2010 Fox Valley projects Doc Musekamp, Local Affairs. 2010 Substation construction and feeder work. Darboy Substation – Town of Harrison, CTH N, south of CTH KK - 34.5kV to 12kV substation built on existing company owned parcel - 25MVA transformer, 4 feeder exits - PowerPoint PPT Presentation
Citation preview
1
2010 Fox Valley projects
Doc Musekamp, Local Affairs
2
2010 Substation construction and feeder work
Darboy Substation – Town of Harrison, CTH N, south of CTH KK
- 34.5kV to 12kV substation built on existing company owned parcel
- 25MVA transformer, 4 feeder exits
- serves continuing residential growth and increasing commercial development in area
- Enclosed, “cabinet” style construction minimizes overhead steel with shorter profile
- Enhanced landscape plan at town request
- Construction started - Complete by late fall, 2010
3
Darboy Substation
4
Darboy Substation parcel
5
Darboy Substation rendering
6
2010 Substation construction and feeder work
Pearl Street Substation – CTH G, City of Seymour
- Retiring 2 existing 4kV substations
- New 12kV substation will allow bridging to Seymour and eliminate electric
“island”
- Provides for future growth and enhanced reliability
7
2010 Fox Valley projects – Electric
Cable replacements Replacing aging underground cable on an
annual, planned basis 24 projects for 2010 – Grand Chute to
Green Valley Working with affected customers and
communities to minimize impacts Will improve reliability in these areas
8
2010 Fox Valley projects – Electric
Facility Relocations Appleton – Wisconsin Avenue, CTH
JJ, S. Memorial Drive, Conkey Road Neenah – Green Bay Rd /
Winneconne Av. roundabout Outagamie County – STH 47, Black
Creek to Bonduel
9
2010 Fox Valley projects – Electric
Forestry
Construction related – Seymour, Freedom/Center Valley areas – 58 miles
Reliability related – Greenville and west Appleton areas – 20 miles
Maintenance related – STH 47 - Black Creek to Bonduel, Various areas – 154 miles
10
2010 Fox Valley projects - Gas
Little Chute gate station – line heater -complete replacement of all mechanical equipment and systems
Facility relocations – Lake Street (Menasha), Larsen Road (Clayton), Maple and Main Streets (Black Creek)
Western district projects – from Green Lake to Rice Lake to Marshfield
11
2010 Fox Valley projects
12
2010 Fox Valley projects
Taken together – the preceding represents an investment in excess of $ 10 million dollars in utility infrastructure for the Fox Valley area in 2010.
This investment enhances gas and electric reliability and safety while providing the basic utility services necessary to support the continued economic vitality of our area.
13
2010 Fox Valley projects
Questions ?
14
2010 Focus on Energy Update
Randy Sabel
Principal Account Manager
15
Focus Programs With Reduced Incentives
Custom Projects
Most Lighting
Air Compressor Equipped with VSD
Variable Frequency Drives
Energy Recovery Ventilators
New Construction whole building track incentive rate
Incentive Cap per Customer Tax ID
16
Focus Programs Removed
Compressed Air System Leak Survey and Repair
Heating and Cooling System Tune-up
Incentives for roof top units
Packaged Terminal A/C
3-Phase Electric Motor Incentive
Feasibility Studies for Energy Efficiency and Renewable Energy
Customer Technologies– LED and Induction Technology (including traffic lights and street lights)
17
2010 Focus Update