2010 COST DATA
CONSTRUCTION
TABLE OF CONTENTS
BRIDGE COSTS PER SQUARE FOOT
INDEX & AVG UNIT PRICES
ITEM UNIT COSTS
PROJECT BID (JANUARY-SEPTEMBER 2010)
A di A 2010 C t ti T P j t *
8/8/2019 2010 CDOT construction cost data book
2/527
Appendix A 2010 Construction Type Projects *
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 1
2010 Cost Data
BRIDGE COST PER SQUARE FOOT
(01/01/10 THROUGH 09/30/10)
------------------------------------------------------------------------------------------------------------------------------------
PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER
DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT
------------------------------------------------------------------------------------------------------------------------------------
BRIDGE REPAIR
100204 IM 0703-352 M
I-70 WEST EJMT TO BAKERVILLE 144.0000 44.5000 6408.0 $32,543 $5.08
F-13-J 144.0000 44.5000 6408.0 $33,263 $5.19
F-13-O 292.0000 42.7500 12483.0 $113,748 $9.11
F-13-P 277.0000 41.0000 11357.0 $67,330 $5.93
F-13-T 216.0000 36.5000 7884.0 $140,412 $17.81
100218 ES20504-060 R
US 50B: EAST OF JCT 96 TO HUER K-19-U 306.0000 30.0000 9180.0 $184,179 $20.06
K-19-Q 306.0000 30.0000 9180.0 $89,920 $9.80
L-19-H 406.0000 32.0000 12992.0 $87,121 $6.71
100318 STA0853-065 U
ON US 85 IN WELD COUNTY C-18-BL 303.0000 30.0000 9090.0 $177,218 $19.50
C-18-BM 307.0000 30.0000 9210.0 $180,673 $19.62
C-18-BK 344.0000 30.0000 10320.0 $174,442 $16.90
100325 STA157A-010 R
SH 157A IN BOULDER COUNTY E-16-HX 185.0000 50.0000 9250.0 $107,416 $11.61
E-16-HY 153.0000 42.0000 6426.0 $52,138 $8.11
D-16-CX 152.0000 100.0000 15200.0 $30,347 $2.00
D-16-CV 185.0000 88.0000 16280.0 $35,834 $2.20
D-16-CU 154.0000 70.0000 10780.0 $117,478 $10.90
100708 C025A-011 U
I-25/SANTA FE F-16-DT F-16-DT 337.0000 52.0000 17524.0 $147,319 $8.41
WEIGHTED AVERAGE COST:
NEW STRUCTURES 179972.0 $1,771,381 $9.84
BRIDGE DECK REPLACEMENT
100708 FBR0242-047 M
US 24 AT MILE MARKER 270.8 AND I-15-Y 52.8000 35.0000 1848.0 $1,961,700 $1,061.53
WEIGHTED AVERAGE COST:
NEW STRUCTURES 1848.0 $1,961,700 $1,061.53
CONCRETE SLAB AND GIRDER
100701 ES4 0853-072 R
SH 85 WYOMING SOUTH-STRUCTURES A-17-W 69.0000 30.0000 2070.0 $27,638 $13.35
100923 ES1 0705-078 P
I-70, AGATE TO KANSAS BORDER G-28-H 94.0000 38.5000 3619.0 $4,484 $1.24
8/8/2019 2010 CDOT construction cost data book
3/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2
2010 Cost Data
BRIDGE COST PER SQUARE FOOT
(01/01/10 THROUGH 09/30/10)
------------------------------------------------------------------------------------------------------------------------------------
PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER
DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT
------------------------------------------------------------------------------------------------------------------------------------
G-28-L 94.0000 38.5000 3619.0 $17,884 $4.94
G-28-N 94.0000 38.5000 3619.0 $13,484 $3.73
G-28-O 95.0000 38.5000 3657.5 $17,884 $4.89
G-28-K 94.0000 38.5000 3619.0 $17,884 $4.94
G-28-M 93.0000 38.5000 3580.5 $17,884 $4.99
100930 STA 119A-051 M
SH 119 FROM SOUTH BLACK HAWK C E-15-AM 446.0000 81.0000 36126.0 $3,363,175 $93.10
WEIGHTED AVERAGE COST:
NEW STRUCTURES 59910.0 $3,480,317 $58.09
PRESTRES GIRDER (BOX SECTION)
100318 FBR 069A-026 L
0.5 MILES S/O THE TOWN OF FARI N-16-Q 106.0000 43.0000 4558.0 $711,639 $156.13
WEIGHTED AVERAGE COST:
NEW STRUCTURES 4558.0 $711,639 $156.13
MAJOR STRUCTURE CBC OR PIPES
100701 ES4 0853-072 R
SH 85 WYOMING SOUTH-STRUCTURES A-17-X 39.3300 90.0000 3539.7 $299,458 $84.60
A-17-Y 34.5000 90.0000 3105.0 $304,219 $97.98
WEIGHTED AVERAGE COST:
NEW STRUCTURES 6644.7 $603,677 $90.85
ROLLED STEEL GIRDER
100610 FBR5502-068 M
US 550 ON RED MOUNTAIN PASS SO P-05-B 86.6700 39.0000 3380.1 $1,399,722 $414.10
WEIGHTED AVERAGE COST:NEW STRUCTURES 3380.1 $1,399,722 $414.10
TIMBER BRIDGE (GLUELAM)
100603 FBR138A-008 P
REGION 4 VARIOUS LOCATIONS A-24-C 38.0000 28.0000 1064.0 $65,937 $61.97
WEIGHTED AVERAGE COST:
NEW STRUCTURES 1064.0 $65,937 $61.97
PEDESTRIAN OR BIKEWAY BRIDGE
100930 STA 119A-051 M
SH 119 FROM SOUTH BLACK HAWK C E15-AN 142.5000 10.0000 1425.0 $260,150 $182.56WEIGHTED AVERAGE COST:
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2
2010 Cost Data
BRIDGE COST PER SQUARE FOOT
(01/01/10 THROUGH 09/30/10)
------------------------------------------------------------------------------------------------------------------------------------
PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER
DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT
------------------------------------------------------------------------------------------------------------------------------------
G-28-L 94.0000 38.5000 3619.0 $17,884 $4.94
G-28-N 94.0000 38.5000 3619.0 $13,484 $3.73
G-28-O 95.0000 38.5000 3657.5 $17,884 $4.89
G-28-K 94.0000 38.5000 3619.0 $17,884 $4.94
G-28-M 93.0000 38.5000 3580.5 $17,884 $4.99
100930 STA 119A-051 M
SH 119 FROM SOUTH BLACK HAWK C E-15-AM 446.0000 81.0000 36126.0 $3,363,175 $93.10
WEIGHTED AVERAGE COST:
NEW STRUCTURES 59910.0 $3,480,317 $58.09
PRESTRES GIRDER (BOX SECTION)
100318 FBR 069A-026 L
0.5 MILES S/O THE TOWN OF FARI N-16-Q 106.0000 43.0000 4558.0 $711,639 $156.13
WEIGHTED AVERAGE COST:
NEW STRUCTURES 4558.0 $711,639 $156.13
MAJOR STRUCTURE CBC OR PIPES
100701 ES4 0853-072 R
SH 85 WYOMING SOUTH-STRUCTURES A-17-X 39.3300 90.0000 3539.7 $299,458 $84.60
A-17-Y 34.5000 90.0000 3105.0 $304,219 $97.98
WEIGHTED AVERAGE COST:
NEW STRUCTURES 6644.7 $603,677 $90.85
ROLLED STEEL GIRDER
100610 FBR5502-068 M
US 550 ON RED MOUNTAIN PASS SO P-05-B 86.6700 39.0000 3380.1 $1,399,722 $414.10
WEIGHTED AVERAGE COST:NEW STRUCTURES 3380.1 $1,399,722 $414.10
TIMBER BRIDGE (GLUELAM)
100603 FBR138A-008 P
REGION 4 VARIOUS LOCATIONS A-24-C 38.0000 28.0000 1064.0 $65,937 $61.97
WEIGHTED AVERAGE COST:
NEW STRUCTURES 1064.0 $65,937 $61.97
PEDESTRIAN OR BIKEWAY BRIDGE
100930 STA 119A-051 M
SH 119 FROM SOUTH BLACK HAWK C E15-AN 142.5000 10.0000 1425.0 $260,150 $182.56WEIGHTED AVERAGE COST:
NEW STRUCTURES 1425.0 $260,150 $182.56
8/8/2019 2010 CDOT construction cost data book
4/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3
2010 Cost Data
BRIDGE COST PER SQUARE FOOT
(01/01/10 THROUGH 09/30/10)
------------------------------------------------------------------------------------------------------------------------------------
PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER
DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT
------------------------------------------------------------------------------------------------------------------------------------
MISCELLANEOUS
100318 ES6 0852-103 - CONCRETE ALT R
US 85 / C-470 INTERCHANGE (STA F-16_YE, F-16-WY 1728.8300 33.0000 57051.4 $5,441,000 $95.37
100401 BR M356-022 U
80TH OVER US36 ON WESTMINISTER 0.0000 0.0000 0.0 $2,630,306
100603 FBR138A-008 P
REGION 4 VARIOUS LOCATIONS A-26-F 0.0000 0.0000 0.0 $79,808
100624 FBR 0703-357 M
STR. F-14-AZ WEST OF IDAHO SPR F-14-AZ 125.0000 40.0000 5000.0 $852,484 $170.50
WEIGHTED AVERAGE COST:
NEW STRUCTURES 62051.4 $9,003,597 $145.10
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3
2010 Cost Data
BRIDGE COST PER SQUARE FOOT
(01/01/10 THROUGH 09/30/10)
------------------------------------------------------------------------------------------------------------------------------------
PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER
DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT
------------------------------------------------------------------------------------------------------------------------------------
MISCELLANEOUS
100318 ES6 0852-103 - CONCRETE ALT R
US 85 / C-470 INTERCHANGE (STA F-16_YE, F-16-WY 1728.8300 33.0000 57051.4 $5,441,000 $95.37
100401 BR M356-022 U
80TH OVER US36 ON WESTMINISTER 0.0000 0.0000 0.0 $2,630,306
100603 FBR138A-008 P
REGION 4 VARIOUS LOCATIONS A-26-F 0.0000 0.0000 0.0 $79,808
100624 FBR 0703-357 M
STR. F-14-AZ WEST OF IDAHO SPR F-14-AZ 125.0000 40.0000 5000.0 $852,484 $170.50
WEIGHTED AVERAGE COST:
NEW STRUCTURES 62051.4 $9,003,597 $145.10
8/8/2019 2010 CDOT construction cost data book
5/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 12010 Cost Data
INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE
------------------------------------------------------------------------------------------------------------------------------------
201-00000 Clearing and Grubbing 17 Lump Sum 387,398.81 22,788.17
201-00001 Clearing and Grubbing 81 Acre 128,921.50 1,591.62
201-00002 Clearing 1 Lump Sum 4,800.00 4,800.00
201-00005 Removal of Debris 5 Lump Sum 28,141.16 5,628.23
202-00000 Removal of Structures and Obstructions 3 Lump Sum 13,454.00 4,484.67
202-00001 Removal of Structure 53 Each 70,891.00 1,337.57
202-00003 Removal of Structure (Special) 1 Lump Sum 3,000.00 3,000.00
202-00008 Tree Trimming 140 Hour 12,417.00 88.69
202-00010 Removal of Tree 215 Each 70,317.92 327.06
202-00015 Removal of Headwall 11 Each 8,150.00 740.91
202-00019 Removal of Inlet 85 Each 41,091.74 483.43
202-00020 Removal of Concrete Box Culvert 1 Each 8,800.00 8,800.00
202-00021 Removal of Manhole 29 Each 11,529.14 397.56
202-00023 Removal of Embankment Protector Type 3 9 Each 3,175.00 352.78
202-00026 Removal of Slope and Ditch Paving 7,056 Sq Yard 41,803.51 5.92
202-00027 Removal of Riprap 139 Sq Yard 2,557.00 18.40
202-00031 Removal of Fire Hydrant 2 Each 1,400.00 700.00
202-00032 Removal of Valve 5 Each 2,000.00 400.00
202-00033 Removal of Pipe 265 Each 25,438.75 96.00
202-00035 Removal of Pipe 30,860 Lin Foot 484,453.44 15.70
202-00037 Removal of End Section 24 Each 5,933.63 247.23
202-00040 Removal of Electrical Conduit 1,600 Lin Foot 6,400.00 4.00
202-00090 Removal of Delineator 5,690 Each 32,395.67 5.69
202-00150 Removal of Wall 8 Each 10,560.00 1,320.00
202-00155 Removal of Wall 2,298 Lin Foot 39,302.00 17.10
202-00160 Removal of Wall 300 Sq Foot 12,300.00 41.00
202-00165 Removal of Wall 1 Lump Sum 22,000.00 22,000.00202-00170 Grinding And Texturing Concrete Pavement 638 Sq Yard 3,975.60 6.23
202-00190 Removal of Concrete Median Cover Material 12,610 Sq Yard 64,249.03 5.10
202-00195 Removal of Median Cover 4,278 Sq Yard 32,277.26 7.54
202-00200 Removal of Sidewalk 12,130 Sq Yard 83,115.05 6.85
202-00201 Removal of Curb 17,343 Lin Foot 54,741.42 3.16
202-00202 Removal of Gutter 198 Lin Foot 645.48 3.26
202-00203 Removal of Curb and Gutter 87,580 Lin Foot 358,266.07 4.09
202-00204 Removal of Curb, Gutter and Sidewalk 75 Lin Foot 487.50 6.50
202-00206 Removal of Concrete Curb Ramp 1,723 Sq Yard 26,430.11 15.34
202-00210 Removal of Concrete Pavement 101,498 Sq Yard 1,009,393.94 9.94
202-00212 Removal of Concrete Pavement 1,716 Sq Yard 15,083.64 8.79
8/8/2019 2010 CDOT construction cost data book
6/527
8/8/2019 2010 CDOT construction cost data book
7/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 1
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100107 INTERMOUNTAIN SLURRY SEAL, INC. 4 $1,453,413.00 86.81
ES4 0343-030 SH 34: BRUSH TO AKRON 4 P
20100114 AMERICAN CIVIL CONSTRUCTORS, INC. 11 $6,422,888.00 85.20
ES3 0702-297 I-70 EDWARDS INTERCHANGE 3 M
20100128 FOUR CORNERS MATERIALS 7 $5,293,814.51 87.98
ES51602-123 US 160 FLORIDA RIVER TO 1 MILE 5 R
20100128 KOLBE STRIPING INC. 6 $354,835.00 64.96
MTCER100-171 MTCE FY10 R1 STENCIL SOUTH 1 R
20100128 VILLALOBOS CONCRETE INC. 5 $2,059,265.97 83.22
NH 0821-088 SH 82 IN GARFIELD COUNTY MP 0. 3 M
20100128 COULSON EXCAVATING COMPANY 6 $436,930.00 87.99
STA2873-156 WEST OF SH 287 & LCR 17 INTERS 4 R
20100128 COULSON EXCAVATING COMPANY 5 $9,384,771.55 104.28
IM0253-210 I-25 RUBB NB & SB N OF LCR 36 4 R
20100204 ASPHALT SPECIALTIES CO., INC. 5 $2,955,811.15 88.62
IM 0703-352 I-70 WEST EJMT TO BAKERVILLE 1 M
20100204 LAFARGE NORTH AMERICA, INC 4 $6,051,601.78 95.28
IM0251-337 TRINIDAD - NORTH 2 R
20100204 DILLIE & KUHN, INC. 11 $561,154.86 78.62
MP0211-001 SH16A, SH21A, US24A, SH67D & U 2 R
20100204 APC SOUTHERN CONSTRUCTION COMPANY, LLC 7 $4,527,417.86 93.49
ES1 0243-079 US 24 WEST OF LIMON 1 P
20100211 BRANNAN SAND AND GRAVEL, LLC 6 $403,509.27 85.86
CCR600-330 CHATFIELD STATE PARK MAIN RD. 6 R
20100211 NCB, LLC 15 $332,453.00 71.47
ES1 2854-120 US 285 MM 172.3 1 M
20100218 LAFARGE NORTH AMERICA, INC 4 $2,801,243.94 100.39
ES4 0061-080 WASHINGTON AND LOGAN COUNTY 4 R
20100218 ROCKY MOUNTAIN MATERIALS & ASPHALT, INC. 6 $4,406,202.39 91.21
ES20504-060 US 50B: EAST OF JCT 96 TO HUER 2 R
20100225 LAFARGE NORTH AMERICA, INC 8 $4,608,918.98 79.04
ES30141-021 MP 0-23, JACKSON COUNTY, SH 14 3 M
20100225 LAFARGE NORTH AMERICA, INC 8 $3,332,949.85 80.20
ES30141-021 MP 0-23, JACKSON COUNTY, SH 14 3 M
8/8/2019 2010 CDOT construction cost data book
8/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100304 APC SOUTHERN CONSTRUCTION COMPANY, LLC 6 $5,165,043.41 98.73
ES5 1602-125 US 160 SHAW CREEK TO DEL NORTE 5 R
20100304 LAFARGE NORTH AMERICA, INC 6 $1,509,306.60 77.31
ES6 002A-003 SH 2, 62ND AVE. TO QUEBEC PARK 6 U
20100311 INTERFACE COMMUNICATIONS, COMPANY 4 $70,059.48 87.77
STAR400-249 SH 257 MP 9.558 AND SH 7B MP 5 4 R
20100311 KOLBE STRIPING INC. 4 $585,181.00 116.61
MPR200-172 SH287 A & B AND US50 B 2 P
20100318 LAFARGE NORTH AMERICA, INC 5 $3,299,328.29 92.90
STA0853-065 ON US 85 IN WELD COUNTY 4 U
20100318 STURGEON ELECTRIC COMPANY, INC 4 $577,954.00 101.16
C0703-356 I-70, EAST OF SILVERTHORN TO L 1 M
20100318 WALSENBURG SAND AND GRAVEL 7 $1,837,111.00 104.92
FBR 069A-026 0.5 MILES S/O THE TOWN OF FARI 2 L
20100318 EDWARD KRAEMER & SONS INC. 5 $17,172,771.47 31.38
ES6 0852-103 - CONCRETE ALT US 85 / C-470 INTERCHANGE (STA 6 R
ES6 0852-103 - DEFAULT ALT US 85 / C-470 INTERCHANGE (STA 6 R
ES6 0852-103 - STEEL ALT US 85 / C-470 INTERCHANGE (STA 6 R
20100318 FLATIRON CONSTRUCTORS, INC. 4 $620,830.00 84.08
ER 0702-307 I-70 MP 124-126 IN GARFIELD CO 3 M
20100325 BRANNAN SAND AND GRAVEL, LLC 6 $2,378,047.60 89.14
STA157A-010 SH 157A IN BOULDER COUNTY 4 R
20100401 STRUCTURES, INC. 8 $6,959,186.05 87.91
BR M356-022 80TH OVER US36 ON WESTMINISTER 6 U
20100401 LAFARGE NORTH AMERICA, INC 6 $3,808,889.81 92.81
NHC010-100 SH2, ALAMEDA TO MLK 6 U
20100401 SCHMIDT CONSTRUCTION COMPANY 3 $2,641,487.47 91.06
STA R200-167 SH 21 BRADLEY RD. TO N/O DRENN 2 R
20100401 STURGEON ELECTRIC COMPANY, INC 4 $122,513.00 90.87
C0703-355 I-70, EAST OF SILVER PLUME TO 1 M
20100401 UNITED COMPANIES OF MESA COUNTY 3 $849,450.25 94.45
STA 0241-054 SH 24 BATTLE MOUNTAIN CHIP SEA 3 M
20100408 LAFARGE NORTH AMERICA, INC 6 $2,662,412.20 88.57
STA2854-119 US 285 DEER CREEK TO RICHMOND 1 M
20100408 ELAM CONSTRUCTION, INC. 3 $3,529,926.50 95.92
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100304 APC SOUTHERN CONSTRUCTION COMPANY, LLC 6 $5,165,043.41 98.73
ES5 1602-125 US 160 SHAW CREEK TO DEL NORTE 5 R
20100304 LAFARGE NORTH AMERICA, INC 6 $1,509,306.60 77.31
ES6 002A-003 SH 2, 62ND AVE. TO QUEBEC PARK 6 U
20100311 INTERFACE COMMUNICATIONS, COMPANY 4 $70,059.48 87.77
STAR400-249 SH 257 MP 9.558 AND SH 7B MP 5 4 R
20100311 KOLBE STRIPING INC. 4 $585,181.00 116.61
MPR200-172 SH287 A & B AND US50 B 2 P
20100318 LAFARGE NORTH AMERICA, INC 5 $3,299,328.29 92.90
STA0853-065 ON US 85 IN WELD COUNTY 4 U
20100318 STURGEON ELECTRIC COMPANY, INC 4 $577,954.00 101.16
C0703-356 I-70, EAST OF SILVERTHORN TO L 1 M
20100318 WALSENBURG SAND AND GRAVEL 7 $1,837,111.00 104.92
FBR 069A-026 0.5 MILES S/O THE TOWN OF FARI 2 L
20100318 EDWARD KRAEMER & SONS INC. 5 $17,172,771.47 31.38
ES6 0852-103 - CONCRETE ALT US 85 / C-470 INTERCHANGE (STA 6 R
ES6 0852-103 - DEFAULT ALT US 85 / C-470 INTERCHANGE (STA 6 R
ES6 0852-103 - STEEL ALT US 85 / C-470 INTERCHANGE (STA 6 R
20100318 FLATIRON CONSTRUCTORS, INC. 4 $620,830.00 84.08
ER 0702-307 I-70 MP 124-126 IN GARFIELD CO 3 M
20100325 BRANNAN SAND AND GRAVEL, LLC 6 $2,378,047.60 89.14
STA157A-010 SH 157A IN BOULDER COUNTY 4 R
20100401 STRUCTURES, INC. 8 $6,959,186.05 87.91
BR M356-022 80TH OVER US36 ON WESTMINISTER 6 U
20100401 LAFARGE NORTH AMERICA, INC 6 $3,808,889.81 92.81
NHC010-100 SH2, ALAMEDA TO MLK 6 U
20100401 SCHMIDT CONSTRUCTION COMPANY 3 $2,641,487.47 91.06
STA R200-167 SH 21 BRADLEY RD. TO N/O DRENN 2 R
20100401 STURGEON ELECTRIC COMPANY, INC 4 $122,513.00 90.87
C0703-355 I-70, EAST OF SILVER PLUME TO 1 M
20100401 UNITED COMPANIES OF MESA COUNTY 3 $849,450.25 94.45
STA 0241-054 SH 24 BATTLE MOUNTAIN CHIP SEA 3 M
20100408 LAFARGE NORTH AMERICA, INC 6 $2,662,412.20 88.57
STA2854-119 US 285 DEER CREEK TO RICHMOND 1 M
20100408 ELAM CONSTRUCTION, INC. 3 $3,529,926.50 95.92
NH5502-067 US 550 NORTH OF DURANGO ON MOL 5 M
8/8/2019 2010 CDOT construction cost data book
9/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100408 BRANNAN SAND AND GRAVEL, LLC 4 $4,268,360.97 80.01
IM0253-211 I-25 NB AND SB AT WCR 32 4 L
20100415 HAMON CONTRACTORS, INC. 6 $16,421,806.87 87.37
STU 0831-107 PARKER RD (SH 83) AND ARAPAHOE 6 U
20100415 ZAK DIRT, INC. 7 $2,894,701.75 80.23
NH 2873-157 SH 287:BROOMFIELD TO LAFAYETTE 6 R
20100415 CRUZ CONSTRUCTION, INC. 7 $427,135.50 77.01
C0761-205 I-76 NORTH OF WCR 8 IN WELD CO 4 L
20100422 INTERMOUNTAIN SLURRY SEAL, INC. 4 $588,793.08 96.40
NH 1603-026 US 160 FORT GARLAND EAST 5 R
20100422 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $805,394.81 94.32
IM0704-219 I70 WEST OF SIEBERT - EAST 1 P
20100422 INTERFACE COMMUNICATIONS, COMPANY 2 $182,171.81 102.14
C3921-011 SH 392 AND CR 31 INTERSECTION 4 R
20100422 W.L. CONTRACTORS, INC. 3 $218,837.75 94.92
C0931-028 INTERSECTION OF SH 93 AND SH 1 4 R
20100429 INTERSTATE HIGHWAY CONSTRUCTION 6 $20,293,515.37 95.34
IM 2254-074 I-225: MISSISSIPPI TO 2ND AVE 6 U
20100429 ARROW ELECTRIC SERVICE, INC. 6 $415,249.90 95.47
SHE045A-008 SH45(PUEBLO BLVD.) AND GOODNIG 2 U
20100429 LAFARGE NORTH AMERICA, INC 5 $5,399,788.69 83.49
IM0252-406 ON I-25 1 MI. S. OF PUEBLO THR 2 U
20100506 CASTLE ROCK CONST. CO. OF COLO, LLC 4 $10,000,000.00 101.76
NH R100-131 HUGO-EAST 1 P
20100506 MIDWEST ROCKFALL, INC. 5 $1,012,145.00 82.87
STA145A-044 SH 145 ON NORWOOD HILL IN SAN 5 M
20100506 MOUNTAIN CONSTRUCTORS, INC. 6 $484,338.95 110.26
SHE2873-152 1.5 MILES WEST OF I-25 IN LARI 4 R
20100506 OLDCASTLE SW GROUP, INC. 5 $1,283,923.65 88.75
NH0402-078 US40&SH131 GRAND&ROUTT COUNTIE 3 M
20100513 COLORADO BORING. CO. 8 $294,642.88 59.04
STAR600-359 SH 7, SH 72, SH 177, SH 287 6 L
20100513 PAVETEC, INC. 4 $3,915,572.76 100.33
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100408 BRANNAN SAND AND GRAVEL, LLC 4 $4,268,360.97 80.01
IM0253-211 I-25 NB AND SB AT WCR 32 4 L
20100415 HAMON CONTRACTORS, INC. 6 $16,421,806.87 87.37
STU 0831-107 PARKER RD (SH 83) AND ARAPAHOE 6 U
20100415 ZAK DIRT, INC. 7 $2,894,701.75 80.23
NH 2873-157 SH 287:BROOMFIELD TO LAFAYETTE 6 R
20100415 CRUZ CONSTRUCTION, INC. 7 $427,135.50 77.01
C0761-205 I-76 NORTH OF WCR 8 IN WELD CO 4 L
20100422 INTERMOUNTAIN SLURRY SEAL, INC. 4 $588,793.08 96.40
NH 1603-026 US 160 FORT GARLAND EAST 5 R
20100422 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $805,394.81 94.32
IM0704-219 I70 WEST OF SIEBERT - EAST 1 P
20100422 INTERFACE COMMUNICATIONS, COMPANY 2 $182,171.81 102.14
C3921-011 SH 392 AND CR 31 INTERSECTION 4 R
20100422 W.L. CONTRACTORS, INC. 3 $218,837.75 94.92
C0931-028 INTERSECTION OF SH 93 AND SH 1 4 R
20100429 INTERSTATE HIGHWAY CONSTRUCTION 6 $20,293,515.37 95.34
IM 2254-074 I-225: MISSISSIPPI TO 2ND AVE 6 U
20100429 ARROW ELECTRIC SERVICE, INC. 6 $415,249.90 95.47
SHE045A-008 SH45(PUEBLO BLVD.) AND GOODNIG 2 U
20100429 LAFARGE NORTH AMERICA, INC 5 $5,399,788.69 83.49
IM0252-406 ON I-25 1 MI. S. OF PUEBLO THR 2 U
20100506 CASTLE ROCK CONST. CO. OF COLO, LLC 4 $10,000,000.00 101.76
NH R100-131 HUGO-EAST 1 P
20100506 MIDWEST ROCKFALL, INC. 5 $1,012,145.00 82.87
STA145A-044 SH 145 ON NORWOOD HILL IN SAN 5 M
20100506 MOUNTAIN CONSTRUCTORS, INC. 6 $484,338.95 110.26
SHE2873-152 1.5 MILES WEST OF I-25 IN LARI 4 R
20100506 OLDCASTLE SW GROUP, INC. 5 $1,283,923.65 88.75
NH0402-078 US40&SH131 GRAND&ROUTT COUNTIE 3 M
20100513 COLORADO BORING. CO. 8 $294,642.88 59.04
STAR600-359 SH 7, SH 72, SH 177, SH 287 6 L
20100513 PAVETEC, INC. 4 $3,915,572.76 100.33
NH 2851-005 US 285 LA JARA TO ALAMOSA 5 R
8/8/2019 2010 CDOT construction cost data book
10/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 4
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100513 ASPHALT SPECIALTIES CO., INC. 7 $507,335.30 111.74
SHE085A-011 US 85 & 144TH AVENUE INTERSECT 6 R
20100513 OLDCASTLE SW GROUP, INC. 8 $1,398,999.00 97.47
C0701-205 I-70 EXIT 37 MESA COUNTY 3 L
20100513 WATERFORD CORPORATION 3 $1,128,603.25 103.66
C 0821-091 SH 82 MP 10-16 3 M
20100520 W.L. CONTRACTORS, INC. 5 $236,502.80 98.00
SHE0821-089 SH82 @ BRUSH CK. SIGNAL IMPROV 3 R
20100520 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $4,859,868.06 93.35
NH 1603-028 US 160 MP 240.3 E TO FT GARLAN 5 P
20100527 ZAK DIRT, INC. 11 $649,545.50 96.79
STA1381-006 US 138 EAST OF STERLING 4 P
20100527 LAFARGE NORTH AMERICA, INC 3 $4,343,627.51 96.76
STA0362-029 US 36 KANSAS STATE LINE WEST ( 4 P
20100527 LAWSON CONSTRUCTION COMPANY 3 $8,237,445.21 112.28
NH0701-202 I-70B WIDENING EAST OF 24 ROAD 3 U
20100527 CONTRACT MANAGEMENT, INC. dba US ROADS 4 $303,303.00 94.80
NH050A-012 SANTA FE AT ILEX IN PUEBLO 2 U
20100527 EARTH CONTRACTORS, INC 5 $147,800.00 73.28
NH 0841-007 2 MI NORTH OF NM STATE LINE ON 5 M
20100603 ZAK DIRT, INC. 4 $593,177.45 112.76
FBR138A-008 REGION 4 VARIOUS LOCATIONS 4 P
20100610 ALERT TRAFFIC CONTROL, INC. 5 $123,642.50 74.54
BR1602-126 US 550/160 SOUTH OF DURANGO AT 5 M
20100610 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $3,491,481.00 92.29
FBR5502-068 US 550 ON RED MOUNTAIN PASS SO 5 M
20100610 INTERFACE COMMUNICATIONS, COMPANY 5 $172,629.84 91.48
C056A-004 SH 56 AND 4TH ST IN BERTHOUD 4 R
20100610 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $2,834,922.00 110.73
IM0704-221 I-70 FROM WEST OF COLORADO BLV 6 U
20100610 COLORADO CONSTRUCTORS, INC. 8 $2,040,049.60 99.40
IM0703-358 8 MILES EAST MILE MARKER 205.5 1 M
20100617 APC CONSTRUCTION CO., LLC 5 $830,035.85 94.24
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 4
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100513 ASPHALT SPECIALTIES CO., INC. 7 $507,335.30 111.74
SHE085A-011 US 85 & 144TH AVENUE INTERSECT 6 R
20100513 OLDCASTLE SW GROUP, INC. 8 $1,398,999.00 97.47
C0701-205 I-70 EXIT 37 MESA COUNTY 3 L
20100513 WATERFORD CORPORATION 3 $1,128,603.25 103.66
C 0821-091 SH 82 MP 10-16 3 M
20100520 W.L. CONTRACTORS, INC. 5 $236,502.80 98.00
SHE0821-089 SH82 @ BRUSH CK. SIGNAL IMPROV 3 R
20100520 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $4,859,868.06 93.35
NH 1603-028 US 160 MP 240.3 E TO FT GARLAN 5 P
20100527 ZAK DIRT, INC. 11 $649,545.50 96.79
STA1381-006 US 138 EAST OF STERLING 4 P
20100527 LAFARGE NORTH AMERICA, INC 3 $4,343,627.51 96.76
STA0362-029 US 36 KANSAS STATE LINE WEST ( 4 P
20100527 LAWSON CONSTRUCTION COMPANY 3 $8,237,445.21 112.28
NH0701-202 I-70B WIDENING EAST OF 24 ROAD 3 U
20100527 CONTRACT MANAGEMENT, INC. dba US ROADS 4 $303,303.00 94.80
NH050A-012 SANTA FE AT ILEX IN PUEBLO 2 U
20100527 EARTH CONTRACTORS, INC 5 $147,800.00 73.28
NH 0841-007 2 MI NORTH OF NM STATE LINE ON 5 M
20100603 ZAK DIRT, INC. 4 $593,177.45 112.76
FBR138A-008 REGION 4 VARIOUS LOCATIONS 4 P
20100610 ALERT TRAFFIC CONTROL, INC. 5 $123,642.50 74.54
BR1602-126 US 550/160 SOUTH OF DURANGO AT 5 M
20100610 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $3,491,481.00 92.29
FBR5502-068 US 550 ON RED MOUNTAIN PASS SO 5 M
20100610 INTERFACE COMMUNICATIONS, COMPANY 5 $172,629.84 91.48
C056A-004 SH 56 AND 4TH ST IN BERTHOUD 4 R
20100610 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $2,834,922.00 110.73
IM0704-221 I-70 FROM WEST OF COLORADO BLV 6 U
20100610 COLORADO CONSTRUCTORS, INC. 8 $2,040,049.60 99.40
IM0703-358 8 MILES EAST MILE MARKER 205.5 1 M
20100617 APC CONSTRUCTION CO., LLC 5 $830,035.85 94.24
STA128A-005 SH128: MCCASLIN TO ELDORADO 6 R
8/8/2019 2010 CDOT construction cost data book
11/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 5
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100617 APC CONSTRUCTION CO., LLC 5 $715,892.15 91.61
STA072A-032 5.4 MILES WEST OF SH 93 ON SH 1 R
20100617 TONY J. BELTRAMO & SONS, INC. 6 $432,535.05 96.05
SHE0504-059 SH50B AT BONFORTE BLVD. IN PUE 2 U
20100617 DIAMOND SURFACE, INC. 8 $1,112,535.62 134.23
IM 0762-046 I-76, BRUSH TO STERLING 4 R
20100617 K.E.C.I. COLORADO, INC. 2 $934,987.00 122.36
SHE R100-175 US 6 (MP 259), SH 9 (MP 109), 1
20100624 STRUCTURES, INC. 7 $2,908,694.00 84.47
FBR096A-039 SH 96: WEST OF HASWELL 2 P
20100624 SEMA CONSTRUCTION, INC. 4 $1,524,680.50 108.89
FBR 0703-357 STR. F-14-AZ WEST OF IDAHO SPR 1 M
20100701 CONNELL RESOURCES, INC. 5 $6,373,187.25 102.72
ES4 0853-072 SH 85 WYOMING SOUTH-STRUCTURES 4 R
20100701 BRANNAN SAND AND GRAVEL, LLC 4 $1,719,481.25 109.96
STA2854-118 US 285 TURKEY CREEK CANYON 1 M
20100708 MOUNTAIN CONSTRUCTORS, INC. 5 $543,250.87 100.65
SHE0073-008 SH7 AT YORK ST 6 P
20100708 NEW DESIGN CONSTRUCTION CO. 6 $2,238,350.22 101.13
SHE4701-120 C-470 ACRES G TO I-25 MEDIAN C 6 R
20100708 SEMA CONSTRUCTION, INC. 1 $2,006,630.00 84.22
FBR0242-047 US 24 AT MILE MARKER 270.8 AND 2 M
20100708 STRUCTURES, INC. 5 $271,164.00 88.88
C025A-011 I-25/SANTA FE F-16-DT 6 U
20100715 TRICON 2, LLC 5 $2,954,000.00 74.10
NH 1602-109 US 160 JACKSON MTN SLIDE REPAI 5 M
20100715 TRICON 2, LLC 4 $684,000.00 105.13
C 0132-018 US40 & SH13 MOFFAT COUNTY CULV 3 R
20100715 ROCK SOLID SOLUTIONS CORPORATION 6 $767,243.50 73.86
C 0821-090 SH 82 SHALE BLUFFS MP 35.2 - M 3 M
20100722 STURGEON ELECTRIC COMPANY, INC 3 $556,425.00 114.87
SHE R300-161 070A 124-125 GARFIELD_040A 140 3 M
20100722 CONTRACT MANAGEMENT, INC. dba US ROADS 6 $269,274.50 107.64
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 5
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100617 APC CONSTRUCTION CO., LLC 5 $715,892.15 91.61
STA072A-032 5.4 MILES WEST OF SH 93 ON SH 1 R
20100617 TONY J. BELTRAMO & SONS, INC. 6 $432,535.05 96.05
SHE0504-059 SH50B AT BONFORTE BLVD. IN PUE 2 U
20100617 DIAMOND SURFACE, INC. 8 $1,112,535.62 134.23
IM 0762-046 I-76, BRUSH TO STERLING 4 R
20100617 K.E.C.I. COLORADO, INC. 2 $934,987.00 122.36
SHE R100-175 US 6 (MP 259), SH 9 (MP 109), 1
20100624 STRUCTURES, INC. 7 $2,908,694.00 84.47
FBR096A-039 SH 96: WEST OF HASWELL 2 P
20100624 SEMA CONSTRUCTION, INC. 4 $1,524,680.50 108.89
FBR 0703-357 STR. F-14-AZ WEST OF IDAHO SPR 1 M
20100701 CONNELL RESOURCES, INC. 5 $6,373,187.25 102.72
ES4 0853-072 SH 85 WYOMING SOUTH-STRUCTURES 4 R
20100701 BRANNAN SAND AND GRAVEL, LLC 4 $1,719,481.25 109.96
STA2854-118 US 285 TURKEY CREEK CANYON 1 M
20100708 MOUNTAIN CONSTRUCTORS, INC. 5 $543,250.87 100.65
SHE0073-008 SH7 AT YORK ST 6 P
20100708 NEW DESIGN CONSTRUCTION CO. 6 $2,238,350.22 101.13
SHE4701-120 C-470 ACRES G TO I-25 MEDIAN C 6 R
20100708 SEMA CONSTRUCTION, INC. 1 $2,006,630.00 84.22
FBR0242-047 US 24 AT MILE MARKER 270.8 AND 2 M
20100708 STRUCTURES, INC. 5 $271,164.00 88.88
C025A-011 I-25/SANTA FE F-16-DT 6 U
20100715 TRICON 2, LLC 5 $2,954,000.00 74.10
NH 1602-109 US 160 JACKSON MTN SLIDE REPAI 5 M
20100715 TRICON 2, LLC 4 $684,000.00 105.13
C 0132-018 US40 & SH13 MOFFAT COUNTY CULV 3 R
20100715 ROCK SOLID SOLUTIONS CORPORATION 6 $767,243.50 73.86
C 0821-090 SH 82 SHALE BLUFFS MP 35.2 - M 3 M
20100722 STURGEON ELECTRIC COMPANY, INC 3 $556,425.00 114.87
SHE R300-161 070A 124-125 GARFIELD_040A 140 3 M
20100722 CONTRACT MANAGEMENT, INC. dba US ROADS 6 $269,274.50 107.64
C021A-001 POWERS BLVD. AND DUBLIN 2 U
8/8/2019 2010 CDOT construction cost data book
12/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 6
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100729 CRUZ CONSTRUCTION, INC. 6 $597,486.70 78.16
C0252-410 I-25, TOMAH RD INTERCHAGE TO P 1 P
20100805 K.E.C.I. COLORADO, INC. 3 $448,904.00 112.26
SHE006A-044 US6, 19TH TO HERITAGE RD, GOLD 6 R
20100805 SEMA CONSTRUCTION, INC. CONTRACT REJ - NO REASON GIVEN
FBR 0241-053 US-24 MP 171.0 3 M
20100819 INTERFACE COMMUNICATIONS, COMPANY 5 $769,809.00 80.78
STA R600-381 I-70@32ND AVE, C470@ALAMEDA AN 6 P
20100819 TLM CONSTRUCTORS, INC. 8 $273,461.00 98.04
IM0761-207 I 76 WEST BOUND IN MORGAN COUN 4 R
20100826 MAYS CONCRETE, INC 4 $685,104.62 60.61
IM 0702-302 I-70 HANGING LAKE TUNNELS MP 1 3 M
20100902 TRICON 2, LLC 2 $2,100,000.00 116.37
NH 4912-001 NORTH OF CORTEZ 5 M
20100902 ROCKY MOUNTAIN MATERIALS & ASPHALT, INC. 5 $3,899,982.32 89.11
ES21151-025 SH 115 M.P. 8.9 TO M.P. 37.0, 2 R
20100909 HAMON CONTRACTORS, INC. 7 $2,333,728.50 109.90
STA083A-036 SH 83: E-470 TO PEORIA 6 U
20100909 SEMA CONSTRUCTION, INC. 5 $10,280,721.20 103.03
NH1601-061 ON U.S. 160 MP 11.50 TO MP 17. 5 R
20100909 DKS ENTERPRISES INC. 6 $978,397.50 94.80
ES6 0853-079 SH 85- I-76 TO SH 7 6 R
20100909 ASPHALT SPECIALTIES CO., INC. 5 $3,172,153.70 119.26
IM0703-361 I-70 MM 242 TO MM 247 1 M
20100916 NEW DESIGN CONSTRUCTION CO. 10 $3,107,176.94 99.34
STA177A-007 UNIVERSITY BLVD: C470, DRY CR 6 U
20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,919,895.28 65.95
NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R
20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,835,029.55 65.42
NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R
20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,794,755.66 66.47
NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R
20100923 OLDCASTLE SW GROUP, INC. 3 $3,509,854.00 106.91
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 6
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100729 CRUZ CONSTRUCTION, INC. 6 $597,486.70 78.16
C0252-410 I-25, TOMAH RD INTERCHAGE TO P 1 P
20100805 K.E.C.I. COLORADO, INC. 3 $448,904.00 112.26
SHE006A-044 US6, 19TH TO HERITAGE RD, GOLD 6 R
20100805 SEMA CONSTRUCTION, INC. CONTRACT REJ - NO REASON GIVEN
FBR 0241-053 US-24 MP 171.0 3 M
20100819 INTERFACE COMMUNICATIONS, COMPANY 5 $769,809.00 80.78
STA R600-381 I-70@32ND AVE, C470@ALAMEDA AN 6 P
20100819 TLM CONSTRUCTORS, INC. 8 $273,461.00 98.04
IM0761-207 I 76 WEST BOUND IN MORGAN COUN 4 R
20100826 MAYS CONCRETE, INC 4 $685,104.62 60.61
IM 0702-302 I-70 HANGING LAKE TUNNELS MP 1 3 M
20100902 TRICON 2, LLC 2 $2,100,000.00 116.37
NH 4912-001 NORTH OF CORTEZ 5 M
20100902 ROCKY MOUNTAIN MATERIALS & ASPHALT, INC. 5 $3,899,982.32 89.11
ES21151-025 SH 115 M.P. 8.9 TO M.P. 37.0, 2 R
20100909 HAMON CONTRACTORS, INC. 7 $2,333,728.50 109.90
STA083A-036 SH 83: E-470 TO PEORIA 6 U
20100909 SEMA CONSTRUCTION, INC. 5 $10,280,721.20 103.03
NH1601-061 ON U.S. 160 MP 11.50 TO MP 17. 5 R
20100909 DKS ENTERPRISES INC. 6 $978,397.50 94.80
ES6 0853-079 SH 85- I-76 TO SH 7 6 R
20100909 ASPHALT SPECIALTIES CO., INC. 5 $3,172,153.70 119.26
IM0703-361 I-70 MM 242 TO MM 247 1 M
20100916 NEW DESIGN CONSTRUCTION CO. 10 $3,107,176.94 99.34
STA177A-007 UNIVERSITY BLVD: C470, DRY CR 6 U
20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,919,895.28 65.95
NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R
20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,835,029.55 65.42
NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R
20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,794,755.66 66.47
NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R
20100923 OLDCASTLE SW GROUP, INC. 3 $3,509,854.00 106.91
ES35502-069 SH 550 MM 117.43 - 126.5 MONTR 3 L
8/8/2019 2010 CDOT construction cost data book
13/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 7
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100923 INTERSTATE HIGHWAY CONSTRUCTION 11 $1,766,906.69 78.78
ES1 0705-078 I-70, AGATE TO KANSAS BORDER 1 P
20100930 AMERICAN CIVIL CONSTRUCTORS, INC. 6 $15,693,969.00 100.23
STA 119A-051 SH 119 FROM SOUTH BLACK HAWK C 1 M
20100930 R.E. MONKS CONSTRUCTION COMPANY LLC 4 $3,567,183.63 85.63
NH1151-023 SH115A MP 38.3 TO 41.5 2 R
======= ================ ======
TOTALS 556 $300,728,877.05 83.07
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 7
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX
------------------------------------------------------------------------------------------------------------------------------------
20100923 INTERSTATE HIGHWAY CONSTRUCTION 11 $1,766,906.69 78.78
ES1 0705-078 I-70, AGATE TO KANSAS BORDER 1 P
20100930 AMERICAN CIVIL CONSTRUCTORS, INC. 6 $15,693,969.00 100.23
STA 119A-051 SH 119 FROM SOUTH BLACK HAWK C 1 M
20100930 R.E. MONKS CONSTRUCTION COMPANY LLC 4 $3,567,183.63 85.63
NH1151-023 SH115A MP 38.3 TO 41.5 2 R
======= ================ ======
TOTALS 556 $300,728,877.05 83.07
8/8/2019 2010 CDOT construction cost data book
14/527
8/8/2019 2010 CDOT construction cost data book
15/527
8/8/2019 2010 CDOT construction cost data book
16/527
8/8/2019 2010 CDOT construction cost data book
17/527
8/8/2019 2010 CDOT construction cost data book
18/527
8/8/2019 2010 CDOT construction cost data book
19/527
8/8/2019 2010 CDOT construction cost data book
20/527
8/8/2019 2010 CDOT construction cost data book
21/527
8/8/2019 2010 CDOT construction cost data book
22/527
8/8/2019 2010 CDOT construction cost data book
23/527
8/8/2019 2010 CDOT construction cost data book
24/527
8/8/2019 2010 CDOT construction cost data book
25/527
8/8/2019 2010 CDOT construction cost data book
26/527
8/8/2019 2010 CDOT construction cost data book
27/527
8/8/2019 2010 CDOT construction cost data book
28/527
8/8/2019 2010 CDOT construction cost data book
29/527
8/8/2019 2010 CDOT construction cost data book
30/527
8/8/2019 2010 CDOT construction cost data book
31/527
8/8/2019 2010 CDOT construction cost data book
32/527
8/8/2019 2010 CDOT construction cost data book
33/527
8/8/2019 2010 CDOT construction cost data book
34/527
8/8/2019 2010 CDOT construction cost data book
35/527
8/8/2019 2010 CDOT construction cost data book
36/527
8/8/2019 2010 CDOT construction cost data book
37/527
8/8/2019 2010 CDOT construction cost data book
38/527
8/8/2019 2010 CDOT construction cost data book
39/527
8/8/2019 2010 CDOT construction cost data book
40/527
8/8/2019 2010 CDOT construction cost data book
41/527
8/8/2019 2010 CDOT construction cost data book
42/527
8/8/2019 2010 CDOT construction cost data book
43/527
8/8/2019 2010 CDOT construction cost data book
44/527
8/8/2019 2010 CDOT construction cost data book
45/527
8/8/2019 2010 CDOT construction cost data book
46/527
8/8/2019 2010 CDOT construction cost data book
47/527
8/8/2019 2010 CDOT construction cost data book
48/527
8/8/2019 2010 CDOT construction cost data book
49/527
8/8/2019 2010 CDOT construction cost data book
50/527
8/8/2019 2010 CDOT construction cost data book
51/527
8/8/2019 2010 CDOT construction cost data book
52/527
8/8/2019 2010 CDOT construction cost data book
53/527
8/8/2019 2010 CDOT construction cost data book
54/527
8/8/2019 2010 CDOT construction cost data book
55/527
8/8/2019 2010 CDOT construction cost data book
56/527
8/8/2019 2010 CDOT construction cost data book
57/527
8/8/2019 2010 CDOT construction cost data book
58/527
8/8/2019 2010 CDOT construction cost data book
59/527
8/8/2019 2010 CDOT construction cost data book
60/527
8/8/2019 2010 CDOT construction cost data book
61/527
8/8/2019 2010 CDOT construction cost data book
62/527
8/8/2019 2010 CDOT construction cost data book
63/527
8/8/2019 2010 CDOT construction cost data book
64/527
8/8/2019 2010 CDOT construction cost data book
65/527
8/8/2019 2010 CDOT construction cost data book
66/527
8/8/2019 2010 CDOT construction cost data book
67/527
8/8/2019 2010 CDOT construction cost data book
68/527
8/8/2019 2010 CDOT construction cost data book
69/527
8/8/2019 2010 CDOT construction cost data book
70/527
8/8/2019 2010 CDOT construction cost data book
71/527
8/8/2019 2010 CDOT construction cost data book
72/527
8/8/2019 2010 CDOT construction cost data book
73/527
8/8/2019 2010 CDOT construction cost data book
74/527
8/8/2019 2010 CDOT construction cost data book
75/527
8/8/2019 2010 CDOT construction cost data book
76/527
8/8/2019 2010 CDOT construction cost data book
77/527
8/8/2019 2010 CDOT construction cost data book
78/527
8/8/2019 2010 CDOT construction cost data book
79/527
8/8/2019 2010 CDOT construction cost data book
80/527
8/8/2019 2010 CDOT construction cost data book
81/527
8/8/2019 2010 CDOT construction cost data book
82/527
8/8/2019 2010 CDOT construction cost data book
83/527
8/8/2019 2010 CDOT construction cost data book
84/527
8/8/2019 2010 CDOT construction cost data book
85/527
8/8/2019 2010 CDOT construction cost data book
86/527
8/8/2019 2010 CDOT construction cost data book
87/527
8/8/2019 2010 CDOT construction cost data book
88/527
8/8/2019 2010 CDOT construction cost data book
89/527
8/8/2019 2010 CDOT construction cost data book
90/527
8/8/2019 2010 CDOT construction cost data book
91/527
8/8/2019 2010 CDOT construction cost data book
92/527
8/8/2019 2010 CDOT construction cost data book
93/527
8/8/2019 2010 CDOT construction cost data book
94/527
8/8/2019 2010 CDOT construction cost data book
95/527
8/8/2019 2010 CDOT construction cost data book
96/527
8/8/2019 2010 CDOT construction cost data book
97/527
8/8/2019 2010 CDOT construction cost data book
98/527
8/8/2019 2010 CDOT construction cost data book
99/527
8/8/2019 2010 CDOT construction cost data book
100/527
8/8/2019 2010 CDOT construction cost data book
101/527
8/8/2019 2010 CDOT construction cost data book
102/527
8/8/2019 2010 CDOT construction cost data book
103/527
8/8/2019 2010 CDOT construction cost data book
104/527
8/8/2019 2010 CDOT construction cost data book
105/527
8/8/2019 2010 CDOT construction cost data book
106/527
8/8/2019 2010 CDOT construction cost data book
107/527
8/8/2019 2010 CDOT construction cost data book
108/527
8/8/2019 2010 CDOT construction cost data book
109/527
8/8/2019 2010 CDOT construction cost data book
110/527
8/8/2019 2010 CDOT construction cost data book
111/527
8/8/2019 2010 CDOT construction cost data book
112/527
8/8/2019 2010 CDOT construction cost data book
113/527
8/8/2019 2010 CDOT construction cost data book
114/527
8/8/2019 2010 CDOT construction cost data book
115/527
8/8/2019 2010 CDOT construction cost data book
116/527
8/8/2019 2010 CDOT construction cost data book
117/527
8/8/2019 2010 CDOT construction cost data book
118/527
8/8/2019 2010 CDOT construction cost data book
119/527
8/8/2019 2010 CDOT construction cost data book
120/527
8/8/2019 2010 CDOT construction cost data book
121/527
8/8/2019 2010 CDOT construction cost data book
122/527
8/8/2019 2010 CDOT construction cost data book
123/527
8/8/2019 2010 CDOT construction cost data book
124/527
8/8/2019 2010 CDOT construction cost data book
125/527
8/8/2019 2010 CDOT construction cost data book
126/527
8/8/2019 2010 CDOT construction cost data book
127/527
8/8/2019 2010 CDOT construction cost data book
128/527
8/8/2019 2010 CDOT construction cost data book
129/527
8/8/2019 2010 CDOT construction cost data book
130/527
8/8/2019 2010 CDOT construction cost data book
131/527
8/8/2019 2010 CDOT construction cost data book
132/527
8/8/2019 2010 CDOT construction cost data book
133/527
8/8/2019 2010 CDOT construction cost data book
134/527
8/8/2019 2010 CDOT construction cost data book
135/527
8/8/2019 2010 CDOT construction cost data book
136/527
8/8/2019 2010 CDOT construction cost data book
137/527
8/8/2019 2010 CDOT construction cost data book
138/527
8/8/2019 2010 CDOT construction cost data book
139/527
8/8/2019 2010 CDOT construction cost data book
140/527
8/8/2019 2010 CDOT construction cost data book
141/527
8/8/2019 2010 CDOT construction cost data book
142/527
8/8/2019 2010 CDOT construction cost data book
143/527
8/8/2019 2010 CDOT construction cost data book
144/527
8/8/2019 2010 CDOT construction cost data book
145/527
8/8/2019 2010 CDOT construction cost data book
146/527
8/8/2019 2010 CDOT construction cost data book
147/527
8/8/2019 2010 CDOT construction cost data book
148/527
8/8/2019 2010 CDOT construction cost data book
149/527
8/8/2019 2010 CDOT construction cost data book
150/527
8/8/2019 2010 CDOT construction cost data book
151/527
8/8/2019 2010 CDOT construction cost data book
152/527
8/8/2019 2010 CDOT construction cost data book
153/527
8/8/2019 2010 CDOT construction cost data book
154/527
8/8/2019 2010 CDOT construction cost data book
155/527
8/8/2019 2010 CDOT construction cost data book
156/527
8/8/2019 2010 CDOT construction cost data book
157/527
8/8/2019 2010 CDOT construction cost data book
158/527
8/8/2019 2010 CDOT construction cost data book
159/527
8/8/2019 2010 CDOT construction cost data book
160/527
8/8/2019 2010 CDOT construction cost data book
161/527
8/8/2019 2010 CDOT construction cost data book
162/527
8/8/2019 2010 CDOT construction cost data book
163/527
8/8/2019 2010 CDOT construction cost data book
164/527
8/8/2019 2010 CDOT construction cost data book
165/527
8/8/2019 2010 CDOT construction cost data book
166/527
8/8/2019 2010 CDOT construction cost data book
167/527
8/8/2019 2010 CDOT construction cost data book
168/527
8/8/2019 2010 CDOT construction cost data book
169/527
8/8/2019 2010 CDOT construction cost data book
170/527
8/8/2019 2010 CDOT construction cost data book
171/527
8/8/2019 2010 CDOT construction cost data book
172/527
8/8/2019 2010 CDOT construction cost data book
173/527
8/8/2019 2010 CDOT construction cost data book
174/527
8/8/2019 2010 CDOT construction cost data book
175/527
8/8/2019 2010 CDOT construction cost data book
176/527
8/8/2019 2010 CDOT construction cost data book
177/527
8/8/2019 2010 CDOT construction cost data book
178/527
8/8/2019 2010 CDOT construction cost data book
179/527
8/8/2019 2010 CDOT construction cost data book
180/527
8/8/2019 2010 CDOT construction cost data book
181/527
8/8/2019 2010 CDOT construction cost data book
182/527
8/8/2019 2010 CDOT construction cost data book
183/527
8/8/2019 2010 CDOT construction cost data book
184/527
8/8/2019 2010 CDOT construction cost data book
185/527
8/8/2019 2010 CDOT construction cost data book
186/527
8/8/2019 2010 CDOT construction cost data book
187/527
8/8/2019 2010 CDOT construction cost data book
188/527
8/8/2019 2010 CDOT construction cost data book
189/527
8/8/2019 2010 CDOT construction cost data book
190/527
8/8/2019 2010 CDOT construction cost data book
191/527
8/8/2019 2010 CDOT construction cost data book
192/527
8/8/2019 2010 CDOT construction cost data book
193/527
8/8/2019 2010 CDOT construction cost data book
194/527
8/8/2019 2010 CDOT construction cost data book
195/527
8/8/2019 2010 CDOT construction cost data book
196/527
8/8/2019 2010 CDOT construction cost data book
197/527
8/8/2019 2010 CDOT construction cost data book
198/527
8/8/2019 2010 CDOT construction cost data book
199/527
8/8/2019 2010 CDOT construction cost data book
200/527
8/8/2019 2010 CDOT construction cost data book
201/527
8/8/2019 2010 CDOT construction cost data book
202/527
8/8/2019 2010 CDOT construction cost data book
203/527
8/8/2019 2010 CDOT construction cost data book
204/527
8/8/2019 2010 CDOT construction cost data book
205/527
8/8/2019 2010 CDOT construction cost data book
206/527
8/8/2019 2010 CDOT construction cost data book
207/527
8/8/2019 2010 CDOT construction cost data book
208/527
8/8/2019 2010 CDOT construction cost data book
209/527
8/8/2019 2010 CDOT construction cost data book
210/527
8/8/2019 2010 CDOT construction cost data book
211/527
8/8/2019 2010 CDOT construction cost data book
212/527
8/8/2019 2010 CDOT construction cost data book
213/527
8/8/2019 2010 CDOT construction cost data book
214/527
8/8/2019 2010 CDOT construction cost data book
215/527
8/8/2019 2010 CDOT construction cost data book
216/527
8/8/2019 2010 CDOT construction cost data book
217/527
8/8/2019 2010 CDOT construction cost data book
218/527
8/8/2019 2010 CDOT construction cost data book
219/527
8/8/2019 2010 CDOT construction cost data book
220/527
8/8/2019 2010 CDOT construction cost data book
221/527
8/8/2019 2010 CDOT construction cost data book
222/527
8/8/2019 2010 CDOT construction cost data book
223/527
8/8/2019 2010 CDOT construction cost data book
224/527
8/8/2019 2010 CDOT construction cost data book
225/527
8/8/2019 2010 CDOT construction cost data book
226/527
8/8/2019 2010 CDOT construction cost data book
227/527
8/8/2019 2010 CDOT construction cost data book
228/527
8/8/2019 2010 CDOT construction cost data book
229/527
8/8/2019 2010 CDOT construction cost data book
230/527
8/8/2019 2010 CDOT construction cost data book
231/527
8/8/2019 2010 CDOT construction cost data book
232/527
8/8/2019 2010 CDOT construction cost data book
233/527
8/8/2019 2010 CDOT construction cost data book
234/527
8/8/2019 2010 CDOT construction cost data book
235/527
8/8/2019 2010 CDOT construction cost data book
236/527
8/8/2019 2010 CDOT construction cost data book
237/527
8/8/2019 2010 CDOT construction cost data book
238/527
8/8/2019 2010 CDOT construction cost data book
239/527
8/8/2019 2010 CDOT construction cost data book
240/527
8/8/2019 2010 CDOT construction cost data book
241/527
8/8/2019 2010 CDOT construction cost data book
242/527
8/8/2019 2010 CDOT construction cost data book
243/527
8/8/2019 2010 CDOT construction cost data book
244/527
8/8/2019 2010 CDOT construction cost data book
245/527
8/8/2019 2010 CDOT construction cost data book
246/527
8/8/2019 2010 CDOT construction cost data book
247/527
8/8/2019 2010 CDOT construction cost data book
248/527
8/8/2019 2010 CDOT construction cost data book
249/527
8/8/2019 2010 CDOT construction cost data book
250/527
8/8/2019 2010 CDOT construction cost data book
251/527
8/8/2019 2010 CDOT construction cost data book
252/527
8/8/2019 2010 CDOT construction cost data book
253/527
8/8/2019 2010 CDOT construction cost data book
254/527
8/8/2019 2010 CDOT construction cost data book
255/527
8/8/2019 2010 CDOT construction cost data book
256/527
8/8/2019 2010 CDOT construction cost data book
257/527
8/8/2019 2010 CDOT construction cost data book
258/527
8/8/2019 2010 CDOT construction cost data book
259/527
8/8/2019 2010 CDOT construction cost data book
260/527
8/8/2019 2010 CDOT construction cost data book
261/527
8/8/2019 2010 CDOT construction cost data book
262/527
8/8/2019 2010 CDOT construction cost data book
263/527
8/8/2019 2010 CDOT construction cost data book
264/527
8/8/2019 2010 CDOT construction cost data book
265/527
8/8/2019 2010 CDOT construction cost data book
266/527
8/8/2019 2010 CDOT construction cost data book
267/527
8/8/2019 2010 CDOT construction cost data book
268/527
8/8/2019 2010 CDOT construction cost data book
269/527
8/8/2019 2010 CDOT construction cost data book
270/527
8/8/2019 2010 CDOT construction cost data book
271/527
8/8/2019 2010 CDOT construction cost data book
272/527
8/8/2019 2010 CDOT construction cost data book
273/527
8/8/2019 2010 CDOT construction cost data book
274/527
8/8/2019 2010 CDOT construction cost data book
275/527
8/8/2019 2010 CDOT construction cost data book
276/527
8/8/2019 2010 CDOT construction cost data book
277/527
8/8/2019 2010 CDOT construction cost data book
278/527
8/8/2019 2010 CDOT construction cost data book
279/527
8/8/2019 2010 CDOT construction cost data book
280/527
8/8/2019 2010 CDOT construction cost data book
281/527
8/8/2019 2010 CDOT construction cost data book
282/527
8/8/2019 2010 CDOT construction cost data book
283/527
8/8/2019 2010 CDOT construction cost data book
284/527
8/8/2019 2010 CDOT construction cost data book
285/527
8/8/2019 2010 CDOT construction cost data book
286/527
8/8/2019 2010 CDOT construction cost data book
287/527
8/8/2019 2010 CDOT construction cost data book
288/527
8/8/2019 2010 CDOT construction cost data book
289/527
8/8/2019 2010 CDOT construction cost data book
290/527
8/8/2019 2010 CDOT construction cost data book
291/527
8/8/2019 2010 CDOT construction cost data book
292/527
8/8/2019 2010 CDOT construction cost data book
293/527
8/8/2019 2010 CDOT construction cost data book
294/527
8/8/2019 2010 CDOT construction cost data book
295/527
8/8/2019 2010 CDOT construction cost data book
296/527
8/8/2019 2010 CDOT construction cost data book
297/527
8/8/2019 2010 CDOT construction cost data book
298/527
8/8/2019 2010 CDOT construction cost data book
299/527
8/8/2019 2010 CDOT construction cost data book
300/527
8/8/2019 2010 CDOT construction cost data book
301/527
8/8/2019 2010 CDOT construction cost data book
302/527
8/8/2019 2010 CDOT construction cost data book
303/527
8/8/2019 2010 CDOT construction cost data book
304/527
8/8/2019 2010 CDOT construction cost data book
305/527
8/8/2019 2010 CDOT construction cost data book
306/527
8/8/2019 2010 CDOT construction cost data book
307/527
8/8/2019 2010 CDOT construction cost data book
308/527
8/8/2019 2010 CDOT construction cost data book
309/527
8/8/2019 2010 CDOT construction cost data book
310/527
8/8/2019 2010 CDOT construction cost data book
311/527
8/8/2019 2010 CDOT construction cost data book
312/527
8/8/2019 2010 CDOT construction cost data book
313/527
8/8/2019 2010 CDOT construction cost data book
314/527
8/8/2019 2010 CDOT construction cost data book
315/527
8/8/2019 2010 CDOT construction cost data book
316/527
8/8/2019 2010 CDOT construction cost data book
317/527
8/8/2019 2010 CDOT construction cost data book
318/527
8/8/2019 2010 CDOT construction cost data book
319/527
8/8/2019 2010 CDOT construction cost data book
320/527
8/8/2019 2010 CDOT construction cost data book
321/527
8/8/2019 2010 CDOT construction cost data book
322/527
8/8/2019 2010 CDOT construction cost data book
323/527
8/8/2019 2010 CDOT construction cost data book
324/527
8/8/2019 2010 CDOT construction cost data book
325/527
8/8/2019 2010 CDOT construction cost data book
326/527
8/8/2019 2010 CDOT construction cost data book
327/527
8/8/2019 2010 CDOT construction cost data book
328/527
8/8/2019 2010 CDOT construction cost data book
329/527
8/8/2019 2010 CDOT construction cost data book
330/527
8/8/2019 2010 CDOT construction cost data book
331/527
8/8/2019 2010 CDOT construction cost data book
332/527
8/8/2019 2010 CDOT construction cost data book
333/527
8/8/2019 2010 CDOT construction cost data book
334/527
8/8/2019 2010 CDOT construction cost data book
335/527
8/8/2019 2010 CDOT construction cost data book
336/527
8/8/2019 2010 CDOT construction cost data book
337/527
8/8/2019 2010 CDOT construction cost data book
338/527
8/8/2019 2010 CDOT construction cost data book
339/527
8/8/2019 2010 CDOT construction cost data book
340/527
8/8/2019 2010 CDOT construction cost data book
341/527
8/8/2019 2010 CDOT construction cost data book
342/527
8/8/2019 2010 CDOT construction cost data book
343/527
8/8/2019 2010 CDOT construction cost data book
344/527
8/8/2019 2010 CDOT construction cost data book
345/527
8/8/2019 2010 CDOT construction cost data book
346/527
8/8/2019 2010 CDOT construction cost data book
347/527
8/8/2019 2010 CDOT construction cost data book
348/527
8/8/2019 2010 CDOT construction cost data book
349/527
8/8/2019 2010 CDOT construction cost data book
350/527
8/8/2019 2010 CDOT construction cost data book
351/527
8/8/2019 2010 CDOT construction cost data book
352/527
8/8/2019 2010 CDOT construction cost data book
353/527
8/8/2019 2010 CDOT construction cost data book
354/527
8/8/2019 2010 CDOT construction cost data book
355/527
8/8/2019 2010 CDOT construction cost data book
356/527
8/8/2019 2010 CDOT construction cost data book
357/527
8/8/2019 2010 CDOT construction cost data book
358/527
8/8/2019 2010 CDOT construction cost data book
359/527
8/8/2019 2010 CDOT construction cost data book
360/527
8/8/2019 2010 CDOT construction cost data book
361/527
8/8/2019 2010 CDOT construction cost data book
362/527
8/8/2019 2010 CDOT construction cost data book
363/527
8/8/2019 2010 CDOT construction cost data book
364/527
8/8/2019 2010 CDOT construction cost data book
365/527
8/8/2019 2010 CDOT construction cost data book
366/527
8/8/2019 2010 CDOT construction cost data book
367/527
8/8/2019 2010 CDOT construction cost data book
368/527
8/8/2019 2010 CDOT construction cost data book
369/527
8/8/2019 2010 CDOT construction cost data book
370/527
8/8/2019 2010 CDOT construction cost data book
371/527
8/8/2019 2010 CDOT construction cost data book
372/527
8/8/2019 2010 CDOT construction cost data book
373/527
8/8/2019 2010 CDOT construction cost data book
374/527
8/8/2019 2010 CDOT construction cost data book
375/527
8/8/2019 2010 CDOT construction cost data book
376/527
8/8/2019 2010 CDOT construction cost data book
377/527
8/8/2019 2010 CDOT construction cost data book
378/527
8/8/2019 2010 CDOT construction cost data book
379/527
8/8/2019 2010 CDOT construction cost data book
380/527
8/8/2019 2010 CDOT construction cost data book
381/527
8/8/2019 2010 CDOT construction cost data book
382/527
8/8/2019 2010 CDOT construction cost data book
383/527
8/8/2019 2010 CDOT construction cost data book
384/527
8/8/2019 2010 CDOT construction cost data book
385/527
8/8/2019 2010 CDOT construction cost data book
386/527
8/8/2019 2010 CDOT construction cost data book
387/527
8/8/2019 2010 CDOT construction cost data book
388/527
8/8/2019 2010 CDOT construction cost data book
389/527
8/8/2019 2010 CDOT construction cost data book
390/527
8/8/2019 2010 CDOT construction cost data book
391/527
8/8/2019 2010 CDOT construction cost data book
392/527
8/8/2019 2010 CDOT construction cost data book
393/527
8/8/2019 2010 CDOT construction cost data book
394/527
8/8/2019 2010 CDOT construction cost data book
395/527
8/8/2019 2010 CDOT construction cost data book
396/527
8/8/2019 2010 CDOT construction cost data book
397/527
8/8/2019 2010 CDOT construction cost data book
398/527
8/8/2019 2010 CDOT construction cost data book
399/527
8/8/2019 2010 CDOT construction cost data book
400/527
8/8/2019 2010 CDOT construction cost data book
401/527
8/8/2019 2010 CDOT construction cost data book
402/527
8/8/2019 2010 CDOT construction cost data book
403/527
8/8/2019 2010 CDOT construction cost data book
404/527
8/8/2019 2010 CDOT construction cost data book
405/527
8/8/2019 2010 CDOT construction cost data book
406/527
8/8/2019 2010 CDOT construction cost data book
407/527
8/8/2019 2010 CDOT construction cost data book
408/527
8/8/2019 2010 CDOT construction cost data book
409/527
8/8/2019 2010 CDOT construction cost data book
410/527
8/8/2019 2010 CDOT construction cost data book
411/527
8/8/2019 2010 CDOT construction cost data book
412/527
8/8/2019 2010 CDOT construction cost data book
413/527
8/8/2019 2010 CDOT construction cost data book
414/527
8/8/2019 2010 CDOT construction cost data book
415/527
8/8/2019 2010 CDOT construction cost data book
416/527
8/8/2019 2010 CDOT construction cost data book
417/527
8/8/2019 2010 CDOT construction cost data book
418/527
8/8/2019 2010 CDOT construction cost data book
419/527
8/8/2019 2010 CDOT construction cost data book
420/527
8/8/2019 2010 CDOT construction cost data book
421/527
8/8/2019 2010 CDOT construction cost data book
422/527
8/8/2019 2010 CDOT construction cost data book
423/527
8/8/2019 2010 CDOT construction cost data book
424/527
8/8/2019 2010 CDOT construction cost data book
425/527
8/8/2019 2010 CDOT construction cost data book
426/527
8/8/2019 2010 CDOT construction cost data book
427/527
8/8/2019 2010 CDOT construction cost data book
428/527
8/8/2019 2010 CDOT construction cost data book
429/527
8/8/2019 2010 CDOT construction cost data book
430/527
8/8/2019 2010 CDOT construction cost data book
431/527
8/8/2019 2010 CDOT construction cost data book
432/527
8/8/2019 2010 CDOT construction cost data book
433/527
8/8/2019 2010 CDOT construction cost data book
434/527
8/8/2019 2010 CDOT construction cost data book
435/527
8/8/2019 2010 CDOT construction cost data book
436/527
8/8/2019 2010 CDOT construction cost data book
437/527
8/8/2019 2010 CDOT construction cost data book
438/527
8/8/2019 2010 CDOT construction cost data book
439/527
8/8/2019 2010 CDOT construction cost data book
440/527
8/8/2019 2010 CDOT construction cost data book
441/527
8/8/2019 2010 CDOT construction cost data book
442/527
8/8/2019 2010 CDOT construction cost data book
443/527
8/8/2019 2010 CDOT construction cost data book
444/527
8/8/2019 2010 CDOT construction cost data book
445/527
8/8/2019 2010 CDOT construction cost data book
446/527
8/8/2019 2010 CDOT construction cost data book
447/527
8/8/2019 2010 CDOT construction cost data book
448/527
8/8/2019 2010 CDOT construction cost data book
449/527
8/8/2019 2010 CDOT construction cost data book
450/527
8/8/2019 2010 CDOT construction cost data book
451/527
8/8/2019 2010 CDOT construction cost data book
452/527
8/8/2019 2010 CDOT construction cost data book
453/527
8/8/2019 2010 CDOT construction cost data book
454/527
8/8/2019 2010 CDOT construction cost data book
455/527
8/8/2019 2010 CDOT construction cost data book
456/527
8/8/2019 2010 CDOT construction cost data book
457/527
8/8/2019 2010 CDOT construction cost data book
458/527
8/8/2019 2010 CDOT construction cost data book
459/527
8/8/2019 2010 CDOT construction cost data book
460/527
8/8/2019 2010 CDOT construction cost data book
461/527
8/8/2019 2010 CDOT construction cost data book
462/527
8/8/2019 2010 CDOT construction cost data book
463/527
8/8/2019 2010 CDOT construction cost data book
464/527
8/8/2019 2010 CDOT construction cost data book
465/527
8/8/2019 2010 CDOT construction cost data book
466/527
8/8/2019 2010 CDOT construction cost data book
467/527
8/8/2019 2010 CDOT construction cost data book
468/527
8/8/2019 2010 CDOT construction cost data book
469/527
8/8/2019 2010 CDOT construction cost data book
470/527
8/8/2019 2010 CDOT construction cost data book
471/527
8/8/2019 2010 CDOT construction cost data book
472/527
8/8/2019 2010 CDOT construction cost data book
473/527
8/8/2019 2010 CDOT construction cost data book
474/527
8/8/2019 2010 CDOT construction cost data book
475/527
8/8/2019 2010 CDOT construction cost data book
476/527
8/8/2019 2010 CDOT construction cost data book
477/527
8/8/2019 2010 CDOT construction cost data book
478/527
8/8/2019 2010 CDOT construction cost data book
479/527
8/8/2019 2010 CDOT construction cost data book
480/527
8/8/2019 2010 CDOT construction cost data book
481/527
8/8/2019 2010 CDOT construction cost data book
482/527
8/8/2019 2010 CDOT construction cost data book
483/527
8/8/2019 2010 CDOT construction cost data book
484/527
8/8/2019 2010 CDOT construction cost data book
485/527
8/8/2019 2010 CDOT construction cost data book
486/527
8/8/2019 2010 CDOT construction cost data book
487/527
8/8/2019 2010 CDOT construction cost data book
488/527
8/8/2019 2010 CDOT construction cost data book
489/527
8/8/2019 2010 CDOT construction cost data book
490/527
8/8/2019 2010 CDOT construction cost data book
491/527
8/8/2019 2010 CDOT construction cost data book
492/527
8/8/2019 2010 CDOT construction cost data book
493/527
8/8/2019 2010 CDOT construction cost data book
494/527
8/8/2019 2010 CDOT construction cost data book
495/527
8/8/2019 2010 CDOT construction cost data book
496/527
8/8/2019 2010 CDOT construction cost data book
497/527
8/8/2019 2010 CDOT construction cost data book
498/527
8/8/2019 2010 CDOT construction cost data book
499/527
8/8/2019 2010 CDOT construction cost data book
500/527
8/8/2019 2010 CDOT construction cost data book
501/527
8/8/2019 2010 CDOT construction cost data book
502/527
8/8/2019 2010 CDOT construction cost data book
503/527
8/8/2019 2010 CDOT construction cost data book
504/527
8/8/2019 2010 CDOT construction cost data book
505/527
8/8/2019 2010 CDOT construction cost data book
506/527
8/8/2019 2010 CDOT construction cost data book
507/527
8/8/2019 2010 CDOT construction cost data book
508/527
8/8/2019 2010 CDOT construction cost data book
509/527
8/8/2019 2010 CDOT construction cost data book
510/527
8/8/2019 2010 CDOT construction cost data book
511/527
8/8/2019 2010 CDOT construction cost data book
512/527
8/8/2019 2010 CDOT construction cost data book
513/527
8/8/2019 2010 CDOT construction cost data book
514/527
8/8/2019 2010 CDOT construction cost data book
515/527
8/8/2019 2010 CDOT construction cost data book
516/527
8/8/2019 2010 CDOT construction cost data book
517/527
8/8/2019 2010 CDOT construction cost data book
518/527
8/8/2019 2010 CDOT construction cost data book
519/527
8/8/2019 2010 CDOT construction cost data book
520/527
8/8/2019 2010 CDOT construction cost data book
521/527
8/8/2019 2010 CDOT construction cost data book
522/527
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX------------------------------------------------------------------------------------------------------------------------------------
20100304 APC SOUTHERN CONSTRUCTION COMPANY, LLC 6 $5,165,043.41 98.73
ES5 1602-125 US 160 SHAW CREEK TO DEL NORTE 5 R
20100304 LAFARGE NORTH AMERICA, INC 6 $1,509,306.60 77.31
ES6 002A-003 SH 2, 62ND AVE. TO QUEBEC PARK 6 U
20100311 INTERFACE COMMUNICATIONS, COMPANY 4 $70,059.48 87.77
STAR400-249 SH 257 MP 9.558 AND SH 7B MP 5 4 R
20100311 KOLBE STRIPING INC. 4 $585,181.00 116.61
MPR200-172 SH287 A & B AND US50 B 2 P
20100318 LAFARGE NORTH AMERICA, INC 5 $3,299,328.29 92.90
STA0853-065 ON US 85 IN WELD COUNTY 4 U
20100318 STURGEON ELECTRIC COMPANY, INC 4 $577,954.00 101.16
C0703-356 I-70, EAST OF SILVERTHORN TO L 1 M
20100318 WALSENBURG SAND AND GRAVEL 7 $1,837,111.00 104.92
FBR 069A-026 0.5 MILES S/O THE TOWN OF FARI 2 L
20100318 EDWARD KRAEMER & SONS INC. 5 $17,172,771.47 31.38
ES6 0852-103 - CONCRETE ALT US 85 / C-470 INTERCHANGE (STA 6 R
ES6 0852-103 - DEFAULT ALT US 85 / C-470 INTERCHANGE (STA 6 R
ES6 0852-103 - STEEL ALT US 85 / C-470 INTERCHANGE (STA 6 R
20100318 FLATIRON CONSTRUCTORS, INC. 4 $620,830.00 84.08
ER 0702-307 I-70 MP 124-126 IN GARFIELD CO 3 M
20100325 BRANNAN SAND AND GRAVEL, LLC 6 $2,378,047.60 89.14
STA157A-010 SH 157A IN BOULDER COUNTY 4 R
20100401 STRUCTURES, INC. 8 $6,959,186.05 87.91
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX------------------------------------------------------------------------------------------------------------------------------------
20100304 APC SOUTHERN CONSTRUCTION COMPANY, LLC 6 $5,165,043.41 98.73
ES5 1602-125 US 160 SHAW CREEK TO DEL NORTE 5 R
20100304 LAFARGE NORTH AMERICA, INC 6 $1,509,306.60 77.31
ES6 002A-003 SH 2, 62ND AVE. TO QUEBEC PARK 6 U
20100311 INTERFACE COMMUNICATIONS, COMPANY 4 $70,059.48 87.77
STAR400-249 SH 257 MP 9.558 AND SH 7B MP 5 4 R
20100311 KOLBE STRIPING INC. 4 $585,181.00 116.61
MPR200-172 SH287 A & B AND US50 B 2 P
20100318 LAFARGE NORTH AMERICA, INC 5 $3,299,328.29 92.90
STA0853-065 ON US 85 IN WELD COUNTY 4 U
20100318 STURGEON ELECTRIC COMPANY, INC 4 $577,954.00 101.16
C0703-356 I-70, EAST OF SILVERTHORN TO L 1 M
20100318 WALSENBURG SAND AND GRAVEL 7 $1,837,111.00 104.92
FBR 069A-026 0.5 MILES S/O THE TOWN OF FARI 2 L
20100318 EDWARD KRAEMER & SONS INC. 5 $17,172,771.47 31.38
ES6 0852-103 - CONCRETE ALT US 85 / C-470 INTERCHANGE (STA 6 R
ES6 0852-103 - DEFAULT ALT US 85 / C-470 INTERCHANGE (STA 6 R
ES6 0852-103 - STEEL ALT US 85 / C-470 INTERCHANGE (STA 6 R
20100318 FLATIRON CONSTRUCTORS, INC. 4 $620,830.00 84.08
ER 0702-307 I-70 MP 124-126 IN GARFIELD CO 3 M
20100325 BRANNAN SAND AND GRAVEL, LLC 6 $2,378,047.60 89.14
STA157A-010 SH 157A IN BOULDER COUNTY 4 R
20100401 STRUCTURES, INC. 8 $6,959,186.05 87.91
8/8/2019 2010 CDOT construction cost data book
523/527
, , ,
BR M356-022 80TH OVER US36 ON WESTMINISTER 6 U
20100401 LAFARGE NORTH AMERICA, INC 6 $3,808,889.81 92.81
NHC010-100 SH2, ALAMEDA TO MLK 6 U
20100401 SCHMIDT CONSTRUCTION COMPANY 3 $2,641,487.47 91.06
STA R200-167 SH 21 BRADLEY RD. TO N/O DRENN 2 R
20100401 STURGEON ELECTRIC COMPANY, INC 4 $122,513.00 90.87
C0703-355 I-70, EAST OF SILVER PLUME TO 1 M
20100401 UNITED COMPANIES OF MESA COUNTY 3 $849,450.25 94.45STA 0241-054 SH 24 BATTLE MOUNTAIN CHIP SEA 3 M
20100408 LAFARGE NORTH AMERICA, INC 6 $2,662,412.20 88.57
STA2854-119 US 285 DEER CREEK TO RICHMOND 1 M
20100408 ELAM CONSTRUCTION, INC. 3 $3,529,926.50 95.92
, , ,
BR M356-022 80TH OVER US36 ON WESTMINISTER 6 U
20100401 LAFARGE NORTH AMERICA, INC 6 $3,808,889.81 92.81
NHC010-100 SH2, ALAMEDA TO MLK 6 U
20100401 SCHMIDT CONSTRUCTION COMPANY 3 $2,641,487.47 91.06
STA R200-167 SH 21 BRADLEY RD. TO N/O DRENN 2 R
20100401 STURGEON ELECTRIC COMPANY, INC 4 $122,513.00 90.87
C0703-355 I-70, EAST OF SILVER PLUME TO 1 M
20100401 UNITED COMPANIES OF MESA COUNTY 3 $849,450.25 94.45STA 0241-054 SH 24 BATTLE MOUNTAIN CHIP SEA 3 M
20100408 LAFARGE NORTH AMERICA, INC 6 $2,662,412.20 88.57
STA2854-119 US 285 DEER CREEK TO RICHMOND 1 M
20100408 ELAM CONSTRUCTION, INC. 3 $3,529,926.50 95.92
NH5502-067 US 550 NORTH OF DURANGO ON MOL 5 M
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX------------------------------------------------------------------------------------------------------------------------------------
20100408 BRANNAN SAND AND GRAVEL, LLC 4 $4,268,360.97 80.01
IM0253-211 I-25 NB AND SB AT WCR 32 4 L
20100415 HAMON CONTRACTORS, INC. 6 $16,421,806.87 87.37
STU 0831-107 PARKER RD (SH 83) AND ARAPAHOE 6 U
20100415 ZAK DIRT, INC. 7 $2,894,701.75 80.23
NH 2873-157 SH 287:BROOMFIELD TO LAFAYETTE 6 R
20100415 CRUZ CONSTRUCTION, INC. 7 $427,135.50 77.01
C0761-205 I-76 NORTH OF WCR 8 IN WELD CO 4 L
20100422 INTERMOUNTAIN SLURRY SEAL, INC. 4 $588,793.08 96.40
NH 1603-026 US 160 FORT GARLAND EAST 5 R
20100422 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $805,394.81 94.32
IM0704-219 I70 WEST OF SIEBERT - EAST 1 P
20100422 INTERFACE COMMUNICATIONS, COMPANY 2 $182,171.81 102.14
C3921-011 SH 392 AND CR 31 INTERSECTION 4 R
20100422 W.L. CONTRACTORS, INC. 3 $218,837.75 94.92
C0931-028 INTERSECTION OF SH 93 AND SH 1 4 R
20100429 INTERSTATE HIGHWAY CONSTRUCTION 6 $20,293,515.37 95.34
IM 2254-074 I-225: MISSISSIPPI TO 2ND AVE 6 U
20100429 ARROW ELECTRIC SERVICE, INC. 6 $415,249.90 95.47
SHE045A-008 SH45(PUEBLO BLVD.) AND GOODNIG 2 U
20100429 LAFARGE NORTH AMERICA, INC 5 $5,399,788.69 83.49
IM0252-406 ON I-25 1 MI. S. OF PUEBLO THR 2 U
Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3
2010 Cost Data
PROJECTS BID FROM 01/01/10 THROUGH 09/30/10
------------------------------------------------------------------------------------------------------------------------------------
BID CONTRACTOR/
LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX------------------------------------------------------------------------------------------------------------------------------------
20100408 BRANNAN SAND AND GRAVEL, LLC 4 $4,268,360.97 80.01
IM0253-211 I-25 NB AND SB AT WCR 32 4 L
20100415 HAMON CONTRACTORS, INC. 6 $16,421,806.87 87.37
STU 0831-107 PARKER RD (SH 83) AND ARAPAHOE 6 U
20100415 ZAK DIRT, INC. 7 $2,894,701.75 80.23
NH 2873-157 SH 287:BROOMFIELD TO LAFAYETTE 6 R
20100415 CRUZ CONSTRUCTION, INC. 7 $427,135.50 77.01
C0761-205 I-76 NORTH OF WCR 8 IN WELD CO 4 L
20100422 INTERMOUNTAIN SLURRY SEAL, INC. 4 $588,793.08 96.40
NH 1603-026 US 160 FORT GARLAND EAST 5 R
20100422 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $805,394.81 94.32
IM0704-219 I70 WEST OF SIEBERT - EAST 1 P
20100422 INTERFACE COMMUNICATIONS, COMPANY 2 $182,171.81 102.14
C3921-011 SH 392 AND CR 31 INTERSECTION 4 R
20100422 W.L. CONTRACTORS, INC. 3 $218,837.75 94.92
C0931-028 INTERSECTION OF SH 93 AND SH 1 4 R
20100429 INTERSTATE HIGHWAY CONSTRUCTION 6 $20,293,515.37 95.34
IM 2254-074 I-225: MISSISSIPPI TO 2ND AVE 6 U
20100429 ARROW ELECTRIC SERVICE, INC. 6 $415,249.90 95.47
SHE045A-008 SH45(PUEBLO BLVD.) AND GOODNIG 2 U
20100429 LAFARGE NORTH AMERIC