ISO 21500 - 2010
Guide to Project Management
Presentation to the Australian Computer Society
19 March 2008
James Thomson ± Standards Australia
Neville Turbit ± MB12 Project Management, Committee member
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 2/28
ISO 21500 - Guide to Project Management
SA/AS/ISO/IS and all that!
An Australian Standard for projectmanagement?
An International Standard for project
management
Introducing ISO 21500 (NT)
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 3/28
SA/AS/ISO/IS and all that!
SA = Standards Australia ± since 1922
AS = Australian Standard ± all about a process
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 4/28
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 5/28
SA/AS/ISO/IS and all that!
SA = Standards Australia ± since 1922
AS = Australian Standard ± all about a process
ISO = isos Greek for ³equal´
IS = International Standard
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 6/28
An Australian Standard for project
management (terminology) ³isn¶t there a Standard for project management
being developed?´
³what should be covered in a Standard?´
³who should be involved in the development?´
³guys we seem to be bogged down!´
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 7/28
An International Standard for project
management The UK proposal
Six questions from Australia
Project managing a Standard on project
management
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 8/28
MB 012 Project ManagementMirror Committee
Chair Neveen MoussaD/Chair Lloyd Carter
P/Manager James Thomson
Working Group 1(WG 1)
Terminology15 SME from all sectors
Working Group 2(WG 2)
Processes15 SME from all sectors
Working Group 3(WG 3)
Informative Guidance15 SME from all sectors
Chairperson¶s Advisory Group(CAG)
Committee Chair, Deputy Chair,Project Manager, WG Coveners
Research Assistant, Admin supportOther experts
Construction ± Buildings
Construction ± Infrastructure
DefenceIT
Mining/MineralsOil & Gas/Energy
Finance/Banking/InsuranceGovt (Federal/State/Local)
ManufacturingPharmaceuticals
Education/TrainingR&D
Other
Construction ±
BuildingsConstruction ± Infrastructure
DefenceIT
Mining/MineralsOil & Gas/Energy
Finance/Banking/InsuranceGovt (Federal/State/Local)
ManufacturingPharmaceuticals
Education/Training
R&DOther
Construction ± Buildings
Construction ± Infrastructure
DefenceIT
Mining/MineralsOil & Gas/Energy
Finance/Banking/InsuranceGovt (Federal/State/Local)
ManufacturingPharmaceuticals
Education/TrainingR&D
Other
Public Consultation Panel (PCP)[email protected]
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 9/28
An International Standard for project
management The UK proposal
Six questions from Australia
Project managing a Standard on project
management
Timeline
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 10/28
Introducing ISO 21500 (NT)
The drivers
What it means to you
Starting positions
London resolutions Structure of the International Standard
Example
Format for process definition
Inputs ± methodologies ± outputs Example processes
What will you have to do ~
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 11/28
ISO Standard ± The Drivers
± More international projects
± Contractual issues ± Develop a common terminology
± Alignment of other standards PMBOK,
BS 6079-1:2002, German Standard etc. ~
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 12/28
What it means to You
± Understand the ISO standard when working on
projects (contractual, best practice issues)
± Changed terminology
± Industry standard practices
± Potentially skills/qualifications ~
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 13/28
Starting Positions ± USA - recommended focus on projects, focus on
processes (what not how), generic overarchingstandard using best of all existing BOK¶s
± UK ± recommended the use of BS 6079-1:2002as the basis for document, generic overarchingstandard, question of when does a project start(corporate aspects).
± Germany ± Focus on processes, the concept of the house of processes. ~
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 14/28
Starting Positions (cont)
± France - The PM corpus concept, proposal for a4th WG on competencies.
± Japan ± proposal to include education andtraining of personnel for project management inthe work items of WG3, established mirror committee and working groups with membersselected and funding sourced..
± Netherland ± program/portfolio management inor out, generic vs sector specific. ~
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 15/28
London Resolutions
Accept the document ISO/PC 236 N0008(ANSI/PMI 99-001-2004 Glossary) as base
document for initiating the work of the WorkingGroup #1
Revision to scope of working group 2 and contentof their contribution to Standard.
Wording of first working draft of the scopestatement of the Standard ~
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 16/28
London Resolutions (cont)
Create a draft for an annex containingrequirements and recommendations about the
competencies in project management.
Introduce in a summary form, as part of thestructure of the future standard, a paragraph inrelation to "skills and competencies in project
management". This paragraph will define themain characteristics of project managementcompetencies, and will include a reference to the
Annex ~
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 17/28
Structure of the Standard
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 18/28
Structure of the Standard
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 19/28
Structure of the Standard
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 20/28
Example
Contractor OrganizationThe customer organization is responsible for specifying the
purpose of the project and the conditions for the
execution of a project and should ensure adequate
funding and the form of contract. The project specificationshould contain the following:
the description of context into which the purpose of the
project will be incorporated
the functionalities of this purpose
the technical solutions required
the budget
the execution time
the master quality plan
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 21/28
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 22/28
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 23/28
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 24/28
Inputs ± Methodologies - Outputs
Inputs
Project Scope Statement
Change Control System Project Scope Statement Updates
Methodologies
Work Breakdown Structure Variance Analysis
Work Breakdown Structure Updates ~
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 25/28
Inputs ± Methodologies - Outputs
Methodologies (cont)
Scope Management Plan
Re-planning
Scope Management Plan Updates
Outputs
Approved Change Requests
Configuration Management
Project Management Plan Updates
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 26/28
Example Processes
1.1 Develop Project Charter
1.2 Develop Preliminary Project Scope Statement
2.1 Scope Definition
2.2 Scope Planning
2.3 Create Work Breakdown Structure
2.4 Activity Definition
2.5 Activity Resource Estimating
2.6 Activity Duration Estimating
2.7 Determine Activity Sequencing
2.8 Develop Project Schedule
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 27/28
What will you have to do?
± Adapt to new terminology
± Change roles and responsibilities
± Follow the standard processes
± Understand legal implications
8/8/2019 2008_03_19_ACS_Presentation_v4-1
http://slidepdf.com/reader/full/20080319acspresentationv4-1 28/28
Questions?