manor gardens 33

    Dartmouth Park & Ride 22

    Dittisham The Ham 52

    Fore st Kingsbridge monthly 68

    Fore St Yealmpton

    Holbeton 25Kingsbridge Recreation ground 108

    Kingsbridge Fore st 77

    Kingsbridge The Quay 137

    Leechwell Lane

    Leonards Road Ivybridge 821

    Loddiswell 246

    Malborough Kingsbridge

    Marine Drive Bigbury

    Modbury

    Salcombe Batson Road

    Salcombe Cliff house Gardens

    Salcombe North Sands

    Salcombe Shadycombe

    Salcombe South Sands

    Salcombe The Quay Lower Batson

    School road Stoke Fleming 253 57South Brent 24

    Slapton 240

    Staverton 17

    Steamer Quay - closed 58 53

    Strete

    Stoke Gabriel 43

    The Square Kingswear

    Thurlestone

    Torcross

    Totnes Civic Hall

    Totnes Coronation Road

    Unmetered PC'S 1339

    Wembury

    whitestrand

    Misc

    CO2 emissions in kg Electric kWh x 0.43 Gas kWh x 0.19

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    53/58

    Appendix8.9

    8.9 Energy Consumption per Service

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    54/58

    Energy Annual Consumption - Electric, Gas and Water

    06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17

    E kwh

    G kwh

    W m3

    E kwh

    G kwh

    W m3

    E kwh

    G kwhW m3

    E kwh

    G kwh

    W m3

    E kwh

    G kwh

    W m3

    E kwh

    G kwh

    W m3

    E kwh

    G kwh

    W m3

    E kwh

    G kwh

    W m3

    E kwh

    Toilets G kwh

    W m3

    E kwh

    G kwh

    W m3

    Leisure & Parks

    Misc

    Estates

    Ferry Office & Workshops

    Follaton

    Harbour Office & Workshops

    Service

    CarParks

    Depots

    Housing

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    55/58

    Appendix 8.10

    8.10 CO2 Emissions

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    56/58

    CO2 Emissions Annual Comparisons for Electric, Gas and Water

    06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17 17/18CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg

    CarParks

    Depots

    Estates

    Ferry Office & Workshops

    Follaton

    Harbour Office & Workshops

    Housing

    Leisure & ParksToilets

    Misc

    Total CO2 kg 0 0 0 0 0 0 0 0 0 0 0 0

    Service

    A di 8 11

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    57/58

    Appendix 8.11

    8.11 Customer Survey Form

  • 8/12/2019 2006 Asset Strategy App K - Building Mtce Policy

    58/58

    PROPERTY SERVICESCUSTOMER FEEDBACK FORM South Hams District Council

    Project or works

    Contractor

    Date the project or works were carried out

    How do you rate our performance on the above project or works. Please circle the appropriate number from 1 to 4. 1 = poor and 4 = excellent

    Property Services Team Score Contractors Performance ScoreStaff were professional and competent 1 2 3 4 Operatives were helpful and polite 1 2 3 4

    Staff were helpful and polite 1 2 3 4 Operatives were professional and competent 1 2 3 4

    Service was prompt and to the agreed timescale 1 2 3 4 Operatives had due regard for health and safety 1 2 3 4

    Service accurately met my needs 1 2 3 4 Standard of workmanship 1 2 3 4

    How effective were we at solving the problem ? 1 2 3 4 The site was left clean and tidy 1 2 3 4

    Overall quality of the service 1 2 3 4 Overall quality of the service 1 2 3 4

    Any other comments

    Thank you for your help. This information will help us to measure our success in meeting our customers needs.Please return the form to Pip West via the internal mail or in the envelope provided.

    Nick Hodgson Head of Property Services