1
Spot prices were aligned across the mainland for 95 per cent of the time, averaging between $21/MWh in Queensland and $27/MWh in South Australia. The average weekly price in Tasmania was $32/MWh. Turnover in the energy market was $82 million. The total cost of ancillary services for the week, including Tasmania, was around $480 000, or approximately 0.6 per cent of energy market turnover. Significant variations between actual prices and those forecast 4 and 12 hours ahead occurred in 29, or around 9 per cent of all trading intervals. Demand forecasts produced 4 and 12 hours ahead varied from actual by more than 5 per cent in around a quarter of all trading intervals across the market. These variations were most frequent in South Australia occurring in two thirds of all trading intervals. Energy prices Figure 1 sets out national demand and spot prices in each region for each trading interval. Figure 2 compares the volume weighted average price with the averages for the previous week, the same quarter last year and for the financial year to date. Figure 3 compares the weekly price volatility index with the averages for the previous week and the same quarter last year. Figure 1: national demand and spot prices
0
50
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
0
16,000
32,000M
W
Queensland New South Wales VictoriaSouth Australia Tasmania National demand
Market analysis
16 APRIL – 22 APRIL 2006
© Commonwealth of Australia.
2
Figure 2: volume weighted average spot price for energy market ($/MWh)
QLD NSW VIC SA TAS Last week 21 22 22 27 32 Previous week 17 20 26 31 45 Same quarter last year 23 28 27 36 - Financial year to date 33 46 37 45 65 % change from previous week* ▲24% ▲8% ▼16% ▼15% ▼27% % change from same quarter last year** ▼9% ▼23% ▼18% ▼25% - % change from year to date*** ▲1% ▼7% ▲26% ▲12% -
*The percentage change between last week’s average spot price and the average price for the previous week. **The percentage change between last week’s average spot price and the average price for the same quarter last year. ***The percentage change between the average spot price for the current financial year to date and the average spot price over the similar period for the previous financial year.
Figure 3: volatility index during peak periods
QLD NSW VIC SA TAS Last week 0.55 0.46 0.50 0.37 0.12 Previous week 0.39 0.41 0.41 0.31 0.22 Same quarter last year 0.73 0.74 0.78 0.70 -
Figures 4 to 8 show the weekly correlation between spot price and demand.
Figure 4: Queensland Figure 5: New South Wales
1
10
100
1,000
10,000
3000
4000
5000
6000
7000
8000
9000
MW
$/M
Wh
1
10
100
1,000
10,000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
MW
$/M
Wh
Figure 6: Victoria Figure 7: South Australia
1
10
100
1,000
10,000
3000
4000
5000
6000
7000
8000
9000
MW
$/M
Wh
1
10
100
1,000
10,000
500
1000
1500
2000
2500
3000
MW
$/M
Wh
© Commonwealth of Australia.
3
Figure 8: Tasmania
1
10
100
1,000
10,000
500
1000
1500
2000
2500
MW
$/M
Wh
Maximum spot prices across the mainland ranged from $87/MWh in New South Wales to $98/MWh in South Australia, these all occurred at 6.30pm on Thursday. In Tasmania, the maximum spot price reached $75/MWh on Wednesday afternoon. Figure 9 sets out the d-cyphaTrade wholesale electricity price index (WEPI) for each region throughout the week excluding Tasmania. Figure 10 sets out the WEPI since 1 January 2004. Figure 9: d-cyphaTrade WEPI for the week
Monday Tuesday Wednesday Thursday Friday Queensland N/A 38.63 39.23 38.83 39.06 New South Wales N/A 42.88 43.58 43.45 42.95 Victoria N/A 35.07 35.35 35.71 35.69 South Australia N/A 39.83 40.74 40.81 41.44 Figure 10: d-cyphaTrade WEPI
0
20
40
60
80
100
120
140
160
180
Jan
04Fe
b 04
Mar
04
Apr
04
May
04
Jun
04Ju
l 04
Aug
04
Sep
04O
ct 0
4N
ov 0
4D
ec 0
4Ja
n 05
Feb
05M
ar 0
5A
pr 0
5M
ay 0
5Ju
n 05
Jul 0
5A
ug 0
5Se
p 05
Oct
05
Nov
05
Dec
05
Jan
06Fe
b 06
Mar
06
Apr
06
Queensland New South Wales Victoria South Australia
Reserve There was no low reserve conditions forecast.
© Commonwealth of Australia.
4
Figures 11 to 15: spot price, net import and limit at time of weekly maximum demand
Figure 11: Queensland Figure 12: New South Wales
7,032 MW
0 MW
351 MW
$ 89
1 10 100 1,000 10,000 100,000
10,079 MW
814 MW
3,112 MW
$ 27
1 10 100 1,000 10,000 100,000
Figure 13: Victoria Figure 14: South Australia
6,977 MW
433 MW
1,772 MW
$ 90
1 10 100 1,000 10,000 100,000
1,757 MW
389 MW
667 MW
$ 31
1 10 100 1,000 10,000 100,000
Figure 15: Tasmania
1,396 MW
0 MW
0 MW
$ 35
1 10 100 1,000 10,000 100,000
Spot Price
Net Import limit
Net Import
Max Demand
© Commonwealth of Australia.
5
Price variations
There were 29 trading intervals where actual prices significantly varied from forecasts made 4 and 12 hours ahead of dispatch. Figures 16 to 20 show the difference in actual and forecast price versus the difference in actual and forecast demand. The figures highlight the relationship between price variation and demand forecast error. The information is presented in terms of the percentage difference from actual. Price differences beyond 100 per cent have been capped.
Figure 16: Queensland Figure 17: New South Wales
-20.0
-10.0
0.0
10.0
20.0
-100% -50% 0% 50% 100%price change %
dem
and
chan
ge %
-20.0
-10.0
0.0
10.0
20.0
-100% -50% 0% 50% 100%price change %
dem
and
chan
ge %
Figure 18: Victoria Figure 19: South Australia
-20.0
-10.0
0.0
10.0
20.0
-100% -50% 0% 50% 100%price change %
dem
and
chan
ge %
-20.0
-10.0
0.0
10.0
20.0
30.0
-100% -50% 0% 50% 100%price change %
dem
and
chan
ge %
Figure 20: Tasmania
-20.0
-10.0
0.0
10.0
20.0
-100% -50% 0% 50% 100%price change %
dem
and
chan
ge %
4hrs to dispatch
12 hours to dispatch
© Commonwealth of Australia.
6
Figure 21 summarises the number and most probable reason for variations between forecast and actual prices. Figure 21: reasons for variations between forecast and actual prices
0
10
20
30
40
50
QLD NSW VIC SA TAS
Var
iatio
ns
Demand Availability Network Combination
Price and demand Figures 22 - 51 set out details of spot prices and demand on a regional basis. They include the actual spot price, actual demand outcomes and variation from forecasts made 4 and 12 hours ahead of dispatch on a daily basis. The differences between the maximum temperature and the temperature forecast at around 6.00 pm the day before are also included. Figures 52 - 56 set out for each region the extent of capacity offered into the market within a series of price thresholds. Actual price and generation dispatched in a region are overlaid.
© Commonwealth of Australia.
7
Figures 22-27: Queensland actual spot price, demand and forecast differences
0
2500
5000
7500
10000
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
MW
0
50
100
150
200
250
$/M
Wh
Capacity Demand Spot price
-100
-50
0
50
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
Price difference (actual - forecast) - 4hrs
-10.0
-5.0
0.0
5.0
10.0
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
%
Demand difference (actual - forecast) - 4hrs
-100
-50
0
50
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
Price difference (actual - forecast) -12 hrs
-10
-5
0
5
10
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
%
Demand difference (actual - forecast) - 12hrs
25.831.929.228.527.325.326.1-10
0
10
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
Temperature difference (actual - forecast) - day ahead
Co
© Commonwealth of Australia.
8
There were four occasions in Queensland where the spot price was greater than three times the weekly average price of $21/MWh. Thursday, 20 April 6:30 pm Actual 4 hr forecast 12 hr forecast Price ($/MWh) 88.80 96.44 24.54 Demand (MW) 7032 6897 6903 Available capacity (MW) 8331 8231 8774
Conditions at the time saw demand and availability close to forecast. Price was close to forecast four hours ahead, and aligned across the mainland. At around 11 pm the previous evening, Tarong Energy’s Tarong North tripped from 440 MW. At around 2 pm a delay in the return of the unit saw 440 MW of capacity removed for the 6.30pm trading interval. All of this capacity was priced at less than $11/MWh. The rebid reason given was “RTS Delayed::Adjust Profile”. As much as 225 MW of capacity at Wivenhoe was shifted from prices above $9000/MWh to below $100/MWh by Tarong Energy over the course of the day. The rebid reasons given were “F Change in PD::Extend W2 run” and “F Change in PDS”. There was no other significant rebidding. Friday, 21 April 6:30 pm Actual 4 hr forecast 12 hr forecast Price ($/MWh) 62.61 40.97 23.04 Demand (MW) 6473 7149 6773 Available capacity (MW) 7976 8361 8774
Conditions at the time saw demand around 700 MW lower than forecast 4 hours ahead. Available capacity was 400 MW lower than forecast 4 hours ahead and 800 MW lower than 12 hours ahead. Price was aligned across the mainland. At around 5.30 pm, Enertrade’s Gladstone unit 3 tripped from 245 MW. Most of this capacity was priced below $30/MWh. The unit returned to service at around 9.30 pm. Further delays in the return of Tarong Energy’s Tarong North, following its trip on Wednesday, saw 440 MW of capacity removed from the 6.30pm trading interval through a rebid at around midday. All of this capacity was priced at less than $15/MWh. The rebid reason given was “RTS Delayed::Adjust Profile”. There was no other significant rebidding.
© Commonwealth of Australia.
9
Saturday, 22 April 9:30 am Actual 4 hr forecast 12 hr forecast Price ($/MWh) 64.72 25.61 25.88 Demand (MW) 5829 5999 5999 Available capacity (MW) 8128 8282 8282
Conditions at the time saw demand and available capacity close to forecast, with prices aligned across the mainland. At 9 am, CS Energy reduced the availability of Callide B2 by around half or 185 MW. Most of this capacity was priced at less than $15/MWh. The rebid reason given was “CB2 ash plant problems”. There was no other significant rebidding. Saturday, 22 April 6:30 pm Actual 4 hr forecast 12 hr forecast Price ($/MWh) 83.38 85.69 28.95 Demand (MW) 6204 6271 6175 Available capacity (MW) 8129 8097 8725
Conditions at the time saw demand, available capacity and price close to forecast 4 hours ahead, with prices aligned across the mainland. There was around 600 MW of low priced capacity removed from the market, compared to that forecast 12 hours earlier, following further delays in the return of Tarong Energy’s Tarong North, and the reduction of CS Energy’s Callide B 2 earlier in the day. There was no other significant rebidding.
© Commonwealth of Australia.
10
Figures 28-33 New South Wales actual spot price, demand and forecast differences
-10.0
-5.0
0.0
5.0
10.0
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
%
Demand difference (actual - forecast) - 4hrs
0
3000
6000
9000
12000
15000
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
MW
0
50
100
150
200
250
$/M
Wh
Capacity Demand Spot price
-10
-5
0
5
10
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
%
Demand difference (actual - forecast) - 12hrs
-100-50
050
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
Price difference (actual - forecast) - 4hrs
-100
-50
0
50
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
Price difference (actual - forecast) -12 hrs
20 24.2 24.7 31 28 23.4 19.9-10
0
10
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
Temperature difference (actual - forecast) - day ahead
Co
© Commonwealth of Australia.
11
There were three occasions in New South Wales where the spot price was greater than three times the weekly average price of $22/MWh. Thursday, 20 April 6:30 pm Actual 4 hr forecast 12 hr forecast Price ($/MWh) 87.04 92.19 25.01 Demand (MW) 9936 10 002 9953 Available capacity (MW) 10 367 10 505 10 505
Conditions at the time saw demand and available capacity close to forecast four hours ahead, with prices were aligned across the mainland. There was no significant rebidding. Saturday, 22 April 9:30 am Actual 4 hr forecast 12 hr forecast Price ($/MWh) 71.55 27.46 27.77 Demand (MW) 8744 8697 8811 Available capacity (MW) 8659 8895 8895
Conditions at the time saw demand close to forecast with availability around 250 MW lower than forecast four hours ahead. Prices were aligned across the mainland. Rebids made close to dispatch saw reductions in availability totaling around 250 MW, across the Macquarie Generation and Eraring portfolios and at Redbank. Most of this capacity was priced at less than $30/MWh. There was no other significant rebidding. Saturday, 22 April 6:30 pm Actual 4 hr forecast 12 hr forecast Price ($/MWh) 86.79 88.60 32.99 Demand (MW) 9259 9359 9301 Available capacity (MW) 9235 9235 9280
Conditions at the time saw demand, available capacity and price close to forecast four and 12 hours ahead, with prices aligned across the mainland. There was no significant rebidding.
© Commonwealth of Australia.
12
Figures 34-39: Victoria actual spot price, demand and forecast differences
-100
-50
0
50
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
Price difference (actual - forecast) -12 hrs
-100
-50
0
50
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
Price difference (actual - forecast) - 4hrs
0
2500
5000
7500
10000
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
MW
0
50
100150
200
250
$/M
Wh
Capacity Demand Spot price
-10.0
-5.0
0.0
5.0
10.0
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
%
Demand difference (actual - forecast) - 4hrs
-10
-5
0
5
10
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
%
Demand difference (actual - forecast) - 12hrs
15.6 19.9 20.1 21.1 16.4 16 15.2-10
0
10
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
Temperature difference (actual - forecast) - day ahead
Co
© Commonwealth of Australia.
13
There were three occasions in Victoria where the spot price was greater than three times the weekly average price of $22/MWh. Thursday, 20 April 6:30 pm Actual 4 hr forecast 12 hr forecast Price ($/MWh) 90.27 93.42 26.34 Demand (MW) 6977 6639 6503 Available capacity (MW) 7255 7246 7408
Conditions at the time saw demand 350 MW higher than forecast four hours ahead with available capacity and price close to forecast. Prices were aligned across the mainland. There was no significant rebidding. Saturday, 22 April 9:30 am Actual 4 hr forecast 12 hr forecast Price ($/MWh) 72.88 28.15 27.87 Demand (MW) 5763 5785 5781 Available capacity (MW) 6927 7109 7223
Conditions at the time saw demand and available capacity close to that forecast four hours ahead. Prices were aligned across the mainland. Available capacity was 300 MW lower than forecast 12 hours ahead. From midnight, International Power reduced the available capacity at Hazelwood by around 490 MW. The rebid reasons given were “Coal Supply Problem”, Fuel limitation” and “Draft Plant Limit”. As a result of the coal supply problems, unit one at Hazelwood was shutdown at around 8am. The unit finally returned to service around midnight. There was no other significant rebidding. Saturday, 22 April 6:30 pm Actual 4 hr forecast 12 hr forecast Price ($/MWh) 89.73 92.90 34.77 Demand (MW) 6353 6252 6245 Available capacity (MW) 7011 7149 7242
Conditions at the time saw demand and available capacity close to forecast four hours ahead. Prices were aligned across the mainland. Available capacity was 250 MW lower than forecast 12 hours ahead. . There was around 180 MW of low priced capacity removed from the market following delays in the return of International Power’s Hazelwood unit 1 from an outage earlier in the day. There was no other significant rebidding.
© Commonwealth of Australia.
14
Figures 40-45: South Australia actual spot price, demand and forecast differences
0
1000
2000
3000
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
MW
050100150200250
$/M
Wh
Capacity Demand Spot price
-100
-50
0
50
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
Price difference (actual - forecast) - 4hrs
-10.0
-5.00.05.0
10.0
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
%
Demand difference (actual - forecast) - 4hrs
-100
-50
0
50
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
Price difference (actual - forecast) -12 hrs
-10
-5
0
5
10
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
%
Demand difference (actual - forecast) - 12hrs
21.8 18.8 17.6 20.8 17.7 17.1 17.3-10
0
10
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
Temperature difference (actual - forecast) - day ahead
Co
© Commonwealth of Australia.
15
There were two occasions in South Australia where the spot price was greater than three times the weekly average price of $27/MWh. Thursday, 20 April 6:30 pm Actual 4 hr forecast 12 hr forecast Price ($/MWh) 96.70 98.95 30.03 Demand (MW) 1563 1554 1527 Available capacity (MW) 2088 2091 2091
Conditions at the time saw demand and available capacity close to that forecast 4 hours earlier. Prices were aligned across the mainland. There was no significant rebidding. Saturday, 22 April 6:30 pm Actual 4 hr forecast 12 hr forecast Price ($/MWh) 98.05 99.41 38.00 Demand (MW) 1483 1463 1454 Available capacity (MW) 1944 1944 1944 Conditions at the time saw demand and available capacity close to forecasts, with prices aligned across the mainland. There was no significant rebidding
© Commonwealth of Australia.
16
Figures 46-51: Tasmania actual spot price, demand and forecast differences
0
1000
2000
3000
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
MW
050100150200250
$/M
Wh
Capacity Demand Spot price
-100
-50
0
50
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
Price difference (actual - forecast) - 4hrs
-10.0
-5.0
0.0
5.0
10.0
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
%
Demand difference (actual - forecast) - 4hrs
-100
-50
0
50
100
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$/M
Wh
Price difference (actual - forecast) -12 hrs
-10
-5
0
5
10
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
%
Demand difference (actual - forecast) - 12hrs
12.1 16.1 18.6 20.2 13.1 12.4 14.1-10
0
10
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
Temperature difference (actual - forecast) - day ahead
Co
There was no occasion where the spot price in Tasmania was greater than three times the weekly average price of $32/MWh.
© Commonwealth of Australia.
17
Figure 52: Queensland closing bid prices, dispatched generation and spot price
0
2000
4000
6000
8000
10000
12000
Sun
0:3
0
Sun
12:
30
Mon
0:3
0
Mon
12:
30
Tue
0:3
0
Tue
12:
30
Wed
0:3
0
Wed
12:
30
Thu
0:3
0
Thu
12:
30
Fri
0:30
Fri
12:3
0
Sat
0:30
Sat
12:3
0
(MW
)
0
50
100
150
200
250
300
($/M
Wh)
Fixed < $0 < $10 < $15 < $20< $30 < $50 < $100 < $500 < $1000< $5000 < $9000 > $9000 Region generation RRP
Figure 53: New South Wales closing bid prices, dispatched generation and spot price
0
2000
4000
6000
8000
10000
12000
Sun
0:3
0
Sun
12:
30
Mon
0:3
0
Mon
12:
30
Tue
0:3
0
Tue
12:
30
Wed
0:3
0
Wed
12:
30
Thu
0:3
0
Thu
12:
30
Fri
0:30
Fri
12:3
0
Sat
0:30
Sat
12:3
0
(MW
)
0
50
100
150
200
250
300
($/M
Wh)
Fixed < $0 < $10 < $15 < $20< $30 < $50 < $100 < $500 < $1000< $5000 < $9000 > $9000 Region generation RRP
© Commonwealth of Australia.
18
Figure 54: Victoria closing bid prices, dispatched generation and spot price
0
2000
4000
6000
8000
10000
12000
Sun
0:3
0
Sun
12:
30
Mon
0:3
0
Mon
12:
30
Tue
0:3
0
Tue
12:
30
Wed
0:3
0
Wed
12:
30
Thu
0:3
0
Thu
12:
30
Fri
0:30
Fri
12:3
0
Sat
0:30
Sat
12:3
0
(MW
)
0
50
100
150
200
250
300
($/M
Wh)
Fixed < $0 < $10 < $15 < $20< $30 < $50 < $100 < $500 < $1000< $5000 < $9000 > $9000 Region generation RRP
Figure 55: South Australia closing bid prices, dispatched generation and spot price
0
500
1000
1500
2000
2500
3000
Sun
0:3
0
Sun
12:
30
Mon
0:3
0
Mon
12:
30
Tue
0:3
0
Tue
12:
30
Wed
0:3
0
Wed
12:
30
Thu
0:3
0
Thu
12:
30
Fri
0:30
Fri
12:3
0
Sat
0:30
Sat
12:3
0
(MW
)
0
50
100
150
200
250
300
($/M
Wh)
Fixed < $0 < $10 < $15 < $20< $30 < $50 < $100 < $500 < $1000< $5000 < $9000 > $9000 Region generation RRP
© Commonwealth of Australia.
19
Figure 56: Tasmania closing bid prices, dispatched generation and spot price
0
500
1000
1500
2000
2500
3000
Sun
0:3
0
Sun
12:
30
Mon
0:3
0
Mon
12:
30
Tue
0:3
0
Tue
12:
30
Wed
0:3
0
Wed
12:
30
Thu
0:3
0
Thu
12:
30
Fri
0:30
Fri
12:3
0
Sat
0:30
Sat
12:3
0
(MW
)
0
500
1000
1500
2000
2500
3000
($/M
Wh)
Fixed < $0 < $10 < $15 < $20< $30 < $50 < $100 < $500 < $1000< $5000 < $9000 > $9000 Region generation RRP
Ancillary service market The total cost of ancillary services on the mainland for the week was around $445 000 or 0.7 per cent of the total turnover in the energy market on the mainland. Figure 57 summarises the volume weighted average prices and costs for the eight frequency control ancillary services across the interconnected regions.
Figure 57: frequency control ancillary service prices and costs
Raise 6 sec
Raise 60 sec
Raise 5 min
Raise reg
Lower 6 sec
Lower 60 sec
Lower 5 min
Lower reg
Last week 2.78 1.00 1.95 1.28 0.29 0.32 1.54 1.89
Previous week 2.78 0.91 1.46 1.16 0.31 0.31 1.08 1.84
Last quarter 1.76 0.73 1.15 1.54 0.39 2.28 5.00 1.93
Market Cost ($1000s) 147 53 131 28 3 3 38 41
% of energy market 0.24% 0.09% 0.21% 0.05% 0.00% 0.01% 0.06% 0.07%
The total cost of ancillary services in Tasmania for the week was $35 000 or 0.2 per cent of the total turnover in the energy market in Tasmania. Figure 58 summarises for Tasmania the prices and costs for the eight frequency control ancillary services.
© Commonwealth of Australia.
20
Figure 58: frequency control ancillary service prices and costs for Tasmania
Raise 6 sec
Raise 60 sec
Raise 5 min
Raise reg
Lower 6 sec
Lower 60 sec
Lower 5 min
Lower reg
Last week 0.15 0.10 0.10 0.12 1.69 0.11 0.10 0.11
Previous week 0.15 0.10 0.10 4.93 0.44 0.10 0.10 0.10
Last quarter 7.89 1.05 1.05 1.58 4.43 1.06 1.06 1.97
Market Cost ($1000s) 1 1 1 1 25 3 3 1
% of energy market 0.01% 0.00% 0.00% 0.00% 0.12% 0.02% 0.01% 0.00% Figure 59 shows the daily breakdown of cost for each frequency control ancillary service. Figure 59: daily frequency control ancillary service costs
020,000
40,00060,00080,000
100,000120,000
16/4/06 17/4/06 18/4/06 19/4/06 20/4/06 21/4/06 22/4/06
$
Raise 6sec Raise 60sec Raise 5min Raise Reg. Lower 6sec Lower 60sec Lower 5min Lower Reg
Figure 60 shows the contribution, on a percentage basis, that frequency control ancillary service providers are utilised (in each mainland region) to satisfy the total requirement for each service.
Figure 60: regional participation in ancillary services on the mainland
0%20%40%60%80%
100%
Raise 6second
Raise 60second
Raise 5minute
Raiseregulating
Lower 6second
Lower 60second
Lower 5minute
Lowerregulating
Queensland New South Wales Snowy Victoria South Australia
Figures 61 and 62 show 30-minute prices for each frequency control ancillary service throughout the week.
© Commonwealth of Australia.
21
Figure 61: prices for raise services
0
3
6
9
12
16/04/06 17/04/06 18/04/06 19/04/06 20/04/06 21/04/06 22/04/06
$/M
W
Raise Reg Raise 5min Raise 60sec Raise 6sec
Figure 61A: prices for raise services - Tasmania
0
1
2
3
4
5
16/04/06 17/04/06 18/04/06 19/04/06 20/04/06 21/04/06 22/04/06
$/M
W
Raise Reg Raise 5min Raise 60sec Raise 6sec
Figure 62: prices for lower services
0
2
4
6
8
16/04/06 17/04/06 18/04/06 19/04/06 20/04/06 21/04/06 22/04/06
$/M
W
Lower Reg Lower 5min Lower 60sec Lower 6sec
Figure 62A: prices for lower services - Tasmania
0
2
4
6
8
16/04/06 17/04/06 18/04/06 19/04/06 20/04/06 21/04/06 22/04/06
$/M
W
Lower Reg Lower 5min Lower 60sec Lower 6sec
Figures 63 and 64 present for both raise and lower frequency control services the requirement, established by NEMMCO, for each service to satisfy the frequency standard.
© Commonwealth of Australia.
22
Figure 63: raise requirements
0
125
250
375
500
16/04/06 17/04/06 18/04/06 19/04/06 20/04/06 21/04/06 22/04/06
MW
Raise Reg Raise 5min Raise 60sec Raise 6sec
Figure 63A: raise requirements - Tasmania
0
25
50
75
100
16/04/06 17/04/06 18/04/06 19/04/06 20/04/06 21/04/06 22/04/06
MW
Raise Reg Raise 5min Raise 60sec Raise 6sec
Figure 64: lower requirements
0
50
100
150
200
16/04/06 17/04/06 18/04/06 19/04/06 20/04/06 21/04/06 22/04/06
MW
Lower Reg Lower 5min Lower 60sec Lower 6sec
Figure 64A: lower requirements - Tasmania
0
50
100
150
200
250
16/04/06 17/04/06 18/04/06 19/04/06 20/04/06 21/04/06 22/04/06
MW
Lower Reg Lower 5min Lower 60sec Lower 6sec
Australian Energy Regulator May 2006