Property ServicesBuilding Maintenance Policy
Contents
Summary
Preamble
1 Building Maintenance Policy
1.1 Introduction1.2 Objectives1.3 Intent and purpose1.4 Management Process1.5 Scope of Building Maintenance
2 Policy, Standards and Strategy
2.1 Maintenance Policy2.2 Maintenance Standards2.3 Maintenance Strategy
2.3.1 Risk Management Strategy2.3.2 Financial Management Strategy2.3.3 Procurement Strategy2.3.4 Management Strategy and Responsibilities2.3.5 Management Strategy Health and Safety2.3.6 Asset Life Cycle Costing Strategy2.3.7 Technical Strategy
3 Development of Policy, Strategy and Resources
3.1 Maintenance Planning3.2 Maintenance Budget3.3 Five Year Resource Plan3.4 Delivery of the Five Year Resource Plan
4 Strategic Maintenance Plan
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
3/58
Property ServicesBuilding Maintenance Policy
Summary
Objectives of the policy
To clearly set out the key objectives to ensure a consistent approach to themaintenance of the Councils assets for effective delivery of services
To encourage the adoption of asset management planning as a means ofdemonstrating value for money in the delivery of repairs and maintenance
To encourage development, adoption and regular reviews of policies forrepairs and maintenance
To encourage a focus on the needs of users and the community
To encourage harmonisation of repairs and maintenance practice andstandards with users expectations
To encourage the adoption of an efficient and consistent approach in thecollection and recording of the property inventory, condition surveys andstatus information
To encourage the adoption and regular review of a risk management regimeto determine operational standards and rectification of defects arising fromour own inspections and reports from the public
To encourage continuing innovation in the repair and maintenance ofbuildings and other assets, whilst complying with the high standards ofcorporate governance
To develop a rolling programme of Condition Surveys detailing the conditionof the Councils assets that will drive the Planned Maintenance Programmeon a yearly basis
To develop a 5 year Resource Plan to outline how the capital and revenueresources will be allocated to minimise the backlog of the highest priority
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
4/58
Preamble
Building Maintenance PolicyThe policy states the objectives for the maintenance of the Councils building assets andhow this effects the delivery of the service. It reflects the Councils approach tomaintenance and how the approach complies with any legislation.The policy outlines the responsibilities for the strategic and operational management ofmaintenance within the organisation.
Building Maintenance StrategyThe building maintenance strategy adopts the best approach to undertake maintenanceactivities.
Scope of Building MaintenanceThe scope of building maintenance establishes a uniform set of guidelines to ensureconsistency of reporting and monitoring
Strategic Maintenance PlanStrategic maintenance planning determines the future maintenance needs and strategiesfor a building portfolio by reviewing the condition of the assets and the potential future ofthe assets within any business strategies. The plan should be supported by a soundfinancial strategy, to ensure the assets are maintained in the longer term. The plan shouldform the basis on which annual budgets, plans and programmes are developed.
Asset ManagementThe theme of asset management is strengthened by Government guidance encouragingauthorities to draw up Asset Management Plans (AMP)
Condition SurveysCondition Surveys have been completed for all the buildings in the Councils portfolio.The surveys are a combination of condition surveys carried out by
In house staffBuilding Services ManagerBuilding ManagerProperty Asset Inspector
King Sturge Property Consultants
DCL Building Services Consultants
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
5/58
1 Building Maintenance Policy
1.1 IntroductionSouth Hams District Council has a portfolio of approximately 365 buildings providing over44,000m2 of accommodation from which it delivers services to the community and securesincome to the Authority. The buildings are physical assets which need to be properlymaintained to ensure that they continue to function as efficiently and effectively as possiblein supporting the delivery of a wide range of services.Deterioration of the buildings due to lack of maintenance can lead to future financialbacklogs that can affect service delivery and creation of health and safety issues.The maintenance of the building assets is critical to the management of physical assetsand to provide a good environment for staff and other users of the Councils buildings.
A policy for the management of maintenance is required to provide a consistent approachto the planning, management and reporting of building maintenance issues.
1.2 ObjectivesThe key objectives of the Building Maintenance Policy are
To specify the minimum requirements for the management of maintenance
To ensure that the buildings are adequately maintained
To ensure the that the risks to the Council are effectively managed
To ensure that Health and Safety objectives are met
To ensure the delivery of effective maintenance at department level
To ensure that the Council has the necessary information for monitoringmaintenance, condition and performance of building assets
To ensure there is adequate information at operational level for undertakingmaintenance, including the ability to review policies and strategies, analysing lifecycles, plan for replacement and upgrades and improve the efficiency andeffectiveness of the service
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
6/58
1.4 Maintenance Management Process
There are five key elements of the maintenance management process
Policy and Strategy
Strategic Planning
Implementation
Performance
Reporting
1.5 Scope of Building MaintenanceThis policy applies to the maintenance of all Council owned building assets. A building
asset is any roofed structure and its surrounding site. It includes;
Offices
Leisure Centres
Depots
Public Toilets
Industrial Units
Parks buildings
Tea Kiosks / Cafes
Shelters
Tourist Information Centres
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
7/58
Investment properties
Building maintenance activities are defined as: -
All work on existing building assets, including utility services and externalinfrastructure within the curtilage of the site that is undertaken to achievethe following objectives:
To retain the asset in a condition in which it can perform its
required function. To prevent deterioration and failure or extend the life of the asset.
To restore to correct operation within specified parameters
To restore physical condition to a specified standard
To recover from structural and service failure
To obtain accurate and objective knowledge of physical and
operating condition including risk and financial impact for the
purpose of maintenance; and Partial equivalent replacement of components of the asset
Work excluded from maintenance includes:
improvements and upgrading to meet new service capacity or function;
refurbishment to new condition to extend the capacity of the asset;
capital replacement of major components to extend the capacity or useful lifeof the asset
upgrading to meet new Statutory requirements;
operational tasks to enable occupancy and use (e.g. cleaning, security,waste removal);
supply of utilities (energy, water and telecommunications);
construction of new assets; and
major restoration as a result of natural and other disasters.
For leased / rented buildings, responsibility for maintenance is subject to the terms andconditions of each lease agreement. Advice on maintenance liability in respect of anyleased building is obtained from the Councils Estates Team.
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
8/58
2 Policy, Standards and Strategy
The following details the compliance requirements for the effective and efficientmanagement and delivery of building maintenance for the Council
2.1 Maintenance PolicyThe maintenance of the Councils building assets should be directed towards;
Meeting individual service delivery needs which are reflected in the standards towhich assets are to be maintained
Priorities based on the impact of condition on service delivery and risk
Minimising the whole life costing of the assets
Optimising capital receipts on disposal of building assets where additional incomeexceeds expenditure
Ensuring the most effective use of maintenance resources to aim to meet the AuditCommissions benchmark of 70% planned and 30% reactive
The key outcomes to be achieved from undertaking maintenance are;
Functional and operational requirements of the working environment are met
The physical condition and efficient operation of assets is kept to a standard,appropriate to their service function and value to the community
All statutory and technical requirements are met, to ensure that health, sagety andsecurity responsibilities are met
2.2 Maintenance Standards
Maintenance property ratings shall be established to ensure that the building assets aremaintained at an appropriate condition and in efficient operation.
Each property will be given a Property Rating between 1 and 5 to identify properties that
are critical for the delivery of services.
The condition of each the properties is shown in 4 ratings A to D, A being the highest.
For example, a property graded at 1D, would not be acceptable and significant workswould be required to bring the property up to 1A or 1B.
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
9/58
Property Rating
1 Core service, critical or high profile asset to be in the best possibleCondition
2 Core service, asset to be in good condition
3 Core service, asset to be in reasonable condition
4 Non core service, asset to meet minimum operational and statutory
5 Non core service, non operational property, surplus asset
Condition Rating
A Good performing as intended and operating efficiently
B Satisfactory performing as intended but showing signs of minor deterioration
C Poor showing major defects and / or not operating as intended
D Bad life expired and / or serious risk of imminent failure
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
10/58
2.3 Maintenance Strategy
The purpose of the strategy is to reflect the Councils approach to maintenance andsupport the strategic maintenance plan and policy established by the Council.
2.3.1 Risk Management Strategy
Risk associated with maintenance will be managed in the following order of priority;
1 Maintenance in respect of health and safety issues
2 Statutory maintenance requirements
Security
Fire
Gas
Electrical
Access systems
3 Structural maintenance
4 Building fabric maintenance for all Council owned building assets
5 Maintenance of unoccupied assets or assets awaiting disposal
2.3.2 Financial Management Strategy
A detailed Asset Strategy for the Councils building assets will form the basis of;
Determining the maintenance budget for planned and responsive maintenanceactivities to achieve the established standards and address the risks above
Identifying works that are to be considered for capitalisation
2.3.3 Procurement
Maintenance services are to be procured in accordance with the Councils Financial
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
11/58
2.3.6 Asset Life Cycle Costing Strategy
This is the total costs of ownership, including acquisition, operation and maintenance. Tominimise these costs and achieve best value;
Clear definition of the Councils requirements leading to a better understanding ofproject priorities
Reducing over specification
Effective planning of the design and construction process leading to improved
construction quality2.3.7 Technical Strategy
Maintenance activities are to be undertaken as follows
Maintenance Activities
Planned Undertaken as a result of the assets condition, used to prevent major
failure and reduce reactive maintenance over time
Term Used to comply with any manufacturers requirements for buildingservices
Reactive Day to day maintenance
Backlog Maintenance which has been deferred, normally due to a lack of fundingand other priorities
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
12/58
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
13/58
4 Strategic Maintenance Plan
The purpose of the plan is to look at the maintenance needs of each services portfolio ofbuilding assets over the immediate, medium and long term.
The Strategic Maintenance Plan is to incorporate asset management principles and utiliselife cycle planning and asset performance. It will have due regards for service delivery andthe asset strategy, age, condition and value and any other emerging issues which mayimpact on their service potential.
5 Maintenance Performance
5.1 Key Performance Indicators
The KPIs will be reported on the COPROP format.
5.2 Local Performance Indicators
Local PIs are collected to compliment the COPROP PIs
5.3 Customer Satisfaction
Scored satisfaction forms are sent to customers with a stamped, self addressed envelopefor return.The scores are calculated as a %, with 100% being the highest score.
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
14/58
6 Major Compliance Requirements
The following documents should be read in conjunction with this policy
EU DirectivesBritish StandardsHealth and Safety RegulationsWork Equipment RegulationsLift and hoist regulations
Pressure vessel regulationsPool water and safety regulationsLegionellaCorgi gas regulationsNICEIC electrical regulationsWater regulationsBuilding RegulationsPlanning and Conservation
Fire RegulationsFenestration Self Assessment SchemeDisability Discrimination ActAsbestos RegulationsConstruction Design Management regulationsHazardous Waste RegulationsDepartment of Environment, Food and Rural AffairsEnvironment AgencyHighway RegulationsControl of Substances Hazardous to HealthEnvironmental HealthWorking at height regulationsInstitute of Sport and Recreation Management swimmingpools
Machine Workshop Regulations
Documents and policies used
Asset Strategy
Repairs and Maintenance Policy
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
15/58
7 Responsibilities
Below are the key areas of responsibility for the building assets.
Property Services are responsible for
The management of this policy
Review of maintenance standards
Management of maintenance budgets
Building Services Team is responsible for
Delivery and implementation of maintenance services
Inspection of Public Areas and Buildings
Develop programmes within budgets available
Completion of the COPROP indicators
Updating condition surveys
Development of planned maintenance programmes
Maintaining accurate records of energy resources
Procurement of works using external contractors and consultants
Certification of invoices
Liaison with building users to ensure works are satisfactorily completed
Disaster and emergency responses
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
16/58
8 Appendices
8.1 Maintenance Expenditure 5 year plan
8.2 Capital Programme
8.3 Condition Survey Sample
8.4 Condition Survey Collection Sheet
8.5 Priorities for Reactive Maintenance
8.6 COPROP Performance Indicators
8.7 Local Performance Indicators
8.8 Energy Consumption Data
8.9 Energy Consumption per Service
8.10 CO2 Emissions
8.11 Customer Survey Form
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
17/58
Appendix 8.1
8.1 Maintenance Expenditure 5 year plan
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
18/58
Property Services
Maintenance Expenditure - 5 Year Resource Plan - April 2006
5 year Estimated expenditure Remaining
liability Year 1 Year 2 Year 3 Year 4 Year 5 Total liability
Revenue000's 2006/7 2006/7 2007/8 2008/9 2009/10 2011/12 expenditure 2012/13
Budget 872 900 927 954 982 4635 0
Responsive Maintenance 3749 776 760 747 734 732 3749 0
Planned Maintenance 1609 96 140 180 220 250 886 -723
Estimated % of planned work 11 16 19 23 25
5 year Estimated expenditure Remaining
liability Year 1 Year 2 Year 3 Year 4 Year 5 Total liability
Capital000's 2006/7 2006/7 2007/8 2008/9 2009/10 2011/12 expenditure 2012/13
Budget 3410 670 670 670 700 700 3410 0
Capital works 3659 782 1304 695 221 657 3659 -249
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
19/58
Appendix 8.2
8.2 Capital Programme
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
20/58
Capital Programme Oct-06
Start Year
Service Location Project Design Date 2006/7 2007/8 2008/9 Notes
HQ
Follaton Council Chamber A/C unit External Aug-06 15 Complete
Old building, redecoration, window In house TBA
repairs, roof repairs 75
Track to garden workshops on hold
Lightning protection External TBA 20
Safety lines on roof External TBA 20
Back up power supply External TBA 40
External redecoration of complex In house TBA 250
Reroofing old house In house TBA 250Car Park repairs TBA Possibly revenue
Carpet replacement In house TBA 38
Leisure
Quayside Replace boiler External TBA 50
Improvements to alarms External TBA 20 Check
Replace sports hall floor External TBA 50
Repair squash court walls External TBA 15
SDLC Replace sand filter sand, pipe repairs External TBA 50
pool tile repairs ExternalNew alarm and PA system External TBA 100
Replace squash court floors External TBA 20
Flat roofing replacement TBA TBA 60
Retile ODP and ring beam repairs TBA on hold 160k
Replace obsolete distribution boards External TBA 15
Replace boilers and controls External TBA 100
Replace sports hall floor External TBA 50
Totnes New alarm and PA system External Jun-06 85 in progress
Replace boilers External TBA 70
Replace air handling units External TBA 40
Public Buildings
Dartmouth Cor Pk Pavilion Install new external power supply In house on hold 10k
and demolish building
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
21/58
In house Start Year
Service Location Project design Date 2006/7 2007/8 2008/9 Notes
Toilets
Hallsands New building In house on hold 20k
Beesands Tiling n/a TBA 10
Totnes Civic Hall Major refurbishment In house TBA 80 WK14
Kingswear The Square Refurbishment In house TBA 40
Kingsbridge Fore Street Refurbishment In house on hold 20k
Kingbridge Quay Refurbishment In house on hold 60k Possible development
E Portlemouth Ferry Steps Sewer connection External TBA 60
Dartmouth Market Square Refurbishment In house on hold 30k Possible development
Dartmouth Coronation Park Refurbishment In house on hold 30k Possible development
East Prawle Refurbishment n/a TBA 15Manor Gardens Sewer connection In house TBA 10
Estates
Kingsbridge Garden Mill Replace roofing Ext / in house on hold 60
Wall cladding and doors Ext / in house on hold 53
Totnes Wills Road Replace roofing Ext / in house TBA 40
Civic Hall store Refurbishment / housing In house TBA 30
Leisure and Parks
Borough Park Replace temporary storeage In house TBA 20
Creacombe Cottage Structural repairs Ext TBA 10Steamer Quay caf Replace flooring In house TBA 15
Bowls Club Kingsbridge Roof and wall repairs etc TBA TBA 60
Totals 245 1201 490
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
22/58
In house Start Year
Service Location Project design Date 2006/7 2007/8 2008/9 Notes
Infrastructure
Car Parks Totnes Civic Hall Redesign and resurface In house TBA ???
Totnes Longmarsh Redesign and resurface In house TBA 50
Salcombe Shadycombe Retaining wall repairs External TBA 20
Churchyards South Milton Repairs to church boundary walls External Aug-06 30 in progress
Public Areas Kingsbrige slipway Surfacing repairs In house TBA 20
Kingsbridge Town Square Replace defective lighting External Sep-06 10 in progress
Kingsbridge Recreation Grd Repairs to 2 retaining walls External TBA 40
Salcombe Footbridge New footpath bridge External Mar-07 25Dartmouth Royal Avenue Gdns New lighting Ext / in house TBA 60
Totnes Leechwell Structural works Ext / in house TBA 30 Check decked car park
Passenger Ferry Pontoon Bridge Kingswear Replace decking, electrical upgrade and External PS & spec 40
redec
Totals 105 190 30
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
23/58
In house Start Year
Service Location Project design Date 2006/7 2007/8 2008/9 Notes
Refuse Torr Quarry Raise push wall In house on hold 40k
Reserves
Ferry Workshops Replace cladding In house TBA 100
Welfare area refurbishments In house TBA 50
Replacement lighting External TBA 10
Slipway rails, winch's etc External TBA 25
Salcombe Harbour Workshops Rewiring and internal alterations Ext / in house TBA 20 40
HousingAvondale Refurbishment In house TBA
Completed works Final cost
Dartmouth Bandstand roo fing 26
Dartmouth Replacement street ligh ting 21
Totnes Booking k iosk roof 13
Follaton Counc il chamber a/c un it tba
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
24/58
Appendix 8.3
8.3 Condition Survey Sample
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
25/58
Property Data Sheet Building number
Site Club / Changing Room - Recreation Ground Kingsbridge Survey Date 01 04 06 Floor area
Repair Responsibility Int Ext Both None Consultants Survey Date tba m2 9339
Revenue Capital
% category Years Years
Element A B C D Sub element Work required 1 2 3 4 5 6 to 10 1 2 3 4 5 6 to 10 DDA
Roof 100 Covering Replace 30
Structure Defective Timbers 10
R W goods
Other
Walls ext Finishes
50 50 Structure
Other Damp 5
Windows 100 Frames 5
Doors 100 Door
FramesFloors 100 Finishes
Structure
Ceilings 50 50 Finishes Asbestos 10
Walls - int 100 Finishes
Fixtures 100 Kitchen
Sanitary ware
Cubicles
Other
Redecoration 100 External 4 4
Internal
M & E 100 Heating
Ventilating
Air con
C W System
H W System
Elec wiring 5
Elec fittings
Lighting
Gas
Security
Fire alarms
P A system
Lifts
Other
External 100 Drains
Paths
Walls / fences
Car Parks
Refurbishment 0 0 0 0 Major
Minor
DDA Upgrade
Total Score 0 900 200 0 Total Expenditure - Year 0 0 0 4 0 9 0 0 60 0 0 0 0
% Score 0 81.82 18.18 0 5 year expenditure
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
26/58
Appendix 8.4
8.4 Condition Survey Collection Sheet
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
27/58
Asset Management All Buildings Live
Revenue and Capital Expenditure 5 Year Plan
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
28/58
DDA
A% B% C% D% yr1 yr2 yr3 yr4 yr5 yr1 yr2 yr3 yr4 yr5 yr1
Buildings - OperationalProp
RatingRef
Condition Category
Floor
Area
GIA
Overall
AMP
Category
Required Maintenance
Revenue
yr6 to 10
Capital
yr6 to 10
Salcombe Cliff House Gardens 9031 A 9 82 14 5 0 0.0 0.0 0.4 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Salcombe Cliff House Gardens (Closed) 9032 C 9 0 23 77 0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Salcombe Creek Gould Road 9033 A 34 100 0 0 0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Salcombe North Sands Cliff Road 9034 A 30 91 0 9 0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.0 0.0 0
Salcombe South Sands 9036 B 25 27 73 0 0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0Salcombe Whitestrand Quay 9037 A 36 100 0 0 0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Shipley Bridge 9041 A 27 100 0 0 0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Slapton Memorial Car Park 9039 A 31 82 18 0 0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
South Brent Stockbridge Lane 9042 B 27 0 100 0 0 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
South Milton N. Trust Beach 9044 B 14 9 84 7 0 0.0 0.6 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Staverton 9045 B 16 20 70 10 0 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 0.0 0.0 0
Stoke Fleming School Lane 9046 B 21 18 82 0 0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Stoke Gabriel Gabriel Court 9047 B 10 18 75 7 0 0.0 0.0 0.0 0.3 0.0 1.0 0.0 0.0 0.0 0.0 0.0 5.0 0
Strete Gate 9051 B 13 18 78 4 0 0.0 0.0 0.0 0.7 1.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Thurlestone Near Golf Club 9052 D 16 0 0 27 73 0.6 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Torcross Tank Car Park 9357 A 39 100 0 0 0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Totnes Borough Park (Closed) 9053 C 14 0 0 100 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0Totnes Civic Hall 9054 C 31 0 25 53 22 1.0 0.0 0.0 0.0 0.0 0.0 0.0 80.0 0.0 0.0 0.0 0.0 0
Totnes Coronation Road 9055 A 35 86 14 0 0 0.0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Totnes Leechwell Street 9056 C 16 0 25 53 23 0.5 0.0 0.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 0
Totnes Steamer Quay (Sold) 9057 C 0 0 0 100 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Totnes Steamer Quay (New) 9322 A 50 100 0 0 0 0.0 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Ugborough The Square 9059 A 19 64 36 0 0 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Wembury Beach 9061 A 32 91 9 0 0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Tea Koisks / Cafs *
Coronation Park Dartmouth (Including putting store) 9091 A 15 100 0 0 0 0.0 0.0 2.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Mayors Avenue Car Park Dartmouth 9106 B 9 0 100 0 0 1.0 0.0 1.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 5.0 0
Royal Avenue Gardens Dartmouth 9089 A 16 100 0 0 0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0Caf Castle Dartmouth ( Sold) 9080 A 0 0.0 0.0 0.0 0.0 0
Tea Room Recreation Ground Kingsbridge/ Club 9109 B 100 0 100 0 0 0.0 0.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Colin Horswill
Property Services 2 30/10/2006
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
29/58
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
30/58
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
31/58
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
32/58
Asset Management All Buildings Live
Revenue and Capital Expenditure 5 Year Plan
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
33/58
DDA
A% B% C% D% yr1 yr2 yr3 yr4 yr5 yr1 yr2 yr3 yr4 yr5 yr1
Buildings - OperationalProp
RatingRef
Condition Category
Floor
Area
GIA
Overall
AMP
Category
Required Maintenance
Revenue
yr6 to 10
Capital
yr6 to 10
Unit 14, Ermington Workshops, Ermington 9176 B 92 0 64 27 9 4.2 0.0 0.0 0.0 0.0 0.0 26.0 0.0 0.0 0.0 0.0 0.0 0
Unit 15, Ermington Workshops, Ermington 9177 B 92 0 64 27 9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Toilets, behind 9 and 9A Ermington Workshops 9178 B 4 39 52 9 0 1.7 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0
Basement, Ermington Mill, Ermington Including DDA 9179 B 82
Unit 1, Ground Floor, Ermington Mill 9180 C 30 9 34 48 9 0.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0 205.0 0.0 0.0 265.0 0
Unit 2, Ground Floor, Ermington Mill 9181 C 19
Unit 3, Ground Floor, Ermington Mill 9182 C 18
Unit 4, Ground Floor, Ermington Mill 9183 C 21Unit 1, Lower Ground Floor, Ermington Mill 9184 C 27
Unit 2, Lower Ground Floor, Ermington Mill 9185 C 22
Unit 3, Lower Ground Floor, Ermington Mill 9186 C 23
Unit 4, Lower Ground Floor, Ermington Mill 9187 C 23
Unit 1A, The Annexe, Ermington Mill 9188 C 65
Unit 2A, The Annexe, Ground Floor, Ermington Mill 9189 C 39
Unit 2B, The Annexe, Ground Floor, Ermington Mill 9190 C 13
Upper Ground Floor, Ermington Mill 9191 C 172
Unit 1, East Way, Lee Mill 9192 D 215 0 36 18 45 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit 2, East Way, Lee Mill 9193 D 152 0 36 18 45 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit 3, East Way, Lee Mill 9194 D 204 0 36 18 45 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0Unit 5, Room 1, Acorn Centre, Lee Mill 9195 B 83 18 82 0 0 6.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 0
Unit 5, Room 2, Acorn Centre, Lee Mill 9196 B 46
Unit 5, Room 3, Acorn Centre, Lee Mill 9197 B 36
Unit 5, Room 4, Acorn Centre, Lee Mill 9198 B 48
Unit 5, Room 5, Acorn Centre, Lee Mill 9199 B 56
Unit 5,Acorn Centre, Lee Mill Kitchen - Shared use 9200 B 20
Unit 1, Oak Court, Lee Mill 9201 A 75 100 0 0 0 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit 2, Oak Court, Lee Mill, 9202 A 75
Unit 3, Oak Court, Lee Mill 9203 A 75
Unit 4, Oak Court, Lee Mill 9204 A 75
Tesco Store & Service Rd, Lee Mill 9205 * 6516
Unit 1, Ash Court, Lee Mill 9206 A 144 91 9 0 0 5.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0Unit 2, Ash Court, Lee Mill 9207 A 73
Unit 3, Ash Court, Lee Mill 9208 A 73
Unit 4, Ash Court, Lee Mill, 9209 A 145
Unit 5, Ash Court, Lee Mill 9210 A 73
Colin Horswill
Property Services 7 30/10/2006
Asset Management All Buildings Live
Revenue and Capital Expenditure 5 Year Plan
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
34/58
DDA
A% B% C% D% yr1 yr2 yr3 yr4 yr5 yr1 yr2 yr3 yr4 yr5 yr1
Buildings - OperationalProp
RatingRef
Condition Category
Floor
Area
GIA
Overall
AMP
Category
Required Maintenance
Revenue
yr6 to 10
Capital
yr6 to 10
Unit 6, Ash Court, Lee Mill, 9211 A 73
Unit 7, Ash Court, Lee Mill, 9212 A 73
Unit 8, Ash Court, Lee Mill 9213 A 73
Unit 9, Ash Court, Lee Mill 9214 A 73
Unit 10, Ash Court, Lee Mill 9215 A 105
Unit 11, Ash Court, Lee Mill 9216 A 105
Unit 12, Ash Court, Lee Mill 9217 A 70
Unit 13, Ash Court, Lee Mill 9218 A 70Unit 14, Ash Court, Lee Mill 9219 A 70
Unit 15, Ash Court, Lee Mill 9220 A 70
Old Fire Station, Western Rd, Ivybridge 9221 B 97 0 100 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit 1, Bridge Court, Ivybridge 9222 A 70 100 0 0 0 0.0 0.0 0.0 0.0 0.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit 2, Bridge Court, Ivybridge 9223 A 64
Unit 3, Bridge Court, Ivybridge 9224 A 70
Unit 4, Bridge Court, Ivybridge 9225 A 70
Unit 1, Garden Mill, Kingsbridge 9226 B 37 10 80 10 0 6.5 0.0 0.0 0.0 0.0 6.5 113.0 0.0 0.0 0.0 0.0 0.0 0
Unit 2, Garden Mill, Kingsbridge 9227 B 37
Unit 3, Garden Mill, Kingsbridge 9228 B 37
Unit 4, Garden Mill, Kingsbridge 9229 B 37Unit 5, Garden Mill, Kingsbridge 9230 B 37
Unit 6, Garden Mill, Kingsbridge 9231 B 28
Unit 7, Garden Mill, Kingsbridge 9232 B 28
Unit 8, Garden Mill, Kingsbridge 9233 B 28
Unit 9, Garden Mill, Kingsbridge 9234 B 28
Unit 10, Garden Mill, Kingsbridge 9235 B 24
Unit 11, Garden Mill, Kingsbridge 9236 B 28
Unit 12, Garden Mill, Kingsbridge 9237 B 28
Unit 13, Garden Mill, Kingsbridge 9238 B 28
Unit 14, Garden Mill, Kingsbridge 9239 B 28
Unit 15, Garden Mill, Kingsbridge 9240 B 28
Unit 1, The Malthouse, Kingsbridge Including DDA 9241 C 22 0 9 82 9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0Unit 2, The Malthouse, Kingsbridge 9242 C 24
Unit 3, The Malthouse, Kingsbridge 9243 C 21
Unit 4, The Malthouse, Kingsbridge 9244 C 31
Unit 5, The Malthouse, Kingsbridge 9245 C 20
Colin Horswill
Property Services 8 30/10/2006
Asset Management All Buildings Live
Revenue and Capital Expenditure 5 Year Plan
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
35/58
DDA
A% B% C% D% yr1 yr2 yr3 yr4 yr5 yr1 yr2 yr3 yr4 yr5 yr1Buildings - Operational PropRating
Ref
Condition Category
Floor
Area
GIA
Overall
AMP
Category
Required Maintenance
Revenue
yr6 to 10
Capital
yr6 to 10
Unit 6, The Malthouse, Kingsbridge 9246 C 27
Unit 7, The Malthouse, Kingsbridge 9247 C 9
Unit 8, The Malthouse, Kingsbridge 9248 C 11
Unit 9, The Malthouse, Kingsbridge 9249 C 25
Unit10, The Malthouse, Kingsbridge 9250 C 32
Unit 11, The Malthouse, Kingsbridge 9251 C 31
Unit 1, New Mills, Modbury 9252 A A 100 0 0 0 0.0 0.0 0.0 10.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit 2, New Mills, Modbury 9253 A A
Unit 3, New Mills, Modbury 9254 A 66
Unit 4, New Mills, Modbury 9255 A 66Unit 5, New Mills, Modbury 9256 A 66
Unit 6, New Mills, Modbury 9257 A 66
Unit 7, New Mills, Modbury 9258 A 66
Unit 8, New Mills, Modbury 9259 A 66
Unit 9, New Mills, Modbury 9260 A 66
Unit 10, New Mills, Modbury 9261 A 390
Unit 1, Island Street, Salcombe 9262 B 143 9 73 18 0 0.0 4.0 0.0 0.0 18.0 1.0 0.0 102.0 0.0 0.0 18.0 0.0 0
Unit 2, Island Street, Salcombe 9263 B 133
Unit 3a, Island Street, Salcombe 9264 B 36
Unit 3b, Island Street, Salcombe 9265 B 116
Unit 4, Island Street, Salcombe 9266 B 120Unit 5a, Island Street, Salcombe 9267 B 35
Unit 5b, Island Street, Salcombe 9268 B 120
Unit 6, Island Street, Salcombe 9269 B 116
Unit 2a, Dart Units, Totnes 9270 C 130 0 27 64 9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit 2b, Dart Units, Totnes 9271 C 121
Unit 1, Wills Road, Totnes 9272 B 129 0 82 9 9 3.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 0.0 0.0 0.0 0
Unit 2, Wills Road Totnes 9273 B 112
Unit 3, Wills Road Totnes 9274 B 112
Unit 4, Burke Rd, Totnes 9275 B 119 0 45 45 9 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit 5, Burke Road, Totnes 9276 B 112
Unit 6, Burke Road, Totnes 9277 B 112
Unit 11, Burke Rd, Totnes 9278 B 30Unit 12, Burke Rd, Totnes 9279 B 29
Unit 13, Burke Rd, Totnes 9280 B 30
Unit 14, Burke Rd, Totnes 9281 B 31
Unit 15, Burke Rd, Totnes 9282 B 13
Unit 16, Burke Rd, Totnes 9283 B 13
Unit 17, Burke Rd, Totnes 9284 B 13
Colin Horswill
Property Services 9 30/10/2006
Asset Management All Buildings Live
Revenue and Capital Expenditure 5 Year Plan
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
36/58
DDA
A% B% C% D% yr1 yr2 yr3 yr4 yr5 yr1 yr2 yr3 yr4 yr5 yr1
Buildings - OperationalProp
RatingRef
Condition Category
Floor
Area
GIA
Overall
AMP
Category
Required Maintenance
Revenue
yr6 to 10
Capital
yr6 to 10
Unit 18, Burke Rd, Totnes 9285 B 13
Unit 19, Burke Rd, Totnes 9286 B 13
Unit 20, Burke Rd, Totnes 9287 B 13
Woodford Garage, Babbage Rd, Totnes 9288 B 217 0 100 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
13 Leechwell St, Totnes, Ground & Part 1st Floor 9289 B 167 0 64 36 0 0.0 0.0 0.0 0.0 8.0 17.0 0.0 0.0 0.0 0.0 0.0 35.0 0
13 Leechwell St, Totnes, 1 room 1st Floor 9290 B 8
Lower Weston Community Hall, Totnes 9291 A 78 76 24 0 0 0.1 0.1 0.1 0.1 1.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit A1, Dart Marine Park, Steamer Quay, Totnes 9292 A 51 95 5 0 0 7.8 0.0 4.5 0.0 12.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit A2, Dart Marine Park, Steamer Quay, Totnes 9293 A 51
Unit A3, Dart Marine Park, Steamer Quay, Totnes 9294 A 51
Unit A4, Dart Marine Park, Steamer Quay, Totnes 9295 A 51
Unit A5, Dart Marine Park, Steamer Quay, Totnes 9296 A 54
Unit A6, Dart Marine Park, Steamer Quay, Totnes 9297 A 56
Unit A6a, Dart Marine Park, Steamer Quay, Totnes 9298 A 56
Unit A7, Dart Marine Park, Steamer Quay, Totnes 9299 A 56
Unit A7a, Dart Marine Park, Steamer Quay, Totnes 9300 A 56
Unit A8, Dart Marine Park, Steamer Quay, Totnes 9301 A 81
Unit A8a, Dart Marine Park, Steamer Quay, Totnes 9302 A 81
Unit A9, Dart Marine Park, Steamer Quay, Totnes 9303 A 54Unit A9a, Dart Marine Park, Steamer Quay, Totnes 9304 A 58
Unit A10, Dart Marine Park, Steamer Quay, Totnes 9305 A 54
Unit A10a, Dart Marine Park, Steamer Quay, Totnes 9306 A 54
Building B, Dart Marine Park, Steamer Quay, Totnes 9307 A 413
Chandlery Bdg B, Dart Marine Pk, Steamer Quay, Totnes9308 A 63
Building C, Dart Marine Park, Steamer Quay, Totnes 9309 A 312
Building D, Dart Marine Park, Steamer Quay, Totnes 9310 A 312
Unit 1 Babbage Court Totnes 9365 A 64 100 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Unit 2 Babbage Court Totnes 9366 A 64
Unit 3 Babbage Court Totnes 9367 A 64Fishermans Store, 1 Salcombe, 9311 B 12 0 82 18 0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Fishermans Store, 2 Salcombe, 9312 B 12
Fishermans Store, 3 Salcombe, 9313 B 12
Toilet Block Fishermans Store Salcombe 9363 B 0 82 18 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Colin Horswill
Property Services 10 30/10/2006
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
37/58
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
38/58
Appendix 8.5
8.5 Priorities for Reactive Maintenance
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
39/58
Property Services
Priorities for Reactive Maintenance
Priority TargetCompletiontimes
Description
1 Immediate /24hrs
Immediate, threat to Health and Safety, risk ofinjury, major interruption of service delivery
2 3 days Urgent, minor interruption of service delivery
3 7 days Routine repairs, dependant upon materials andresources
4 14 days Routine repairs, dependant upon materials andresources
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
40/58
Appendix 8.6
8.6 COPROP Performance Indicators
SUGGESTED OPERATIONAL PROPERTY CATEGORIE
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
41/58
SUGGESTED OPERATIONAL PROPERTY CATEGORIEFOR COPROP PERFORMANCE INDICATORS
property categories. The aim is to provide Authorities with a comparable list of categories for
compiling the indicator data. If you find you have a group of properties not listed here, butwhich fit the definition of operational properties, then obviously add that category into your
list, conversely you may not have property in all of these categories, so simply do not use
them. Where you have dual-use properties, collate the data against the dominant service if
it cannot easily be split. Where buildings have been outsourced, but are still providing a
public service, in the interests of Best Practice the managing body should be required to
collect PI information, (outsourced buildings is a good example of a property category you
Inc lus ions:
Main CIPFA Categor Schools sub-categories:
None (you can sub-categorise this further to suit your own needs)
Main CIPFA Category Other (Land and) Buildings sub-categories:
Cemeteries and Crematoria (buildings only)Community BuildingDepotsEducation Non-Schools(eg, youth centres, residential education centres)Fire Stations (applicable to 'fire authorities')Information CentresLibrariesMulti-Storey Car Parks
Museums and GalleriesOffices, Administrative BuildingsPark BuildingsPublic ConveniencesResidential Homes and Day Centres (you can sub-categorise this further to suit your own needs)Sports Centres and Pools, including sports pavilions and changing facilitieSurplus Property (non-operational)
Main CIPFA Category Community Assets sub-categories:Hard landscaping, including paths, boundary fences, play areas, etc, associated with parks, cit is not anticipated that land itself will be captured as part of the performance indicators due
to several issues, eg, that of comparing hectares with GIA and land not generally having
energy consumption, or a condition grade, and so on. This obviously does not prevent
CONDITION PROPERTY PERFORMANCE INDICATOR MATRIX
Schools: Other Operational Buildings : Community Assets:
Schools Cemetar ies and
C t i
Community
B ildi
D ep ot s E du ca ti on No n-
S h l
Fire Stations
( h 'fi
Information
C t
Libraries Multi -Storey
C P k
Museums and
G ll i
Offices,
Ad i i t ti
P ar k B ui ld in gs P ub li c
C i
Residential
H d D
Sports Centres
d P l
SUB-TOTAL Surplus
P t
Hard landscaping inc
th b d
SUB-TOTAL TOTAL
Main CIPFA
Category:
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
42/58
Crematoria
(buildings only)
Buildings Schools, eg,
youth centres,
residential
education
centres
(where 'fire
authority')
Centres Car Parks Galleries Administrative
Buildings
Conveniences Homes and Day
Centres
and Pools Property
(non-
operational)
paths, boundary
fences, play areas, etc,
associated with parks,
cems & crems, etc
Percentage in A
Condition Categories B
A, B, C, D C
D
1
2
3
1
2
3
1B iii)
1C
1D i)
1D ii)
1D iii) P P P P P P P P P P P P P P P P P P P P
R R R R R R R R R R R R R R R R R R R R
1B i) Total Cost in Priority Levels
1A
Annual % change
Overall Cost per m2
1B ii) Priority Levels Percentages
%split Planned / Responsive
Spend perm2
Total Spend
ENVIRONMENTAL PROPERTY PERFORMANCE INDICATOR - MATRIX * use a formula to calculate per m2figures
TOTAL GIA m2: 0
Main CIPFA
C t i
Schools: Other Operational Buildings: Community Assets:
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
43/58
Categories:
ENERGY SPEND
& CONSUMPTION
BY PROPERTY
CATEGORY
Schools Cemetaries
and
Crematoria
(buildings
only)
Community
Buildings
Depots Education Non-
Schools, eg,
youth centres,
residential
education
Fire Stations
(where 'fire
authority')
Information
Centres
Libraries Mul ti -Storey
Car Parks
Museums and
Galleries
Offices,
Administrative
Buildings
Park
Buildings
Public
Conveniences
Residential
Homes and
Day Centres
Sports
Centres and
Pools
SUB-TOTAL Surplus
Property
Hard landscaping inc
paths, boundary
fences, play areas,
etc, associated with
parks, cems &
SUB-TOTAL TOTAL
GIA m2:
Gas:
total spend 0.00
total kwh 0
per m2
0.00
kwhper m2
0
Elec
total spend 0.00
total kwh 0
per m2
0.00
kwhper m2
0
Oil
total spend 0.00
total kwh 0
per m2
0.00
kwhper m2 0
Solid Fuel
total spend 0.00
total kwh 0
per m2
0.00
kwhper m2 0
TOTAL 0.00
TOTAL kwh 0
Water
total spend 0.00
total m3
0
per m2 0.00
m3
er m2 0
CO2 total 0
CO2per m2 0
SUITABILITY PROPERTY PERFORMANCE INDICATOR - MATRI
TOTAL GIA m2:
Main CIPFA Schools: Other Operational Buildings: Community Assets:
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
44/58
Categories:
Schools * Cemetaries
and
Crematoria
(buildings
only)
Community
Buildings
Depots Education Non-
Schools, eg,
youth centres,
residential
education
Fire Stations
(where 'fire
authority')
Information
Centres
Libraries Mul ti -Storey
Car Parks
Museums and
Galleries
Offices,
Administrative
Buildings
Park
Buildings
Public
Conveniences
Residential
Homes and
Day Centres
Sports
Centres and
Pools
SUB-TOTAL Surplu s
Property
(non-
operational)
Hard landscaping inc
paths, boundary
fences, play areas,
etc, associated with
parks, cems &
SUB-TOTAL TOTAL
GIA: 0 0 #REF!
Number of Properties: 0 0 #REF!
A = % of portfolio by GIAm2for
which Suitability Survey has
been undertaken
B = Number of properties for
which a suitability Survey has
been undertaken
Ci = % of properties graded as
good or satisfactory
Cii = % of properties for which
grading has improved since the
last suitability survey was
carried out #REF!
* NB: English authorities work to DfES requirements for schools, Welsh authorities may wish to use this approach for schools (see PMI.3 "Definition")
ACCESSIBILITY PROPERTY PERFORMANCE INDICATOR - MATRI
TOTAL GIA m2: 0
Main CIPFA
Categories:Schools: OtherOperational Buildings: Community Assets:
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
45/58
g
Schools * Cemetaries
and
Crematoria
(buildings
only)
Community
Buildings
Depots Education Non-
Schools, eg,
youth centres,
residential
education
Fire Stations
(where 'fire
authority')
Information
Centres
Libraries Multi -S torey
Car Parks
Museums and
Galleries
Offices,
Administrative
Buildings
Park Build ings Public
Conveniences
Residential
Homes and
Day Centres
Sports Centres
and Pools
SUB-TOTAL Surplus
Property (non-
operational)
Hard landscaping inc
paths, boundary
fences, play areas,
etc, associated with
parks, cems & crems,
SUB-TOTAL TOTAL
GIA:0 0
Number of Properties:
0 0
A = % of portrolio by
GIAm2for which an
Access Audit has been
undertaken
B = Number of properties
for which an Access Audit
has been undertaken
C = % of portfolio by
GIAm2for which there is
an Accessibility Plan in
place
D = Number of properties
for which there is an
Accessibility Plan in place
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
46/58
Appendix 8.7
8.7 Local Performance Indicators
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
47/58
Local and Asset Management Performance Indicators
Actual Target Actual Reporting Responsible
Indicator 2004/5 2005/6 2005/6 Frequency Source Officer Reason
Space Utilisation
Office floor space per member of staff n/a 8m2 Annual JB JB To identify any surplus space available
Follaton House only for third party organisations or
(check Audit Commission Standard) shortage of space. Benchmarking
with similar LA's
Energy Consumption in units
Green Electricity Follaton 600806kWh Annual TF TF To identify any significant changes in
Leisure 1706341kWh Annual TF TF consumption or possible water leaks.
Depots 102995kWh Annual TF TF Allow Services to identify and increases
Toilets 226118kWh Annual TF TF or reductions in energy consumption
Gas Follaton 408383kWh Annual TF TF Monitor CO2 emissions
Leisure 3929483kWh Annual TF TF Benchmarking with other LA's
Depots 0 0 Annual TF TF
Toilets 0 0 Annual TF TF
Water Follaton 2355 Annual TF TF
Leisure 16792 Annual TF TF
Depots 1641 Annual TF TF
Toilets 23773 Annual TF TFCO2 emissions Follaton .0111t/m2 pa Annual TF TF
Leisure .0699t/m2 pa Annual TF TF
Depots 0 Annual TF TF
Toilets 0 Annual TF TF
Estate Management
Income achieved as a % of target for the non 100% 100% Monthly Radius PA Monitor performance and benchmarking
operational property portfolio
% Occupancy 97% 90% Monthly Est Man Monitor performance, benchmarkingand indicator for economic activity in
the district
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
48/58
Asset Management
Buildings
% in categories A / B - Operational 88% 87% Annual AMP TF
% in categories C / D - Operational 12% 13% Annual AMP TF
% in categories A / B - Non Operational 95% 94% Annual AMP TF
% in categories C / D - Non Operational 5% 6% Annual AMP TF
% of buildings with public access which 43% 75% Annual Prop. Data TF
are suitable for and accessible to persons
with disabilities
Repairs and Maintenance required works ? Annual AMP TF
Marine and coastal assets
% in categories A / B n/a Annual AMP WRL
% in categories C / D n/a Annual AMP WRL
Number of assets with public access n/a Annual Prop. Data WRL
Repairs and Maintenance required works n/a Annual AMP WRL
Property Services Performance
Customer Survey n/a Annual Survey NH Monitor service delivery to our customers
Responsive Repairs and Maintenance
% of Priority 1 jobs completed on time n/a 100% Annual Prop. data TF To monitor service delivery and
% of Priority 2 jobs completed on time n/a 90% Annual Prop. data TF benchmarking with other LA's% of Priority 3 jobs completed on time n/a 80% Annual Prop. data TF
% of Priority 4 jobs completed on time n/a 70% Annual Prop. data TF
% of Priority 5 jobs completed on time n/a 60% Annual Prop. data TF
% of Priority 6 jobs completed on time n/a 50% Annual Prop. data TF
R & M revenue expenditure as a % of the ? Annual Radius PB Benchmarking
property portfolio value
R & M capital expenditure as a % of the ? Annual Radius PB Benchmarking property portfolio value
Ratio of planned to responsive maintenance n/a Annual Radius PB Benchmarking
expenditure
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
49/58
Actual Actual Actual
Indicator Unit 2003/4 2004/5 2005/6
Energy Consumption in units
Green Electricity Follaton kWh 576892 600806 638318 Leisure kWh 1769486 1706341 1870130
Depots kWh 44235 102995 86765
Toilets kWh 199964 226118 tba
Gas Follaton kWh 354421 408383 445988
Leisure kWh 4109881 3929483 4161609
Depots kWh n/a n/a n/a
Toilets kWh n/a n/a n/a
Water Follaton m3 2297 2355 2390
Leisure m3 16490 16792 18971
Depots m3 n/a 1641 tba
Toilets m3 26296 23773 26844
CO2 emissions Follaton t/m2 0.0097 0.0111 0.0122
Leisure t/m2 0.0731 0.0699 0.074
Depots t/m2 n/a n/a n/a
Toilets t/m2 n/a n/a n/a
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
50/58
Appendix 8.8
8.8 Energy Consumption Data
Energy Consumption 2006/7
Electric kWh Gas kWh Water m3
Grn /
Service Site Exp code CCL 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total
Car Parks Batson Boat/Car Pk Salcombe
Civic Hall Totnes 2761
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
51/58
Control Tower Park & Ride 0
Glanville Mill Ivybridge
Heaths Nursery Totnes
Leechwell Lane Totnes
Leonards Road Lighting
Lower Quay K'B
North Embankment C/P hut 1533Shadycombe Salcombe
Steamer Quay
Stoppipe tap Quay Car park K'B 32
Umetered
Unmetered Leonards Road
Unmetered Bigbury 526
unmetered Ivybridge 812
Unmetered Salcombe 1271
Unmetered Totnes 2411
Depots Dartmouth
Ivybridge 2897
Tor Quarry 5014 197
Stand Pipe Transfer Station 0
Transfer Station 1811 0
Totnes 12693
Estates Malt House L/L 64
1 Malt House 33
2 Malt House 0
3 Malt House 2
4 Malt House 0
5 Malt House 33
6 Malt House 64
7 Malt House 0
8 Malt House 21
9 Malt House 0
10 Malt House 0
11 Malt House 92
7 Admirals Ct
8 Admirals Ct
9 Admirals CtAcorn Centre 11303 7810 42
Ancor House 182
Unit 9 Ash Court Lee MILL 273
Babbage CT
Babbage Ct Unmetered
Caravan Site Steamer Quay 189
Dart Bridge Dec The plains Totnes
17 Ebrington St 0
Erme Workshops
Erme Mill L/L Supply 896
Ermington Workshops 1748
Ermington Mill
Ermington Mill unit 1a
Floodgate Dartmouth 131
Garden mil
Garden Mill unit 11 10
Garden mill Toilets 14Gateway Pump Station Dartmout 2761
11 Higer St Dartmouth 2436 2
13 Leechwell st 1
Lighting Unit B Steamer Quay R
New Millls Pumping Station
Public Tap Bayards cove 1
Sewage Pump castle point Dartmout 3580
Pump Depot Ivybridg 1002
Tic Ivybridge 2276
Unit 1 Nelson Road Dartmout
Yachtmans Showers Totne
Ferry Off ice 2853 2761
Workshops old mill 44
Lower slipway lighting Kingswear 331
Old Mill Dartmouth
Ferry Pontoon Kingswear 886
Follaton Main Building 44819 216 188
EU Mtr (1) 2018361301
EU Mtr (2) 1474462901
EU Mtr (3) 2018356001 0
Energy Consumption 2006/7
Electric kWh Gas kWh Water m3
Grn /
Service Site Exp code CCL 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total
Harbour Harbour office fish Quay Salcombe
Harbour office whitestrand Salcombe
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
52/58
Harbour office whitestrand Salcombe
Harbour Workshops Island St Salcombe
Boat park Hut Batson
Toilets Fishermans Quay lower Batson 176
856
Housing Avondale 229
Leisure & Parks DartmouthKiosk adj to bandstand Royal Ave Gdns
Kingsbridge Greenhouse Embankment Rd
Kingsbridge Rec Ground Cottage
Totnes Club House BoroughPark 106
Totnes Longmarsh
Totnes Pump House Borough Park 2843
Bowling Green Dartmouth 24
Dartmouth Greenhouse 4090
Dartmouth Pavilion Coronation Park 2
Dartmouth Royal Avenue Gardens 27
Dartmouth Vault Coronation Park 1
Kingsbridge Tennis Court
Wembury Marine Centre 2720 208
Toilets The Hard Noss Mayo 2761
Beesands
Bigbury 4030
Bittaford
Bridge Road Kingswear
Bowcombe Creek 196
Challaborough
Dartmouth Castle Drive 61
Dartmouth Coronation Park 120 32
Dartmouth Market Sq 186
Dartmouth North Embankment 1359
Dartmouth Manor gardens 33
Dartmouth Park & Ride 22
Dittisham The Ham 52
Fore st Kingsbridge monthly 68
Fore St Yealmpton
Holbeton 25Kingsbridge Recreation ground 108
Kingsbridge Fore st 77
Kingsbridge The Quay 137
Leechwell Lane
Leonards Road Ivybridge 821
Loddiswell 246
Malborough Kingsbridge
Marine Drive Bigbury
Modbury
Salcombe Batson Road
Salcombe Cliff house Gardens
Salcombe North Sands
Salcombe Shadycombe
Salcombe South Sands
Salcombe The Quay Lower Batson
School road Stoke Fleming 253 57South Brent 24
Slapton 240
Staverton 17
Steamer Quay - closed 58 53
Strete
Stoke Gabriel 43
The Square Kingswear
Thurlestone
Torcross
Totnes Civic Hall
Totnes Coronation Road
Unmetered PC'S 1339
Wembury
whitestrand
Misc
CO2 emissions in kg Electric kWh x 0.43 Gas kWh x 0.19
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
53/58
Appendix8.9
8.9 Energy Consumption per Service
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
54/58
Energy Annual Consumption - Electric, Gas and Water
06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17
E kwh
G kwh
W m3
E kwh
G kwh
W m3
E kwh
G kwhW m3
E kwh
G kwh
W m3
E kwh
G kwh
W m3
E kwh
G kwh
W m3
E kwh
G kwh
W m3
E kwh
G kwh
W m3
E kwh
Toilets G kwh
W m3
E kwh
G kwh
W m3
Leisure & Parks
Misc
Estates
Ferry Office & Workshops
Follaton
Harbour Office & Workshops
Service
CarParks
Depots
Housing
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
55/58
Appendix 8.10
8.10 CO2 Emissions
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
56/58
CO2 Emissions Annual Comparisons for Electric, Gas and Water
06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17 17/18CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg CO2 kg
CarParks
Depots
Estates
Ferry Office & Workshops
Follaton
Harbour Office & Workshops
Housing
Leisure & ParksToilets
Misc
Total CO2 kg 0 0 0 0 0 0 0 0 0 0 0 0
Service
A di 8 11
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
57/58
Appendix 8.11
8.11 Customer Survey Form
8/12/2019 2006 Asset Strategy App K - Building Mtce Policy
58/58
PROPERTY SERVICESCUSTOMER FEEDBACK FORM South Hams District Council
Project or works
Contractor
Date the project or works were carried out
How do you rate our performance on the above project or works. Please circle the appropriate number from 1 to 4. 1 = poor and 4 = excellent
Property Services Team Score Contractors Performance ScoreStaff were professional and competent 1 2 3 4 Operatives were helpful and polite 1 2 3 4
Staff were helpful and polite 1 2 3 4 Operatives were professional and competent 1 2 3 4
Service was prompt and to the agreed timescale 1 2 3 4 Operatives had due regard for health and safety 1 2 3 4
Service accurately met my needs 1 2 3 4 Standard of workmanship 1 2 3 4
How effective were we at solving the problem ? 1 2 3 4 The site was left clean and tidy 1 2 3 4
Overall quality of the service 1 2 3 4 Overall quality of the service 1 2 3 4
Any other comments
Thank you for your help. This information will help us to measure our success in meeting our customers needs.Please return the form to Pip West via the internal mail or in the envelope provided.
Nick Hodgson Head of Property Services
Office use only Total score = divided by 48 x 100 = %