Page 1: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR

2009 CONTRACTOR –ENGINEER CONFERENCE

““Environmental Responsibilities Environmental Responsibilities in Construction”in Construction”

Dan Scudder – WI DOT

Cameron Bump – WI DNR

Page 2: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR

ManyMany Environmental Responsibilities Environmental Responsibilities

For Construction Projects …

fugitive dust

brush burning

construction equip emissions

erosion control

storm water mgt

spill prevention & control

404 permits

401 WQ certification

GW well abandonment

noise control/impacts

invasive species trnsp

endangered species

borrow site impacts

waste mtl disposal

archeological resources

Page 3: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR

ManyMany Environmental Responsibilities Environmental Responsibilities

For Construction Projects …

fugitive dust

brush burning

construction equip emissions

erosion control

storm water mgt

spill prevention & control

404 permits

401 WQ certification

GW well abandonment

noise control/impacts

invasive species trnsp

endangered species

borrow site impacts

waste mtl disposal

archeological resources

Page 4: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR

ManyMany Environmental Responsibilities Environmental Responsibilities

For Construction Projects …

fugitive dust

brush burning

construction equip emissions

erosion control

storm water mgt

spill prevention & control

404 permits

401 WQ certification

GW well abandonment

noise control/impacts

invasive species trnsp

endangered species

borrow site impacts

waste mtl disposal

archeological resources

Page 5: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR

Noise controlStormwater mgt

Erosion control

Brush burning

404 Permit 401 WQ Certification

Endangered species

Constr. Equipment emissions

Invasive species transport

Waste mtl disposal

Borrow site approval

Fugitive dust

archeology

Spill prevention

ManyMany Environmental Responsibilities Environmental Responsibilities

For Construction Projects …

GW well abandonment

Page 6: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR

Noise controlStormwater mgt

Erosion control

Brush burning

404 Permit 401 WQ Certification

Endangered species

Constr Equipment emissions

Invasive species transport

Waste mtl disposal

Borrow site approval

Fugitive dust

archeology

Spill prevention

For Construction Projects …

GW well abandonment

ManyMany Environmental Responsibilities Environmental Responsibilities

Mange them better by…

Pre-Bid: • Understand Federal and State Requirements• Anticipate costs, effort, and timing impacts

Pre-Construction:• Review documents and identify efforts needed• Assign responsibilities & develop tools (checklists?)• Establish team coordination and communication

During Construction:• Implement – communicate – coordinate• Seek guidance or assistance when unsure

Page 7: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR

http://www.epa.gov/compliance/resources/publications/http://www.epa.gov/compliance/resources/publications/assistance/sectors/constructmyer/myerguide.pdfassistance/sectors/constructmyer/myerguide.pdf

US EPA’s construction

site environmental

guide

or

http://www.cicacenter.org/linkshttp://www.cicacenter.org/links

(Construction Industry Compliance (Construction Industry Compliance Assistance Center)Assistance Center)

Page 8: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR

US EPA Planning Guide Document

Page 9: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR

Construction Site Responsibilities --

Everyone needs to be involved!!

- WisDOT – Consultant – Contractor(s) -

Understand our responsibilities

Identify requirements and commitments

Apply/obtain Permits (or permit mods) and certifications

Site inspections, reviews, and corrections

Coordination and negotiation with agencies and utilities

Communication – internal and external

Reporting requirements (internal and external)

etc, etc, etc …

Compliance on WisDOT’s project sites is a shared responsibility!

Page 10: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR
Page 11: 2009 CONTRACTOR –ENGINEER CONFERENCE “Environmental Responsibilities in Construction” Dan Scudder – WI DOT Cameron Bump – WI DNR

“It is easy to dodge our responsibilities, but we cannot dodge the consequences of dodging our responsibilities.”

-- Josiah Stamp

Remember …

Environmental non-compliance represents a substantial risk to

your business! wasted time, effort, and $$

damaged reputations

additional scrutiny/oversight